X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475032214000

Well Details

Well ID: 0475032214000
Loading map...
Location: 00/14-22-047-03W5/0
Location Alias: 00/14-22-47-03 W5M
Location Alias 2: 00/14-22-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 22
County/Municipality: Brazeau County
Well Name: DAYLIGHT ET AL HZ PEMBINA 14-22-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0437507
License Date: 2011-10-06
License Status: Issued
Spud Date: 2011-11-06
Final Drill Date: 2011-11-18
Well Total Depth: 2617.00 m
Surface Hole Latitude: 53.070969
Surface Hole Longitude: -114.380599

For data sources see[1][2]

Well History

Date Event
2011-10-06 Obtained License
2011-11-05 Surface Casing Operation Performed
2011-11-06 Well Log Performed
2011-11-10 Direction Drilling Operation Performed - Horizontal
2011-11-12 Intermediate Casing Operation Performed
2011-11-18 Finished Drilling
2011-11-18 Well Log Performed
2011-11-18 Well Mode changed to Drilled and Cased
2011-11-21 Liner Casing Operation Performed
2011-11-22 Rig Released
2011-11-24 Well Log Performed
2011-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-28 Perforation Treatment Performed - Open-Hole Completion
2011-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-06 Well Began Production
2011-12-06 Well Fluid changed to Crude Oil
2011-12-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-10 780.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-28 Open Hole/Barefoot Completion 2612.20 2617.00 0
2011-11-28 Multi-Stage Fracture 1975.50 1975.60 0
2011-11-28 Multi-Stage Fracture 1892.80 1892.90 0
2011-11-28 Multi-Stage Fracture 1810.00 1810.10 0
2011-11-28 Multi-Stage Fracture 1744.10 1744.20 0
2011-11-28 Multi-Stage Fracture 1657.30 1657.40 0
2011-11-28 Multi-Stage Fracture 1574.60 1574.70 0
2011-11-28 Multi-Stage Fracture 1504.70 1504.80 0
2011-11-28 Multi-Stage Fracture 1434.80 1434.90 0
2011-11-28 Multi-Stage Fracture 1352.70 1352.80 0
2011-11-29 Multi-Stage Fracture 1282.70 1282.80 0
2011-11-28 Multi-Stage Fracture 2589.90 2590.00 0
2011-11-29 Multi-Stage Fracture 1199.80 1199.90 0
2011-11-28 Multi-Stage Fracture 2500.90 2501.00 0
2011-11-28 Multi-Stage Fracture 2431.40 2431.50 0
2011-11-28 Multi-Stage Fracture 2346.60 2346.70 0
2011-11-28 Multi-Stage Fracture 2266.30 2266.40 0
2011-11-28 Multi-Stage Fracture 2197.00 2197.10 0
2011-11-28 Multi-Stage Fracture 2115.00 2115.10 0
2011-11-28 Multi-Stage Fracture 2045.40 2045.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 660 0.0 0.0 0.0
2012 8412 0.0 0.0 0.0
2013 8679 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7122 0.0 0.0 0.0
2016 6849 0.0 0.0 0.0
2017 8703 0.0 0.0 0.0
2018 6119 0.0 0.0 0.0
2019 8569 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References