X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475033402000

Well Details

Well ID: 0475033402000
Loading map...
Location: 00/02-34-047-03W5/0
Location Alias: 00/02-34-47-03 W5M
Location Alias 2: 00/02-34-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 34
County/Municipality: Leduc County
Well Name: TALISMAN PEM 2-34-47-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0029103
License Date: 1965-10-05
License Status: RecCertified
Spud Date: 1965-10-24
Final Drill Date: 1965-10-29
Well Total Depth: 1010.40 m
Surface Hole Latitude: 53.092211
Surface Hole Longitude: -114.352151

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-05 Obtained License
1965-10-29 Finished Drilling
1965-10-29 Well Mode changed to Drilled and Cased
1965-10-30 Production Casing Operation Performed
1965-11-06 Perforation Treatment Performed - Jet Perforation
1965-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-10 Perforation Treatment Performed - Fractured
1965-11-29 Well Began Production
1965-11-29 Well Fluid changed to Crude Oil
1965-11-29 Well Mode changed to Pumping
1987-09-01 Well Fluid changed to Crude Oil
1987-09-01 Well Mode changed to Suspended
1996-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-15 Perforation Treatment Performed - Jet Perforation
1996-10-15 Plug Back Performed
1996-10-15 Well Log Performed
1996-10-16 Perforation Treatment Performed - Remedial Casing
1996-10-18 Well Abandoned
1996-10-18 Well Fluid changed to Crude Oil
1996-10-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-06 Perforation 995.20 995.50 3
1965-11-06 Perforation 996.10 996.70 3
1965-11-06 Perforation 997.30 997.90 3
1965-11-06 Perforation 998.20 998.20 3
1965-11-10 Acid Treatment 995.20 998.20 0
1965-11-10 Fracture 995.20 998.20 0
1996-10-15 Packing Device Capped w/Cement 974.00 982.00 0
1996-10-15 Perforation 250.00 250.50 7
1996-10-16 Remedial Casing Cementing 250.00 250.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5176 0.0 0.0 0.0
1968 3683 0.0 0.0 0.0
1969 1928 0.0 0.0 0.0
1970 3468 0.0 0.0 0.0
1971 7676 0.0 0.0 0.0
1972 8000 0.0 0.0 0.0
1973 8116 0.0 0.0 0.0
1974 6854 0.0 0.0 0.0
1975 2364 0.0 0.0 0.0
1978 1386 0.0 0.0 0.0
1979 7098 0.0 0.0 0.0
1980 6708 0.0 0.0 0.0
1981 7536 0.0 0.0 0.0
1982 8615 0.0 0.0 0.0
1983 7956 0.0 0.0 0.0
1984 8471 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8430 0.0 0.0 0.0
1987 4632 0.0 0.0 0.0

For data sources see[5]

References