X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270708000

Well Details

Well ID: 0474270708000
Loading map...
Location: 00/08-07-047-27W4/0
Location Alias: 00/08-07-47-27 W4M
Location Alias 2: 00/08-07-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: CHEVRON BGLEN 8-7-47-27
Operator Name: Chevron Canada Limited
License Number: 0005829
License Date: 1952-12-15
License Status: RecCertified
Spud Date: 1952-12-17
Final Drill Date: 1953-02-04
Well Total Depth: 2172.30 m
Surface Hole Latitude: 53.037708
Surface Hole Longitude: -113.930206

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-15 Obtained License
1953-02-04 Finished Drilling
1953-02-04 Well Mode changed to Drilled and Cased
1953-02-07 Perforation Treatment Performed - Bullet Perforation
1953-02-08 Well Began Production
1953-02-08 Well Fluid changed to Crude Oil
1953-02-08 Well Mode changed to Flowing
1983-07-11 Perforation Treatment Performed - Cement Squeeze
1983-07-13 Perforation Treatment Performed - Jet Perforation
1983-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-17 Perforation Treatment Performed - Cement Squeeze
1984-08-28 Perforation Treatment Performed - Jet Perforation
1984-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-04 Well Log Performed
1985-11-08 Perforation Treatment Performed - Cement Squeeze
1985-11-13 Well Log Performed
1985-11-24 Perforation Treatment Performed - Open-Hole Completion
1985-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-22 Perforation Treatment Performed - Cement Squeeze
1986-09-04 Production Casing Operation Performed
1986-09-11 Perforation Treatment Performed - Jet Perforation
1986-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-07 Perforation Treatment Performed - Cement Squeeze
1987-10-12 Perforation Treatment Performed - Cement Squeeze
1987-10-17 Perforation Treatment Performed - Jet Perforation
1987-10-17 Well Log Performed
1987-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1988-12-02 Perforation Treatment Performed - Chemical Squeeze
1990-03-20 Perforation Treatment Performed - Jet Perforation
1990-03-20 Well Log Performed
1990-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-23 Well Log Performed
1991-06-07 Perforation Treatment Performed - Jet Perforation
1991-06-07 Well Log Performed
1991-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-22 Well Log Performed
1995-03-15 Perforation Treatment Performed - Jet Perforation
1995-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-10 Plug Back Performed
1999-11-10 Well Fluid changed to Crude Oil
1999-11-10 Well Mode changed to Abandoned Zone
1999-12-05 Well Abandoned
1999-12-05 Well Fluid changed to Crude Oil
1999-12-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-07 Bullet Perforation 2137.60 2143.70 13
1985-11-08 Cement Squeeze 2165.00 2165.50 0
1985-11-24 Open Hole/Barefoot Completion 2170.20 2172.30 0
1985-11-25 Acid Treatment 2170.20 2172.30 0
1986-08-22 Cement Squeeze 2170.20 2172.30 0
1986-09-11 Perforation 2162.00 2162.50 13
1986-09-12 Acid Treatment 2162.00 2162.50 0
1986-09-13 Acid Treatment 2162.00 2162.50 0
1986-10-21 Acid Treatment 2162.00 2162.50 0
1987-10-07 Acid Treatment 2137.60 2143.70 0
1987-10-07 Cement Squeeze 2137.60 2143.70 0
1983-07-11 Cement Squeeze 2137.60 2143.70 0
1987-10-12 Cement Squeeze 2137.60 2162.90 0
1987-10-17 Perforation 2164.00 2164.50 13
1987-10-18 Acid Treatment 2164.00 2164.50 0
1987-10-20 Acid Treatment 2164.00 2164.50 0
1988-12-02 Chemical Squeeze 2164.00 2164.50 0
1990-03-20 Perforation 2163.30 2163.80 13
1990-03-23 Acid Treatment 2163.30 2163.80 0
1991-06-07 Perforation 2162.00 2162.50 13
1991-06-11 Acid Treatment 2162.00 2163.80 0
1995-03-15 Perforation 2146.50 2147.50 13
1983-07-13 Perforation 2161.60 2162.90 13
1995-03-16 Acid Treatment 2146.50 2147.50 0
1999-11-10 Packing Device Capped w/Cement 1955.00 1963.00 0
1983-07-15 Acid Treatment 2161.60 2162.90 0
1984-07-17 Cement Squeeze 2161.60 2162.90 0
1984-08-28 Perforation 2165.00 2165.50 13
1984-08-29 Acid Treatment 2165.00 2165.50 0
1984-08-31 Acid Treatment 2165.00 2165.50 0
1985-01-18 Acid Treatment 2165.00 2165.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1572 0.0 0.0 0.0
1983 3476 0.0 0.0 0.0
1984 5176 0.0 0.0 0.0
1985 2872 0.0 0.0 0.0
1986 1995 0.0 0.0 0.0
1987 4196 0.0 0.0 0.0
1988 3623 0.0 0.0 0.0
1989 7638 0.0 0.0 0.0
1990 7830 0.0 0.0 0.0
1991 2675 0.0 0.0 0.0
1992 168 0.0 0.0 0.0
1993 96 0.0 0.0 0.0
1995 3510 0.0 0.0 0.0
1996 485 0.0 0.0 0.0

For data sources see[5]

References