X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475052708040

Well Details

Well ID: 0475052708040
Loading map...
Location: 04/08-27-047-05W5/0
Location Alias: 04/08-27-47-05 W5M
Location Alias 2: 04/08-27-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 27
County/Municipality: Brazeau County
Well Name: BONTERRA 104 HZ PEMBINA 8-27-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0483824
License Date: 2017-06-02
License Status: Issued
Spud Date: 2017-12-28
Final Drill Date: 2018-01-02
Well Total Depth: 2988.00 m
Surface Hole Latitude: 53.079421
Surface Hole Longitude: -114.662211

For data sources see[1][2]

Well History

Date Event
2017-06-02 Obtained License
2017-12-29 Surface Casing Operation Performed
2017-12-30 Direction Drilling Operation Performed - Deviate
2017-12-31 Direction Drilling Operation Performed - Horizontal
2018-01-02 Finished Drilling
2018-01-02 Well Log Performed
2018-01-02 Well Mode changed to Drilled and Cased
2018-01-03 Production Casing Operation Performed
2018-01-03 Rig Released
2018-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-25 Well Began Production
2018-01-25 Well Fluid changed to Crude Oil
2018-01-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-28 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-30 1119.60 Deviate (5 - 79 degrees)
2017-12-31 1542.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-14 Multi-Stage Fracture 2951.90 2952.50 0
2018-01-14 Multi-Stage Fracture 2498.80 2500.80 0
2018-01-14 Multi-Stage Fracture 2448.40 2450.30 0
2018-01-15 Multi-Stage Fracture 2397.40 2399.30 0
2018-01-15 Multi-Stage Fracture 2347.40 2349.30 0
2018-01-15 Multi-Stage Fracture 2296.30 2298.20 0
2018-01-15 Multi-Stage Fracture 2245.90 2247.80 0
2018-01-15 Multi-Stage Fracture 2195.20 2197.10 0
2018-01-15 Multi-Stage Fracture 2144.60 2146.50 0
2018-01-15 Multi-Stage Fracture 2093.90 2095.80 0
2018-01-15 Multi-Stage Fracture 2042.80 2044.80 0
2018-01-14 Multi-Stage Fracture 2903.30 2905.20 0
2018-01-15 Multi-Stage Fracture 1993.00 1994.90 0
2018-01-15 Multi-Stage Fracture 1943.50 1945.40 0
2018-01-15 Multi-Stage Fracture 1893.00 1894.90 0
2018-01-15 Multi-Stage Fracture 1842.80 1844.70 0
2018-01-15 Multi-Stage Fracture 1792.10 1794.00 0
2018-01-15 Multi-Stage Fracture 1742.60 1744.50 0
2018-01-15 Multi-Stage Fracture 1691.70 1693.60 0
2018-01-15 Multi-Stage Fracture 1641.20 1643.20 0
2018-01-15 Multi-Stage Fracture 1590.60 1592.50 0
2018-01-14 Multi-Stage Fracture 2852.80 2854.80 0
2018-01-14 Multi-Stage Fracture 2802.40 2804.30 0
2018-01-14 Multi-Stage Fracture 2752.30 2754.20 0
2018-01-14 Multi-Stage Fracture 2701.40 2703.30 0
2018-01-14 Multi-Stage Fracture 2650.80 2652.70 0
2018-01-14 Multi-Stage Fracture 2600.90 2602.80 0
2018-01-14 Multi-Stage Fracture 2550.20 2552.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-14 2018-01-15 1,416 2,366 N/A
2 2018-01-14 2018-01-14 1,416 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.0997 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 10.4568 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.2364 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.02 N/A
dibromoacetonitrile 3252-43-5 100 0.02 N/A
non-hazardous ingredients Not Available 100 0.02 N/A
polyethylene glycol 25322-68-3 100 0.02 N/A
sodium bromide 7647-15-6 100 0.02 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0898 N/A
water Not Available 100 0.0898 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0466 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0466 N/A
non-hazardous ingredients Not Available 100 0.0466 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0409 N/A
non-hazardous ingredients Not Available 100 0.0409 N/A
2 Sand 30/50 Trican silica crystalline 14808-60-7 100 0.2644 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-09 2018-01-14 Surface Water - Runoff 2479

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7846 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 2113 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-03 No Incident Encountered 0.00 0.00
2018-01-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References