0474272011020

Well Details

Well ID: 0474272011020
Loading map...
Location: 02/11-20-047-27W4/0
Location Alias: 02/11-20-47-27 W4M
Location Alias 2: 02/11-20-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 20
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN 11-20-47-27
Operator Name: Imperial Oil Resources Limited
License Number: 0128939
License Date: 1987-10-02
License Status: Abandoned
Spud Date: 1987-10-07
Final Drill Date: 1987-10-24
Well Total Depth: 2186.00 m
Surface Hole Latitude: 53.070505
Surface Hole Longitude: -113.917901

For data sources see[1][2]

Well History

Date Event
1987-10-02 Obtained License
1987-10-08 Surface Casing Operation Performed
1987-10-16 Well Log Performed
1987-10-17 Intermediate Casing Operation Performed
1987-10-22 Lost Circulation Occurred
1987-10-24 Finished Drilling
1987-10-24 Perforation Treatment Performed - Open-Hole Completion
1987-10-24 Well Log Performed
1987-10-24 Well Mode changed to Drilled and Cased
1987-10-25 Rig Released
1987-11-20 Well Log Performed
1987-11-24 Lost Circulation Occurred
1987-11-28 Perforation Treatment Performed - Cement Squeeze
1987-12-01 Perforation Treatment Performed - Cement Plug
1987-12-03 Liner Casing Operation Performed
1987-12-18 Well Log Performed
1987-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-20 Perforation Treatment Performed - Jet Perforation
1987-12-20 Well Log Performed
1988-01-28 Well Began Production
1988-01-28 Well Fluid changed to Crude Oil
1988-01-28 Well Mode changed to Pumping
1988-09-06 Well Log Performed
1991-11-23 Perforation Treatment Performed - Jet Perforation
1991-11-23 Well Log Performed
1991-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-11 Perforation Treatment Performed - Jet Perforation
1992-11-11 Well Log Performed
1992-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-13 Perforation Treatment Performed - Jet Perforation
1993-11-01 Well Log Performed
1996-05-17 Perforation Treatment Performed - Jet Perforation
1996-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-07 Well Log Performed
1996-11-05 Well Log Performed
1996-12-02 Well Log Performed
1996-12-16 Well Log Performed
1996-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-18 Perforation Treatment Performed - Jet Perforation
1997-02-06 Well Log Performed
1997-04-07 Well Log Performed
1998-03-18 Perforation Treatment Performed - Jet Perforation
1998-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-05 Perforation Treatment Performed - Jet Perforation
1998-07-05 Well Log Performed
1998-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-08 Perforation Treatment Performed - Jet Perforation
1998-11-25 Well Log Performed
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Suspended
1999-07-28 Well Log Performed
1999-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-07-29 Perforation Treatment Performed - Jet Perforation
1999-07-29 Well Log Performed
1999-08-03 Well Fluid changed to Crude Oil
1999-08-03 Well Mode changed to Pumping
1999-10-13 Well Log Performed
2000-01-06 Perforation Treatment Performed - Jet Perforation
2000-01-06 Well Log Performed
2000-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-05 Well Log Performed
2000-06-07 Perforation Treatment Performed - Jet Perforation
2000-06-07 Well Log Performed
2000-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-20 Well Fluid changed to Gas
2000-06-20 Well Mode changed to Flowing
2000-06-22 Perforation Treatment Performed - Jet Perforation
2000-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-25 Perforation Treatment Performed - Jet Perforation
2001-01-25 Well Log Performed
2001-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-11 Perforation Treatment Performed - Jet Perforation
2001-07-11 Well Log Performed
2001-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-27 Perforation Treatment Performed - Jet Perforation
2002-07-27 Well Log Performed
2002-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-09-20 Well Log Performed
2002-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-20 Well Log Performed
2002-11-25 Well Log Performed
2003-02-20 Perforation Treatment Performed - Jet Perforation
2003-02-22 Perforation Treatment Performed - Cement Plug
2003-03-28 Well Log Performed
2004-11-20 Well Log Performed
2010-06-01 Well Fluid changed to Gas
2010-06-01 Well Mode changed to Suspended
2014-04-10 Perforation Treatment Performed - Remedial Casing
