If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475022012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.069485,"lon":-114.246708,"icon":""}]} |
Location: 00/12-20-047-02W5/0 | |
Location Alias: 00/12-20-47-02 W5M | |
Location Alias 2: 00/12-20-047-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 02 | |
Section: 20 | |
County/Municipality: Leduc County | |
Well Name: WHITECAP PEMBINA 12-20-47-2 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0420305 | |
License Date: 2010-05-07 | |
License Status: Issued | |
Spud Date: 2010-05-17 | |
Final Drill Date: 2010-05-23 | |
Well Total Depth: 2739.00 m | |
Surface Hole Latitude: 53.069485 | |
Surface Hole Longitude: -114.246708 |
Date | Event |
---|---|
2010-05-07 | Obtained License |
2010-05-18 | Surface Casing Operation Performed |
2010-05-19 | Direction Drilling Operation Performed - Horizontal |
2010-05-20 | Intermediate Casing Operation Performed |
2010-05-20 | Well Log Performed |
2010-05-23 | Finished Drilling |
2010-05-23 | Well Log Performed |
2010-05-23 | Well Mode changed to Drilled and Cased |
2010-05-24 | Liner Casing Operation Performed |
2010-05-24 | Perforation Treatment Performed - Open-Hole Completion |
2010-05-24 | Rig Released |
2010-06-17 | Well Log Performed |
2010-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-07-23 | Well Began Production |
2010-07-23 | Well Fluid changed to Crude Oil |
2010-07-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-05-19 | 1125.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-05-24 | Open Hole/Barefoot Completion | 1444.00 | 2739.00 | 0 |
2010-06-28 | Multi-Stage Fracture | 1747.20 | 1747.30 | 0 |
2010-06-28 | Multi-Stage Fracture | 1637.80 | 1637.90 | 0 |
2010-06-28 | Multi-Stage Fracture | 1515.60 | 1515.70 | 0 |
2010-06-27 | Multi-Stage Fracture | 2676.50 | 2676.60 | 0 |
2010-06-27 | Multi-Stage Fracture | 2555.70 | 2555.80 | 0 |
2010-06-27 | Multi-Stage Fracture | 2445.90 | 2446.00 | 0 |
2010-06-27 | Multi-Stage Fracture | 2337.70 | 2337.80 | 0 |
2010-06-28 | Multi-Stage Fracture | 2208.90 | 2209.00 | 0 |
2010-06-28 | Multi-Stage Fracture | 2098.50 | 2098.60 | 0 |
2010-06-28 | Multi-Stage Fracture | 1978.90 | 1979.00 | 0 |
2010-06-28 | Multi-Stage Fracture | 1868.70 | 1868.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3750 | 0.0 | 0.0 | 0.0 |
2011 | 8155 | 0.0 | 0.0 | 0.0 |
2012 | 8762 | 0.0 | 0.0 | 0.0 |
2013 | 8642 | 0.0 | 0.0 | 0.0 |
2014 | 8735 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8676 | 0.0 | 0.0 | 0.0 |
2018 | 8687 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]