X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474271810000

Well Details

Well ID: 0474271810000
Loading map...
Location: 00/10-18-047-27W4/0
Location Alias: 00/10-18-47-27 W4M
Location Alias 2: 00/10-18-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 18
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN NO C-8
Operator Name: Imperial Oil Resources Limited
License Number: 0007220
License Date: 1953-10-23
License Status: Abandoned
Spud Date: 1953-11-11
Final Drill Date: 1953-12-19
Well Total Depth: 2164.70 m
Surface Hole Latitude: 53.056016
Surface Hole Longitude: -113.935698

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-10-23 Obtained License
1953-12-16 Liner Casing Operation Performed
1953-12-19 Finished Drilling
1953-12-19 Lost Circulation Occurred
1953-12-19 Well Mode changed to Drilled and Cased
1953-12-21 Perforation Treatment Performed - Bullet Perforation
1953-12-21 Perforation Treatment Performed - Jet Perforation
1953-12-24 Well Began Production
1953-12-24 Well Fluid changed to Crude Oil
1953-12-24 Well Mode changed to Flowing
1972-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-17 Well Fluid changed to Crude Oil
1980-06-17 Well Mode changed to Pumping
1983-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-22 Well Log Performed
1984-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-11 Well Log Performed
1988-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-12 Perforation Treatment Performed - Jet Perforation
1992-03-30 Perforation Treatment Performed - Jet Perforation
1992-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-09 Perforation Treatment Performed - Jet Perforation
1994-01-09 Well Log Performed
1994-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-08 Perforation Treatment Performed - Cement Squeeze
1994-08-11 Well Log Performed
1994-08-14 Perforation Treatment Performed - Jet Perforation
1994-08-14 Well Log Performed
1994-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-20 Perforation Treatment Performed - Jet Perforation
1997-03-20 Well Log Performed
1997-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-04 Perforation Treatment Performed - Acid Wash - No Pressure
1999-08-04 Perforation Treatment Performed - Jet Perforation
1999-08-04 Well Log Performed
2000-09-01 Well Fluid changed to Gas
2000-09-01 Well Mode changed to Flowing
2000-09-09 Perforation Treatment Performed - Jet Perforation
2000-09-09 Well Log Performed
2000-09-10 Well Log Performed
2000-09-11 Perforation Treatment Performed - Remedial Casing
2000-09-12 Perforation Treatment Performed - Jet Perforation
2000-09-12 Well Log Performed
2000-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Suspended
2007-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-01 Plug Back Performed
2007-03-01 Well Fluid changed to Gas
2007-03-01 Well Mode changed to Abandoned Zone
2007-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-03 Perforation Treatment Performed - Jet Perforation
2007-03-03 Perforation Treatment Performed - Remedial Casing
2007-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-04 Perforation Treatment Performed - Jet Perforation
2007-03-04 Perforation Treatment Performed - Remedial Casing
2007-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-06 Perforation Treatment Performed - Jet Perforation
2007-03-06 Perforation Treatment Performed - Remedial Casing
2013-07-12 Well Abandoned
2013-07-12 Well Fluid changed to Gas
2013-07-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-12-21 Perforation 2152.80 2158.90 13
1992-03-31 Acid Treatment 2144.00 2145.00 0
1994-01-09 Perforation 2140.30 2141.30 20
1994-01-11 Acid Treatment 2140.30 2141.30 0
1994-08-08 Cement Squeeze 2140.30 2141.30 0
1994-08-14 Perforation 2135.00 2135.50 18
1994-08-15 Acid Treatment 2135.00 2135.50 0
1997-03-20 Perforation 2129.50 2130.50 16
1997-03-20 Perforation 2127.50 2128.50 16
1997-03-20 Perforation 2123.00 2124.00 16
1997-03-20 Perforation 2118.50 2129.50 16
1953-12-21 Bullet Perforation 2152.80 2158.90 13
1997-03-20 Perforation 2112.20 2113.20 16
1997-03-21 Acid Treatment 2112.20 2130.50 0
1999-08-04 Perforation 2102.00 2103.50 20
1999-08-04 Acid Wash 2102.00 2103.50 0
2000-09-09 Perforation 2001.00 2003.00 13
2000-09-11 Remedial Casing Cementing 2001.00 2003.00 0
2000-09-12 Perforation 1992.00 1997.00 13
2000-09-20 Acid Treatment 1992.00 1997.00 0
2002-04-09 Acid Treatment 1992.00 1997.00 0
2007-03-01 Packing Device Capped w/Cement 1516.00 1980.00 0
1972-12-16 Acid Treatment 2152.80 2158.90 0
2007-03-03 Perforation 843.00 844.00 17
2007-03-03 Remedial Casing Cementing 843.00 844.00 0
2007-03-03 Packing Device Capped w/Cement 823.00 833.00 0
2007-03-04 Perforation 619.00 620.00 17
2007-03-04 Remedial Casing Cementing 619.00 620.00 0
2007-03-04 Packing Device Capped w/Cement 593.00 607.00 0
2007-03-06 Perforation 260.00 261.00 17
2007-03-06 Remedial Casing Cementing 260.00 261.00 0
2007-03-06 Packing Device Capped w/Cement 240.00 250.00 0
1983-01-26 Acid Treatment 2152.80 2158.90 0
1984-04-17 Acid Treatment 2152.80 2158.90 0
1987-02-04 Acid Treatment 2152.80 2158.90 0
1988-04-12 Perforation 2149.50 2150.50 15
1988-04-12 Acid Treatment 2149.50 2150.50 0
1992-03-30 Perforation 2144.00 2145.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4459 0.0 0.0 0.0
1968 3791 0.0 0.0 0.0
1969 6415 0.0 0.0 0.0
1970 5127 0.0 0.0 0.0
1971 5882 0.0 0.0 0.0
1972 6411 0.0 0.0 0.0
1973 6667 0.0 0.0 0.0
1974 6860 0.0 0.0 0.0
1975 2554 0.0 0.0 0.0
1976 3527 0.0 0.0 0.0
1977 4361 0.0 0.0 0.0
1978 2791 0.0 0.0 0.0
1979 7351 0.0 0.0 0.0
1980 3394 0.0 0.0 0.0
1982 3806 0.0 0.0 0.0
1983 6025 0.0 0.0 0.0
1984 8508 0.0 0.0 0.0
1985 8079 0.0 0.0 0.0
1986 7287 0.0 0.0 0.0
1987 7093 0.0 0.0 0.0
1988 7919 0.0 0.0 0.0
1989 8511 0.0 0.0 0.0
1990 8613 0.0 0.0 0.0
1991 8382 0.0 0.0 0.0
1992 8081 0.0 0.0 0.0
1993 8518 0.0 0.0 0.0
1994 7999 0.0 0.0 0.0
1995 8413 0.0 0.0 0.0
1996 8403 0.0 0.0 0.0
1997 7130 0.0 0.0 0.0
1998 5505 0.0 0.0 0.0
1999 6579 0.0 0.0 0.0
2000 4514 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 8574 0.0 0.0 0.0
2003 7942 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1953-12-19 Lost Circulation 1987.60 1987.60

For data sources see[6]

References