2014-04-11 Perforation Treatment Performed - Cement Plug
2014-04-11 Plug Back Performed
2014-04-11 Well Fluid changed to Gas
2014-04-11 Well Mode changed to Abandoned Zone
2014-04-12 Perforation Treatment Performed - Cement Plug
2014-04-13 Perforation Treatment Performed - Jet Perforation
2014-04-13 Well Log Performed
2014-04-14 Perforation Treatment Performed - Cement Plug
2014-04-14 Perforation Treatment Performed - Remedial Casing
2014-04-15 Perforation Treatment Performed - Cement Plug
2014-04-15 Perforation Treatment Performed - Jet Perforation
2014-04-15 Perforation Treatment Performed - Remedial Casing
2014-04-16 Perforation Treatment Performed - Jet Perforation
2014-04-16 Well Log Performed
2014-04-23 Perforation Treatment Performed - Cement Plug
2014-04-23 Perforation Treatment Performed - Remedial Casing
2014-12-08 Well Abandoned
2014-12-08 Well Fluid changed to Gas
2014-12-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-24 Open Hole/Barefoot Completion 1942.00 2186.00 0
1992-11-13 Perforation 2125.30 2125.80 13
1996-05-17 Perforation 2120.70 2121.50 13
1996-05-18 Acid Treatment 2120.70 2121.50 0
1996-12-18 Perforation 2117.70 2118.30 20
1996-12-18 Acid Treatment 2117.70 2118.30 0
1998-03-18 Perforation 2109.00 2109.50 20
1998-03-19 Acid Treatment 2109.00 2109.50 0
1998-07-05 Perforation 2104.80 2105.30 20
1998-07-06 Acid Treatment 2104.80 2105.30 0
1998-07-08 Perforation 2099.50 2100.50 20
1987-11-28 Cement Squeeze 1942.00 2186.00 0
1998-07-08 Acid Treatment 2099.50 2100.50 0
1999-07-29 Perforation 2089.00 2090.00 20
1999-07-29 Acid Treatment 2089.00 2090.00 0
2000-01-06 Perforation 2085.00 2086.00 17
2000-01-07 Acid Treatment 2085.00 2086.00 0
2000-06-07 Perforation 2060.00 2065.00 13
2000-06-14 Acid Treatment 2060.00 2065.00 0
2000-06-22 Perforation 2049.00 2053.00 13
2000-06-25 Acid Treatment 2049.00 2053.00 0
2001-01-25 Perforation 2045.00 2047.50 17
1987-12-01 Cement Plug 2176.00 2186.00 0
2001-01-26 Acid Treatment 2045.00 2053.00 0
2001-07-11 Perforation 2018.50 2023.50 17
2001-07-12 Acid Treatment 2018.50 2023.50 0
2002-07-27 Perforation 1959.00 1967.80 17
2002-07-28 Acid Treatment 1959.90 1967.80 0
2002-09-20 Perforation 1951.50 1957.00 17
2002-09-22 Acid Treatment 1951.50 1967.80 0
2003-02-20 Perforation 1974.00 1975.00 20
2003-02-22 Cement Plug 1975.00 1978.00 0
2014-04-10 Remedial Casing Cementing 1951.50 1975.00 0
1987-12-20 Perforation 2136.70 2137.70 14
2014-04-11 Cement Plug 1946.60 1975.00 0
2014-04-12 Cement Plug 1668.00 1942.50 0
2014-04-13 Perforation 620.00 621.00 17
2014-04-14 Remedial Casing Cementing 620.00 621.00 0
2014-04-14 Cement Plug 614.60 1668.00 0
2014-04-14 Cement Plug 604.00 614.00 0
2014-04-15 Perforation 573.00 574.00 17
2014-04-15 Perforation 545.00 546.00 17
2014-04-15 Remedial Casing Cementing 545.00 574.00 0
2014-04-15 Cement Plug 538.00 604.00 0
1987-12-20 Acid Treatment 2136.70 2137.70 0
2014-04-16 Perforation 523.00 524.00 17
2014-04-16 Perforation 510.00 511.00 17
2014-04-16 Perforation 501.00 502.00 17
2014-04-16 Perforation 464.00 465.00 17
2014-04-16 Perforation 430.00 431.00 17
2014-04-16 Perforation 383.00 384.00 17
2014-04-16 Perforation 360.00 361.00 17
2014-04-16 Perforation 317.00 318.00 17
2014-04-16 Perforation 298.00 299.00 17
2014-04-16 Perforation 272.00 273.00 17
1991-11-23 Perforation 2133.00 2134.00 20
2014-04-16 Perforation 247.00 248.00 17
2014-04-16 Perforation 230.30 231.30 17
2014-04-23 Remedial Casing Cementing 230.30 524.00 0
2014-04-23 Cement Plug 223.40 538.00 0
2014-04-23 Cement Plug 222.00 222.80 0
1991-11-24 Acid Treatment 2133.00 2134.00 0
1992-11-11 Perforation 2128.00 2129.60 20
1992-11-13 Acid Treatment 2128.00 2129.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 8070 0.0 0.0 0.0
1989 8512 0.0 0.0 0.0
1990 8517 0.0 0.0 0.0
1991 7950 0.0 0.0 0.0
1992 7080 0.0 0.0 0.0
1993 8366 0.0 0.0 0.0
1994 8046 0.0 0.0 0.0
1995 8240 0.0 0.0 0.0
1996 8374 0.0 0.0 0.0
1997 8102 0.0 0.0 0.0
1998 6754 0.0 0.0 0.0
1999 2575 0.0 0.0 0.0
2000 6135 0.0 0.0 0.0
2001 7349 0.0 0.0 0.0
2002 7962 0.0 0.0 0.0
2003 8489 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8351 0.0 0.0 0.0
2007 5496 0.0 0.0 0.0
2008 4463 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-10-22 Lost Circulation 1986.00 2186.00
1987-11-24 Lost Circulation 1988.00 2186.00
2014-04-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References