X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474271902000

Well Details

Well ID: 0474271902000
Loading map...
Location: 00/02-19-047-27W4/0
Location Alias: 00/02-19-47-27 W4M
Location Alias 2: 00/02-19-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 19
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN C.P.R. NO. B-3
Operator Name: Imperial Oil Resources Limited
License Number: 0007515
License Date: 1953-12-23
License Status: Abandoned
Spud Date: 1953-12-29
Final Drill Date: 1954-02-07
Well Total Depth: 2174.40 m
Surface Hole Latitude: 53.062566
Surface Hole Longitude: -113.935100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-23 Obtained License
1954-02-02 Liner Casing Operation Performed
1954-02-04 Drill Stem Test Performed
1954-02-06 Drill Stem Test Performed
1954-02-07 Drill Stem Test Performed
1954-02-07 Finished Drilling
1954-02-07 Well Mode changed to Drilled and Cased
1954-02-10 Perforation Treatment Performed - Bullet Perforation
1954-02-10 Perforation Treatment Performed - Jet Perforation
1954-02-14 Well Began Production
1954-02-14 Well Fluid changed to Crude Oil
1954-02-14 Well Mode changed to Flowing
1984-07-18 Well Log Performed
1984-07-24 Well Log Performed
1984-07-30 Perforation Treatment Performed - Cement Squeeze
1984-08-03 Perforation Treatment Performed - Cement Plug
1984-08-13 Perforation Treatment Performed - Cement Plug
1984-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-21 Perforation Treatment Performed - Jet Perforation
1984-08-21 Well Log Performed
1984-12-17 Perforation Treatment Performed - Jet Perforation
1984-12-17 Well Log Performed
1985-01-09 Perforation Treatment Performed - Cement Squeeze
1985-01-18 Well Fluid changed to Crude Oil
1985-01-18 Well Mode changed to Pumping
1985-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-23 Perforation Treatment Performed - Jet Perforation
1985-01-23 Well Log Performed
1985-09-26 Perforation Treatment Performed - Chemical Squeeze
1986-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-24 Well Log Performed
1990-10-17 Well Log Performed
1990-10-18 Perforation Treatment Performed - Jet Perforation
1992-07-09 Perforation Treatment Performed - Jet Perforation
1992-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-15 Perforation Treatment Performed - Jet Perforation
1997-03-15 Well Log Performed
1997-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-05 Perforation Treatment Performed - Jet Perforation
1999-01-01 Well Fluid changed to Crude Oil
1999-01-01 Well Mode changed to Suspended
2000-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-25 Plug Back Performed
2000-05-25 Well Fluid changed to Crude Oil
2000-05-25 Well Log Performed
2000-05-25 Well Mode changed to Abandoned Zone
2000-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-31 Perforation Treatment Performed - Cement Squeeze
2000-05-31 Perforation Treatment Performed - Jet Perforation
2001-06-19 Well Abandoned
2001-06-19 Well Fluid changed to Crude Oil
2001-06-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-10 Bullet Perforation 2152.60 2156.30 13
1985-01-23 Perforation 2153.00 2153.50 7
1985-01-23 Acid Treatment 2153.00 2153.50 0
1985-09-26 Chemical Squeeze 2153.00 2153.50 0
1986-06-24 Acid Treatment 2153.00 2153.50 0
1990-10-18 Perforation 2147.70 2149.70 20
1992-07-09 Perforation 2142.00 2143.00 20
1992-07-10 Acid Treatment 2142.00 2143.00 0
1997-03-15 Perforation 2127.00 2128.30 17
1997-03-17 Acid Treatment 2127.00 2128.30 0
1998-02-05 Perforation 2121.50 2122.90 16
1954-02-10 Perforation 2152.60 2156.30 13
1998-02-05 Acid Treatment 2121.50 2122.90 0
2000-05-25 Packing Device Capped w/Cement 2099.50 2108.50 0
2000-05-31 Perforation 766.00 766.00 13
2000-05-31 Cement Squeeze 766.00 766.00 0
2000-05-31 Packing Device Capped w/Cement 712.00 880.00 0
1984-07-30 Cement Squeeze 2152.60 2156.30 0
1984-08-03 Cement Plug 2083.20 2145.00 0
1984-08-13 Cement Plug 2129.00 2171.00 0
1984-08-21 Perforation 2149.50 2150.00 14
1984-08-21 Acid Treatment 2149.50 2150.00 0
1984-12-17 Perforation 2141.80 2142.00 14
1985-01-09 Cement Squeeze 2141.80 2150.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1350 0.0 0.0 0.0
1974 5246 0.0 0.0 0.0
1975 2455 0.0 0.0 0.0
1976 1148 0.0 0.0 0.0
1977 1440 0.0 0.0 0.0
1978 1800 0.0 0.0 0.0
1979 4900 0.0 0.0 0.0
1980 5727 0.0 0.0 0.0
1981 7563 0.0 0.0 0.0
1982 5245 0.0 0.0 0.0
1983 6941 0.0 0.0 0.0
1984 3598 0.0 0.0 0.0
1985 5363 0.0 0.0 0.0
1986 2307 0.0 0.0 0.0
1987 8074 0.0 0.0 0.0
1988 8311 0.0 0.0 0.0
1989 8333 0.0 0.0 0.0
1990 7699 0.0 0.0 0.0
1991 8198 0.0 0.0 0.0
1992 7900 0.0 0.0 0.0
1993 7641 0.0 0.0 0.0
1994 7428 0.0 0.0 0.0
1995 4766 0.0 0.0 0.0
1996 8620 0.0 0.0 0.0
1997 8003 0.0 0.0 0.0
1998 5894 0.0 0.0 0.0

For data sources see[5]

References