X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475033501000

Well Details

Well ID: 0475033501000
Loading map...
Location: 00/01-35-047-03W5/0
Location Alias: 00/01-35-47-03 W5M
Location Alias 2: 00/01-35-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 35
County/Municipality: Leduc County
Well Name: DAYLIGHT HZ PEMBINA 1-35-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0430270
License Date: 2011-01-18
License Status: Issued
Spud Date: 2011-03-04
Final Drill Date: 2011-03-19
Well Total Depth: 2797.00 m
Surface Hole Latitude: 53.091960
Surface Hole Longitude: -114.345671

For data sources see[1][2]

Well History

Date Event
2011-01-18 Obtained License
2011-02-16 Well Log Performed
2011-03-04 Lost Circulation Occurred
2011-03-06 Surface Casing Operation Performed
2011-03-08 Direction Drilling Operation Performed - Horizontal
2011-03-11 Intermediate Casing Operation Performed
2011-03-16 Well Log Performed
2011-03-19 Finished Drilling
2011-03-19 Well Mode changed to Drilled and Cased
2011-03-23 Liner Casing Operation Performed
2011-03-24 Rig Released
2011-03-27 Well Log Performed
2011-04-01 Well Began Production
2011-04-01 Well Fluid changed to Crude Oil
2011-04-01 Well Mode changed to Pumping
2011-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-02 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-08 1083.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-04-02 Open Hole/Barefoot Completion 2792.00 2797.00 0
2011-04-02 Multi-Stage Fracture 2161.40 2161.50 0
2011-04-02 Multi-Stage Fracture 2093.70 2093.80 0
2011-04-02 Multi-Stage Fracture 2014.00 2014.10 0
2011-04-02 Multi-Stage Fracture 1944.80 1944.90 0
2011-04-02 Multi-Stage Fracture 1864.80 1864.90 0
2011-04-02 Multi-Stage Fracture 1787.90 1788.00 0
2011-04-02 Multi-Stage Fracture 1718.60 1718.70 0
2011-04-02 Multi-Stage Fracture 1639.10 1639.20 0
2011-04-02 Multi-Stage Fracture 1569.30 1569.40 0
2011-04-02 Multi-Stage Fracture 1489.90 1490.00 0
2011-04-02 Multi-Stage Fracture 2769.50 2769.60 0
2011-04-02 Multi-Stage Fracture 2683.40 2683.50 0
2011-04-02 Multi-Stage Fracture 2604.50 2604.60 0
2011-04-02 Multi-Stage Fracture 2537.80 2537.90 0
2011-04-02 Multi-Stage Fracture 2458.80 2458.90 0
2011-04-02 Multi-Stage Fracture 2390.90 2391.00 0
2011-04-02 Multi-Stage Fracture 2310.90 2311.00 0
2011-04-02 Multi-Stage Fracture 2242.50 2242.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5775 0.0 0.0 0.0
2012 8618 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7925 0.0 0.0 0.0
2019 7597 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-03-04 Lost Circulation 24.00 66.00

For data sources see[7]

References