X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475051916000

Well Details

Well ID: 0475051916000
Loading map...
Location: 00/16-19-047-05W5/0
Location Alias: 00/16-19-47-05 W5M
Location Alias 2: 00/16-19-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 19
County/Municipality: Brazeau County
Well Name: SHINEBK PEM 16-19-47-5
Operator Name: TAQA North Ltd.
License Number: 0197284
License Date: 1997-01-28
License Status: Suspension
Spud Date: 1997-02-15
Final Drill Date: 1997-02-23
Well Total Depth: 2014.00 m
Surface Hole Latitude: 53.074168
Surface Hole Longitude: -114.711618

For data sources see[1][2]

Well History

Date Event
1997-01-28 Obtained License
1997-02-16 Surface Casing Operation Performed
1997-02-23 Finished Drilling
1997-02-23 Well Log Performed
1997-02-23 Well Mode changed to Drilled and Cased
1997-02-24 Drill Stem Test Performed
1997-02-26 Production Casing Operation Performed
1997-02-26 Rig Released
1997-03-03 Well Log Performed
1997-03-04 Well Log Performed
1997-03-05 Well Log Performed
1997-03-06 Perforation Treatment Performed - Jet Perforation
1997-03-06 Well Log Performed
1997-03-09 Perforation Treatment Performed - Fractured
1997-03-13 Perforation Treatment Performed - Jet Perforation
1997-03-13 Well Log Performed
1997-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-15 Perforation Treatment Performed - Cement Squeeze
1997-03-15 Plug Back Performed
1997-03-19 Well Log Performed
1997-03-31 Well Began Production
1997-03-31 Well Fluid changed to Crude Oil
1997-03-31 Well Mode changed to Pumping
2002-04-01 Well Fluid changed to Crude Oil
2002-04-01 Well Mode changed to Suspended
2010-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-10 Perforation Treatment Performed - Cement Plug
2010-09-10 Plug Back Performed
2010-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-11 Plug Back Performed
2010-09-11 Well Fluid changed to Crude Oil
2010-09-11 Well Log Performed
2010-09-11 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-06 Perforation 1464.00 1467.50 13
1997-03-09 Fracture 1464.00 1467.50 0
1997-03-13 Perforation 1155.00 1156.00 13
1997-03-15 Acid Treatment 1155.00 1156.00 0
1997-03-15 Cement Squeeze 1155.00 1156.00 0
2010-09-10 Cement Plug 1477.00 1485.00 0
2010-09-10 Packing Device Capped w/Cement 1448.00 1455.00 0
2010-09-11 Packing Device Capped w/Cement 1140.00 1148.00 0
2010-09-11 Packing Device Capped w/Cement 886.00 894.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6270 0.0 0.0 0.0
1998 8482 0.0 0.0 0.0
1999 552 0.0 0.0 0.0

For data sources see[5]

References