X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474271901000

Well Details

Well ID: 0474271901000
Loading map...
Location: 00/01-19-047-27W4/0
Location Alias: 00/01-19-47-27 W4M
Location Alias 2: 00/01-19-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 19
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN C.P.R. B-1
Operator Name: Imperial Oil Resources Limited
License Number: 0004854
License Date: 1952-06-16
License Status: Abandoned
Spud Date: 1952-06-29
Final Drill Date: 1952-08-25
Well Total Depth: 2161.00 m
Surface Hole Latitude: 53.063248
Surface Hole Longitude: -113.930233

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-16 Obtained License
1952-07-14 Drill Stem Test Performed
1952-07-27 Drill Stem Test Performed
1952-08-01 Liner Casing Operation Performed
1952-08-25 Finished Drilling
1952-08-25 Well Mode changed to Drilled and Cased
1952-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-08-28 Perforation Treatment Performed - Bullet Perforation
1952-08-28 Perforation Treatment Performed - Jet Perforation
1952-08-28 Well Began Production
1952-08-28 Well Fluid changed to Crude Oil
1952-08-28 Well Mode changed to Flowing
1979-07-05 Perforation Treatment Performed - Jet Perforation
1979-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-22 Perforation Treatment Performed - Cement Squeeze
1983-09-27 Perforation Treatment Performed - Jet Perforation
1983-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-09 Perforation Treatment Performed - Cement Squeeze
1985-04-18 Perforation Treatment Performed - Cement Squeeze
1985-05-01 Perforation Treatment Performed - Jet Perforation
1985-05-01 Well Log Performed
1985-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-07 Perforation Treatment Performed - Cement Squeeze
1985-05-14 Perforation Treatment Performed - Jet Perforation
1985-05-14 Well Log Performed
1985-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-15 Well Log Performed
1985-05-25 Well Fluid changed to Crude Oil
1985-05-25 Well Mode changed to Pumping
1990-08-11 Well Log Performed
1990-08-14 Well Log Performed
1991-02-11 Perforation Treatment Performed - Cement Squeeze
1991-02-15 Perforation Treatment Performed - Jet Perforation
1991-02-17 Perforation Treatment Performed - Acid Wash - No Pressure
1994-04-11 Perforation Treatment Performed - Jet Perforation
1994-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-17 Well Log Performed
1999-03-30 Perforation Treatment Performed - Jet Perforation
1999-04-27 Well Log Performed
1999-09-30 Well Log Performed
1999-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-20 Well Log Performed
2000-02-01 Perforation Treatment Performed - Jet Perforation
2000-02-01 Well Log Performed
2000-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Suspended
2002-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-03 Plug Back Performed
2002-12-03 Well Fluid changed to Crude Oil
2002-12-03 Well Mode changed to Abandoned Zone
2002-12-11 Perforation Treatment Performed - Jet Perforation
2002-12-12 Perforation Treatment Performed - Jet Perforation
2010-11-14 Well Log Performed
2010-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-17 Plug Back Performed
2010-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-19 Perforation Treatment Performed - Jet Perforation
2010-11-19 Well Log Performed
