X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474271805000

Well Details

Well ID: 0474271805000
Loading map...
Location: 00/05-18-047-27W4/0
Location Alias: 00/05-18-47-27 W4M
Location Alias 2: 00/05-18-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 18
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN 5-18-47-27
Operator Name: Imperial Oil Resources Limited
License Number: 0030692
License Date: 1966-07-15
License Status: Abandoned
Spud Date: 1966-07-19
Final Drill Date: 1966-08-05
Well Total Depth: 2188.50 m
Surface Hole Latitude: 53.052423
Surface Hole Longitude: -113.946753

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-15 Obtained License
1966-08-05 Finished Drilling
1966-08-05 Well Mode changed to Drilled and Cased
1966-08-07 Production Casing Operation Performed
1966-08-07 Well Log Performed
1966-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-25 Perforation Treatment Performed - Selective Jet Perforations
1966-08-28 Well Began Production
1966-08-28 Well Fluid changed to Crude Oil
1966-08-28 Well Mode changed to Flowing
1974-09-01 Well Fluid changed to Crude Oil
1974-09-01 Well Mode changed to Suspended
1975-10-27 Well Fluid changed to Crude Oil
1975-10-27 Well Mode changed to Flowing
1983-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-03 Well Log Performed
1988-03-24 Well Fluid changed to Crude Oil
1988-03-24 Well Mode changed to Pumping
1988-03-30 Perforation Treatment Performed - Cement Squeeze
1988-04-05 Perforation Treatment Performed - Jet Perforation
1988-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-01 Well Fluid changed to Crude Oil
1989-12-01 Well Mode changed to Suspended
1995-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-27 Plug Back Performed
1995-06-27 Well Fluid changed to Crude Oil
1995-06-27 Well Log Performed
1995-06-27 Well Mode changed to Abandoned
1995-08-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-25 Selective Jet Perforations 2155.20 2155.50 0
1995-06-27 Packing Device Capped w/Cement 2133.00 2141.00 0
1995-06-27 Packing Device Capped w/Cement 1507.00 1515.00 0
1966-08-25 Selective Jet Perforations 2155.90 2156.20 0
1966-08-25 Selective Jet Perforations 2156.50 2156.80 0
1966-08-25 Selective Jet Perforations 2157.10 2157.40 0
1966-08-25 Acid Treatment 2155.20 2157.40 0
1983-02-17 Acid Treatment 2155.20 2157.40 0
1988-03-30 Cement Squeeze 2155.20 2157.40 0
1988-04-05 Perforation 2155.40 2155.90 7
1988-04-06 Acid Treatment 2155.40 2155.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1975 520 0.0 0.0 0.0
1976 4023 0.0 0.0 0.0
1977 1900 0.0 0.0 0.0
1978 1572 0.0 0.0 0.0
1979 1371 0.0 0.0 0.0
1982 378 0.0 0.0 0.0
1983 976 0.0 0.0 0.0
1984 912 0.0 0.0 0.0
1985 7556 0.0 0.0 0.0
1986 3671 0.0 0.0 0.0
1987 4661 0.0 0.0 0.0
1988 4927 0.0 0.0 0.0

For data sources see[5]

References