X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475032205W00

Well Details

Well ID: 0475032205W00
Loading map...
Location: W0/05-22-047-03W5/0
Location Alias: W0/05-22-47-03 W5M
Location Alias 2: W0/05-22-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 22
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 5-22-47-3
Operator Name: Ridgeback Resources Inc.
License Number: 0421231
License Date: 2010-06-17
License Status: Amended
Spud Date: 2010-09-01
Final Drill Date: 2010-09-08
Well Total Depth: 2455.00 m
Surface Hole Latitude: 53.069047
Surface Hole Longitude: -114.385914

For data sources see[1][2]

Well History

Date Event
2010-06-17 Obtained License
2010-09-01 Lost Circulation Occurred
2010-09-02 Surface Casing Operation Performed
2010-09-04 Direction Drilling Operation Performed - Horizontal
2010-09-05 Production Casing Operation Performed
2010-09-08 Finished Drilling
2010-09-08 Perforation Treatment Performed - Open-Hole Completion
2010-09-08 Well Mode changed to Drilled and Cased
2010-09-09 Liner Casing Operation Performed
2010-09-09 Rig Released
2010-10-14 Well Log Performed
2010-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-22 Well Began Production
2010-10-22 Well Fluid changed to Crude Oil
2010-10-22 Well Mode changed to Pumping
2010-10-23 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-04 1055.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-08 Open Hole/Barefoot Completion 1507.00 2450.00 0
2010-10-19 Multi-Stage Fracture 2010.80 2010.90 0
2010-10-19 Multi-Stage Fracture 1960.80 1960.90 0
2010-10-19 Multi-Stage Fracture 1911.70 1911.80 0
2010-10-19 Multi-Stage Fracture 1864.00 1864.10 0
2010-10-19 Multi-Stage Fracture 1805.30 1805.40 0
2010-10-19 Multi-Stage Fracture 1756.90 1757.00 0
2010-10-19 Multi-Stage Fracture 1708.20 1708.30 0
2010-10-19 Multi-Stage Fracture 1660.20 1660.30 0
2010-10-19 Multi-Stage Fracture 1612.10 1612.20 0
2010-10-19 Multi-Stage Fracture 1563.80 1563.90 0
2010-10-19 Multi-Stage Fracture 2413.40 2413.50 0
2010-10-19 Multi-Stage Fracture 2361.00 2361.10 0
2010-10-19 Multi-Stage Fracture 2309.70 2309.80 0
2010-10-19 Multi-Stage Fracture 2259.00 2259.10 0
2010-10-19 Multi-Stage Fracture 2207.60 2207.70 0
2010-10-19 Multi-Stage Fracture 2156.60 2156.70 0
2010-10-19 Multi-Stage Fracture 2105.80 2105.90 0
2010-10-19 Multi-Stage Fracture 2058.30 2058.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 676 0.0 0.0 0.0
2011 8284 0.0 0.0 0.0
2012 8615 0.0 0.0 0.0
2013 8103 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 8142 0.0 0.0 0.0
2016 744 0.0 0.0 0.0
2018 6344 0.0 0.0 0.0
2019 7949 0.0 0.0 0.0
2020 1945 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-09-01 Lost Circulation 30.00 94.00

For data sources see[7]

References