X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475023506000

Well Details

Well ID: 0475023506000
Loading map...
Location: 00/06-35-047-02W5/0
Location Alias: 00/06-35-47-02 W5M
Location Alias 2: 00/06-35-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 35
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 6-35-47-2
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0021701
License Date: 1961-11-16
License Status: Suspension
Spud Date: 1962-01-10
Final Drill Date: 1962-01-18
Well Total Depth: 1318.30 m
Surface Hole Latitude: 53.095773
Surface Hole Longitude: -114.187682

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-16 Obtained License
1962-01-18 Finished Drilling
1962-01-18 Well Mode changed to Drilled and Cased
1962-01-19 Drill Stem Test Performed
1962-01-20 Production Casing Operation Performed
1962-01-23 Perforation Treatment Performed - Acid Wash - No Pressure
1962-01-23 Perforation Treatment Performed - Fractured
1962-01-23 Perforation Treatment Performed - Jet Perforation
1962-02-01 Well Began Production
1962-02-01 Well Fluid changed to Crude Oil
1962-02-01 Well Mode changed to Flowing
1967-11-27 Well Fluid changed to Crude Oil
1967-11-27 Well Mode changed to Pumping
1971-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-04-01 Well Fluid changed to Crude Oil
2015-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-23 Perforation 1307.00 1308.50 13
1962-01-23 Acid Wash 1307.00 1308.50 0
1962-01-23 Fracture 1307.00 1308.50 0
1971-10-19 Acid Treatment 1307.00 1308.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4740 0.0 0.0 0.0
1968 6542 0.0 0.0 0.0
1969 7378 0.0 0.0 0.0
1970 7410 0.0 0.0 0.0
1971 8333 0.0 0.0 0.0
1972 8495 0.0 0.0 0.0
1973 8299 0.0 0.0 0.0
1974 8339 0.0 0.0 0.0
1975 8495 0.0 0.0 0.0
1976 8279 0.0 0.0 0.0
1977 8556 0.0 0.0 0.0
1978 8423 0.0 0.0 0.0
1979 8711 0.0 0.0 0.0
1980 8543 0.0 0.0 0.0
1981 8231 0.0 0.0 0.0
1982 8159 0.0 0.0 0.0
1983 8231 0.0 0.0 0.0
1984 8039 0.0 0.0 0.0
1985 8495 0.0 0.0 0.0
1986 8099 0.0 0.0 0.0
1987 7861 0.0 0.0 0.0
1988 8616 0.0 0.0 0.0
1989 8303 0.0 0.0 0.0
1990 8591 0.0 0.0 0.0
1991 8039 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8033 0.0 0.0 0.0
1995 8639 0.0 0.0 0.0
1996 8759 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 8685 0.0 0.0 0.0
2000 7540 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 8736 0.0 0.0 0.0
2003 7676 0.0 0.0 0.0
2004 8211 0.0 0.0 0.0
2005 7632 0.0 0.0 0.0
2006 8399 0.0 0.0 0.0
2007 504 0.0 0.0 0.0
2008 5736 0.0 0.0 0.0
2009 8591 0.0 0.0 0.0
2010 8619 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8729 0.0 0.0 0.0
2013 8507 0.0 0.0 0.0
2014 1968 0.0 0.0 0.0

For data sources see[5]

References