X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270703000

Well Details

Well ID: 0474270703000
Loading map...
Location: 00/03-07-047-27W4/0
Location Alias: 00/03-07-47-27 W4M
Location Alias 2: 00/03-07-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: CHEVRON BGLEN 3-7-47-27
Operator Name: Chevron Canada Limited
License Number: 0005933
License Date: 1953-01-07
License Status: RecCertified
Spud Date: 1953-01-18
Final Drill Date: 1953-03-03
Well Total Depth: 2204.50 m
Surface Hole Latitude: 53.034129
Surface Hole Longitude: -113.941159

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-01-07 Obtained License
1953-02-24 Liner Casing Operation Performed
1953-03-03 Finished Drilling
1953-03-03 Well Mode changed to Drilled and Cased
1953-03-08 Perforation Treatment Performed - Jet Perforation
1953-03-10 Well Began Production
1953-03-10 Well Fluid changed to Crude Oil
1953-03-10 Well Mode changed to Pumping
1978-07-12 Perforation Treatment Performed - Cement Squeeze
1978-07-17 Perforation Treatment Performed - Jet Perforation
1978-07-18 Perforation Treatment Performed - Acid Wash - No Pressure
1978-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-28 Perforation Treatment Performed - Jet Perforation
1982-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-29 Perforation Treatment Performed - Cement Squeeze
1985-07-29 Perforation Treatment Performed - Jet Perforation
1985-08-02 Perforation Treatment Performed - Open-Hole Completion
1985-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-23 Perforation Treatment Performed - Cement Plug
1985-10-23 Perforation Treatment Performed - Open-Hole Completion
1986-06-08 Perforation Treatment Performed - Cement Squeeze
1986-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-18 Perforation Treatment Performed - Jet Perforation
1986-06-30 Perforation Treatment Performed - Cement Squeeze
1986-07-04 Perforation Treatment Performed - Jet Perforation
1986-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-16 Perforation Treatment Performed - Jet Perforation
1986-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-26 Perforation Treatment Performed - Jet Perforation
1994-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-21 Perforation Treatment Performed - Jet Perforation
1999-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-29 Plug Back Performed
1999-10-29 Well Fluid changed to Crude Oil
1999-10-29 Well Mode changed to Abandoned Zone
1999-12-04 Well Abandoned
1999-12-04 Well Fluid changed to Crude Oil
1999-12-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-03-08 Perforation 2167.70 2174.40 26
1985-07-29 Cement Squeeze 2194.00 2199.40 0
1985-08-02 Open Hole/Barefoot Completion 2201.90 2204.50 0
1985-08-07 Acid Treatment 2201.90 2204.50 0
1985-10-23 Cement Plug 2202.90 2204.50 0
1985-10-23 Open Hole/Barefoot Completion 2201.90 2202.90 0
1986-06-08 Cement Squeeze 2201.90 2202.90 0
1986-06-18 Perforation 2192.50 2193.50 13
1986-06-18 Perforation 2197.50 2198.50 13
1986-06-18 Acid Treatment 2192.50 2198.50 0
1986-06-30 Cement Squeeze 2192.50 2198.50 0
1978-07-12 Cement Squeeze 2167.70 2174.40 0
1986-07-04 Perforation 2195.50 2196.00 13
1986-07-05 Acid Treatment 2195.50 2196.00 0
1986-07-07 Acid Treatment 2195.50 2196.00 0
1986-07-12 Acid Treatment 2195.50 2196.00 0
1986-07-16 Perforation 2195.50 2196.00 13
1986-07-17 Acid Treatment 2195.50 2196.00 0
1986-07-22 Acid Treatment 2195.50 2196.00 0
1986-07-23 Acid Treatment 2195.50 2196.00 0
1987-06-02 Acid Treatment 2195.50 2196.00 0
1994-03-26 Perforation 2183.00 2183.50 17
1978-07-17 Perforation 2197.90 2199.40 13
1994-03-27 Acid Treatment 2183.00 2183.50 0
1995-02-21 Perforation 2179.00 2179.50 14
1999-10-29 Packing Device Capped w/Cement 2000.00 2008.00 0
1978-07-18 Acid Wash 2197.90 2199.40 0
1978-07-19 Acid Treatment 2197.90 2199.40 0
1982-05-27 Packing Device Capped w/Cement 2196.10 2197.90 0
1982-05-28 Perforation 2194.00 2195.80 13
1982-05-31 Acid Treatment 2194.00 2195.80 0
1985-07-29 Perforation 2197.90 2199.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5793 0.0 0.0 0.0
1968 6984 0.0 0.0 0.0
1969 8371 0.0 0.0 0.0
1970 7244 0.0 0.0 0.0
1971 8479 0.0 0.0 0.0
1972 8139 0.0 0.0 0.0
1973 8456 0.0 0.0 0.0
1974 6927 0.0 0.0 0.0
1975 6579 0.0 0.0 0.0
1976 6966 0.0 0.0 0.0
1977 6460 0.0 0.0 0.0
1978 6034 0.0 0.0 0.0
1979 7746 0.0 0.0 0.0
1980 6241 0.0 0.0 0.0
1981 7217 0.0 0.0 0.0
1982 3499 0.0 0.0 0.0
1983 7230 0.0 0.0 0.0
1984 6462 0.0 0.0 0.0
1985 5115 0.0 0.0 0.0
1986 4467 0.0 0.0 0.0
1987 6523 0.0 0.0 0.0
1988 8327 0.0 0.0 0.0
1989 8267 0.0 0.0 0.0
1990 8248 0.0 0.0 0.0
1991 8469 0.0 0.0 0.0
1992 8425 0.0 0.0 0.0
1993 8714 0.0 0.0 0.0
1994 3572 0.0 0.0 0.0
1995 7187 0.0 0.0 0.0
1996 8666 0.0 0.0 0.0
1997 1128 0.0 0.0 0.0

For data sources see[5]

References