X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475022416000

Well Details

Well ID: 0475022416000
Loading map...
Location: 00/16-24-047-02W5/0
Location Alias: 00/16-24-47-02 W5M
Location Alias 2: 00/16-24-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 24
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 16-24-47-2
Operator Name: Journey Energy Inc.
License Number: 0022467
License Date: 1962-05-28
License Status: Abandoned
Spud Date: 1962-06-03
Final Drill Date: 1962-06-17
Well Total Depth: 1252.70 m
Surface Hole Latitude: 53.074469
Surface Hole Longitude: -114.152938

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-05-28 Obtained License
1962-06-03 Direction Drilling Operation Performed - 98
1962-06-10 Drill Stem Test Performed
1962-06-17 Finished Drilling
1962-06-17 Well Mode changed to Drilled and Cased
1962-06-19 Drill Stem Test Performed
1962-06-20 Production Casing Operation Performed
1962-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-05 Perforation Treatment Performed - Jet Perforation
1962-07-09 Well Began Production
1962-07-09 Well Fluid changed to Crude Oil
1962-07-09 Well Mode changed to Flowing
1964-06-30 Well Fluid changed to Crude Oil
1964-06-30 Well Mode changed to Pumping
1967-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-09 Perforation Treatment Performed - Fractured
1985-02-06 Well Log Performed
1985-02-07 Well Log Performed
1993-07-01 Well Fluid changed to Crude Oil
1993-07-01 Well Mode changed to Suspended
1998-03-02 Well Fluid changed to Crude Oil
1998-03-02 Well Mode changed to Pumping
1999-09-13 Well Fluid changed to Crude Oil
1999-09-13 Well Mode changed to Suspended
1999-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-16 Perforation Treatment Performed - Jet Perforation
1999-09-16 Plug Back Performed
1999-09-16 Well Fluid changed to Crude Oil
1999-09-16 Well Log Performed
1999-09-16 Well Mode changed to Abandoned Zone
1999-09-17 Perforation Treatment Performed - Cement Squeeze
1999-09-20 Perforation Treatment Performed - Jet Perforation
1999-09-20 Perforation Treatment Performed - Remedial Casing
1999-09-20 Well Log Performed
1999-09-23 Perforation Treatment Performed - Jet Perforation
1999-09-23 Well Log Performed
2014-12-12 Well Log Performed
2019-01-31 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-02 Perforation Treatment Performed - Remedial Casing
2019-02-02 Plug Back Performed
2019-02-26 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1962-06-03 975.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-07-05 Perforation 1235.00 1236.30 13
1999-09-20 Remedial Casing Cementing 654.30 692.00 0
1999-09-23 Perforation 680.90 683.30 14
2019-01-31 Perforation 638.50 638.60 2
2019-01-31 Perforation 612.60 612.70 2
2019-01-31 Perforation 600.00 600.10 2
2019-01-31 Perforation 460.80 460.90 2
2019-01-31 Perforation 322.00 322.10 2
2019-01-31 Perforation 271.30 271.40 2
2019-01-31 Perforation 252.40 252.50 2
2019-01-31 Perforation 230.40 230.50 2
1962-07-05 Acid Treatment 1235.00 1236.30 0
2019-01-31 Perforation 187.50 187.60 2
2019-01-31 Perforation 167.60 167.70 2
2019-01-31 Perforation 147.00 147.10 2
2019-02-02 Remedial Casing Cementing 638.50 638.60 0
2019-02-02 Remedial Casing Cementing 612.60 612.70 0
2019-02-02 Remedial Casing Cementing 600.00 600.10 0
2019-02-02 Remedial Casing Cementing 460.80 460.90 0
2019-02-02 Remedial Casing Cementing 322.00 322.10 0
2019-02-02 Remedial Casing Cementing 271.30 271.40 0
2019-02-02 Remedial Casing Cementing 252.40 252.50 0
1967-10-23 Acid Treatment 1235.00 1236.30 0
2019-02-02 Remedial Casing Cementing 230.40 230.50 0
2019-02-02 Remedial Casing Cementing 187.50 187.60 0
2019-02-02 Remedial Casing Cementing 167.60 167.70 0
2019-02-02 Remedial Casing Cementing 147.00 147.10 0
2019-02-02 Packing Device Capped w/Cement 77.00 675.00 0
1969-12-09 Fracture 1235.00 1236.30 0
1999-09-16 Packing Device Capped w/Cement 1222.00 1230.00 0
1999-09-16 Perforation 705.00 705.70 4
1999-09-17 Cement Squeeze 705.00 705.70 0
1999-09-20 Perforation 691.30 692.00 4
1999-09-20 Perforation 654.30 655.00 4

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 7871 0.0 0.0 0.0
1970 8457 0.0 0.0 0.0
1971 8364 0.0 0.0 0.0
1972 8397 0.0 0.0 0.0
1973 8160 0.0 0.0 0.0
1974 8235 0.0 0.0 0.0
1975 8313 0.0 0.0 0.0
1976 7963 0.0 0.0 0.0
1977 8351 0.0 0.0 0.0
1978 8208 0.0 0.0 0.0
1979 8147 0.0 0.0 0.0
1980 8459 0.0 0.0 0.0
1981 8423 0.0 0.0 0.0
1982 8172 0.0 0.0 0.0
1983 7871 0.0 0.0 0.0
1984 8183 0.0 0.0 0.0
1985 8055 0.0 0.0 0.0
1986 7499 0.0 0.0 0.0
1987 8452 0.0 0.0 0.0
1988 7871 0.0 0.0 0.0
1989 2879 0.0 0.0 0.0
1990 1512 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 7031 0.0 0.0 0.0
1993 168 0.0 0.0 0.0
1998 2141 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-12 No Incident Encountered 0.00 0.00
2019-02-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References