If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475033608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.09591,"lon":-114.296844,"icon":""}]} |
Location: 00/08-36-047-03W5/0 | |
Location Alias: 00/08-36-47-03 W5M | |
Location Alias 2: 00/08-36-047-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 03 | |
Section: 36 | |
County/Municipality: Leduc County | |
Well Name: TALISMAN PEM 8-36-47-3 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0027977 | |
License Date: 1965-03-15 | |
License Status: RecCertified | |
Spud Date: 1965-06-08 | |
Final Drill Date: 1965-06-13 | |
Well Total Depth: 1027.20 m | |
Surface Hole Latitude: 53.095910 | |
Surface Hole Longitude: -114.296844 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-03-15 | Obtained License |
1965-06-13 | Finished Drilling |
1965-06-13 | Well Mode changed to Drilled and Cased |
1965-06-14 | Production Casing Operation Performed |
1965-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-07-13 | Perforation Treatment Performed - Jet Perforation |
1965-07-14 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-07-14 | Perforation Treatment Performed - Fractured |
1965-07-25 | Well Began Production |
1965-07-25 | Well Fluid changed to Crude Oil |
1965-07-25 | Well Mode changed to Pumping |
1973-08-01 | Perforation Treatment Performed - Selective Jet Perforations |
1973-12-04 | Well Began Injection |
1973-12-04 | Well Fluid changed to Water |
1973-12-04 | Well Type changed to Injection |
1974-10-08 | Well Fluid changed to Water |
1974-10-08 | Well Mode changed to Suspended |
1974-10-08 | Well Type changed to Injection |
1975-10-22 | Well Fluid changed to Water |
1975-10-22 | Well Type changed to Injection |
1995-12-31 | Well Fluid changed to Water |
1995-12-31 | Well Mode changed to Suspended |
1995-12-31 | Well Type changed to Injection |
2000-09-25 | Well Log Performed |
2000-09-26 | Well Log Performed |
2000-09-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-27 | Plug Back Performed |
2000-09-28 | Perforation Treatment Performed - Jet Perforation |
2000-09-28 | Well Log Performed |
2000-10-20 | Perforation Treatment Performed - Cement Plug |
2000-10-20 | Perforation Treatment Performed - Remedial Casing |
2000-10-24 | Well Abandoned |
2000-10-24 | Well Fluid changed to Water |
2000-10-24 | Well Mode changed to Abandoned |
2000-10-24 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-07-13 | Perforation | 1002.80 | 1003.40 | 7 |
2000-10-20 | Remedial Casing Cementing | 272.00 | 273.00 | 0 |
2000-10-20 | Cement Plug | 24.90 | 273.00 | 0 |
1965-07-13 | Perforation | 1008.00 | 1008.60 | 10 |
1965-07-13 | Acid Treatment | 1002.80 | 1008.60 | 0 |
1965-07-14 | Acid Wash | 1002.80 | 1008.60 | 0 |
1965-07-14 | Fracture | 1002.80 | 1008.60 | 0 |
1973-08-01 | Selective Jet Perforations | 999.70 | 1000.40 | 0 |
1973-08-01 | Selective Jet Perforations | 1001.60 | 1001.60 | 0 |
2000-09-27 | Packing Device Capped w/Cement | 688.20 | 985.00 | 0 |
2000-09-28 | Perforation | 272.00 | 273.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 7833 | 0.0 | 0.0 | 0.0 |
1968 | 8531 | 0.0 | 0.0 | 0.0 |
1969 | 8567 | 0.0 | 0.0 | 0.0 |
1970 | 7656 | 0.0 | 0.0 | 0.0 |
1971 | 8427 | 0.0 | 0.0 | 0.0 |
1972 | 7984 | 0.0 | 0.0 | 0.0 |
1973 | 6287 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]