2010-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-20 Perforation Treatment Performed - Jet Perforation
2010-11-20 Perforation Treatment Performed - Remedial Casing
2010-11-20 Well Log Performed
2010-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-21 Perforation Treatment Performed - Remedial Casing
2010-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-22 Perforation Treatment Performed - Jet Perforation
2010-11-22 Well Log Performed
2010-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-25 Perforation Treatment Performed - Remedial Casing
2012-05-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-28 Bullet Perforation 2123.80 2133.60 13
1985-04-18 Cement Squeeze 2152.00 2153.00 0
1985-05-01 Perforation 2152.50 2153.00 13
1985-05-03 Acid Treatment 2152.50 2153.00 0
1985-05-07 Cement Squeeze 2152.50 2153.00 0
1985-05-14 Perforation 2152.50 2153.00 13
1985-05-15 Acid Treatment 2152.50 2153.00 0
1991-02-11 Cement Squeeze 2147.90 2150.60 0
1991-02-15 Perforation 2148.20 2149.50 24
1991-02-17 Acid Wash 2148.20 2149.50 0
1994-04-11 Perforation 2139.00 2139.70 13
1952-08-28 Perforation 2123.80 2133.60 13
1994-04-12 Acid Treatment 2139.00 2139.70 0
1994-04-12 Acid Treatment 2139.00 2139.70 0
1999-03-30 Perforation 2100.50 2101.50 17
1999-10-01 Acid Treatment 2100.50 2101.50 0
2000-02-01 Perforation 2090.30 2091.30 17
2000-02-04 Acid Treatment 2090.30 2091.30 0
2002-12-03 Packing Device Capped w/Cement 1946.00 2083.00 0
2002-12-11 Perforation 1604.20 1605.00 8
2002-12-12 Perforation 1598.30 1598.80 8
2010-11-17 Packing Device Capped w/Cement 1514.80 1589.90 0
1952-08-28 Acid Treatment 2123.80 2133.60 0
2010-11-18 Packing Device Capped w/Cement 845.00 1035.00 0
2010-11-19 Perforation 840.00 841.00 17
2010-11-20 Remedial Casing Cementing 840.00 841.00 0
2010-11-20 Packing Device Capped w/Cement 826.60 834.60 0
2010-11-20 Perforation 615.00 616.00 17
2010-11-21 Remedial Casing Cementing 615.00 616.00 0
2010-11-21 Packing Device Capped w/Cement 597.40 605.40 0
2010-11-22 Packing Device Capped w/Cement 193.00 366.00 0
2010-11-22 Perforation 355.00 356.00 17
2010-11-22 Perforation 317.00 318.00 17
1979-07-05 Perforation 2147.90 2150.60 7
2010-11-22 Perforation 260.00 261.00 17
2010-11-22 Perforation 211.00 212.00 17
2010-11-22 Perforation 198.00 199.00 17
2010-11-25 Remedial Casing Cementing 198.00 356.00 0
2010-11-25 Packing Device Capped w/Cement 184.50 192.50 0
1979-07-06 Acid Treatment 2147.90 2150.60 0
1983-09-22 Cement Squeeze 2123.80 2150.60 0
1983-09-27 Perforation 2152.00 2153.00 13
1983-09-28 Acid Treatment 2152.00 2153.00 0
1985-04-09 Cement Squeeze 2123.80 2133.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 887 0.0 0.0 0.0
1973 6613 0.0 0.0 0.0
1974 6351 0.0 0.0 0.0
1975 4004 0.0 0.0 0.0
1976 3095 0.0 0.0 0.0
1977 2820 0.0 0.0 0.0
1978 1940 0.0 0.0 0.0
1979 4359 0.0 0.0 0.0
1980 6521 0.0 0.0 0.0
1981 6805 0.0 0.0 0.0
1982 2909 0.0 0.0 0.0
1983 2433 0.0 0.0 0.0
1984 4714 0.0 0.0 0.0
1985 7221 0.0 0.0 0.0
1986 7830 0.0 0.0 0.0
1987 6693 0.0 0.0 0.0
1988 7759 0.0 0.0 0.0
1989 8461 0.0 0.0 0.0
1990 7740 0.0 0.0 0.0
1991 6457 0.0 0.0 0.0
1992 7805 0.0 0.0 0.0
1993 8241 0.0 0.0 0.0
1994 8194 0.0 0.0 0.0
1995 3901 0.0 0.0 0.0
1996 6820 0.0 0.0 0.0
1997 8578 0.0 0.0 0.0
1998 8118 0.0 0.0 0.0
1999 7764 0.0 0.0 0.0
2000 3016 0.0 0.0 0.0

For data sources see[5]

References