X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475033314020

Well Details

Well ID: 0475033314020
Loading map...
Location: 02/14-33-047-03W5/0
Location Alias: 02/14-33-47-03 W5M
Location Alias 2: 02/14-33-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 33
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 14-33-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0067304
License Date: 1977-12-07
License Status: RecCertified
Spud Date: 1978-07-14
Final Drill Date: 1978-07-23
Well Total Depth: 957.00 m
Surface Hole Latitude: 53.103103
Surface Hole Longitude: -114.382119

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-07 Obtained License
1978-07-23 Finished Drilling
1978-07-23 Well Mode changed to Drilled and Cased
1978-07-25 Production Casing Operation Performed
1978-09-09 Perforation Treatment Performed - Jet Perforation
1978-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-24 Perforation Treatment Performed - Fractured
1978-11-29 Well Began Production
1978-11-29 Well Fluid changed to Crude Oil
1978-11-29 Well Mode changed to Pumping
1992-11-01 Well Fluid changed to Crude Oil
1992-11-01 Well Mode changed to Suspended
2002-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-20 Perforation Treatment Performed - Jet Perforation
2002-10-20 Plug Back Performed
2002-10-20 Well Fluid changed to Crude Oil
2002-10-20 Well Log Performed
2002-10-20 Well Mode changed to Abandoned Zone
2002-10-21 Perforation Treatment Performed - Remedial Casing
2002-10-30 Well Abandoned
2002-10-30 Well Fluid changed to Crude Oil
2002-10-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-09 Perforation 938.00 940.50 7
1978-09-11 Acid Treatment 938.00 940.50 0
1978-11-24 Fracture 938.00 940.50 0
2002-10-20 Packing Device Capped w/Cement 925.00 933.00 0
2002-10-20 Perforation 237.00 237.50 13
2002-10-21 Remedial Casing Cementing 237.00 237.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 696 0.0 0.0 0.0
1979 2496 0.0 0.0 0.0
1980 3144 0.0 0.0 0.0
1981 1512 0.0 0.0 0.0
1982 2088 0.0 0.0 0.0
1983 700 0.0 0.0 0.0
1984 4842 0.0 0.0 0.0
1985 2686 0.0 0.0 0.0
1986 2732 0.0 0.0 0.0
1987 2284 0.0 0.0 0.0
1988 4776 0.0 0.0 0.0
1989 3504 0.0 0.0 0.0
1990 3912 0.0 0.0 0.0
1991 3784 0.0 0.0 0.0
1992 1224 0.0 0.0 0.0

For data sources see[5]

References