X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270615002

Well Details

Well ID: 0474270615002
Loading map...
Location: 00/15-06-047-27W4/2
Location Alias: 00/15-06-47-27 W4M
Location Alias 2: 00/15-06-047-27 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 06
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN NO. B-8
Operator Name: Imperial Oil Resources Limited
License Number: 0005769
License Date: 1952-12-05
License Status: Abandoned
Spud Date: 1953-01-17
Final Drill Date: 1953-02-27
Well Total Depth: 2211.30 m
Surface Hole Latitude: 53.030493
Surface Hole Longitude: -113.936184

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-05 Obtained License
1953-02-20 Liner Casing Operation Performed
1953-02-27 Finished Drilling
1953-02-27 Well Mode changed to Drilled and Cased
1953-03-02 Perforation Treatment Performed - Bullet Perforation
1953-03-02 Perforation Treatment Performed - Jet Perforation
1970-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-10 Perforation Treatment Performed - Cement Squeeze
1982-11-15 Perforation Treatment Performed - Jet Perforation
1982-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-19 Well Log Performed
1990-01-05 Perforation Treatment Performed - Jet Perforation
1990-01-05 Well Log Performed
1990-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-16 Perforation Treatment Performed - Jet Perforation
1997-05-01 Perforation Treatment Performed - Jet Perforation
1997-05-01 Well Log Performed
1998-04-13 Perforation Treatment Performed - Jet Perforation
1998-04-13 Well Log Performed
1998-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-28 Perforation Treatment Performed - Jet Perforation
1999-02-28 Well Log Performed
1999-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-02 Perforation Treatment Performed - Jet Perforation
1999-09-02 Well Log Performed
1999-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-20 Perforation Treatment Performed - Jet Perforation
2000-01-20 Well Log Performed
2000-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-13 Plug Back Performed
2000-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-14 Perforation Treatment Performed - Jet Perforation
2000-04-14 Well Log Performed
2000-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-04 Well Began Production
2000-05-04 Well Fluid changed to Crude Oil
2000-05-04 Well Mode changed to Pumping
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Suspended
2000-08-02 Well Fluid changed to Crude Oil
2000-08-02 Well Mode changed to Suspended
2002-04-20 Perforation Treatment Performed - Cement Plug
2002-04-20 Plug Back Performed
2002-04-20 Well Fluid changed to Crude Oil
2002-04-20 Well Mode changed to Abandoned Zone
2002-04-24 Perforation Treatment Performed - Jet Perforation
2002-04-24 Well Log Performed
2003-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-25 Well Log Performed
2003-03-05 Perforation Treatment Performed - Cement Plug
2003-03-28 Perforation Treatment Performed - Cement Plug
2003-04-09 Perforation Treatment Performed - Cement Plug
2003-04-21 Perforation Treatment Performed - Cement Plug
2003-05-08 Well Log Performed
2003-07-14 Well Log Performed
2014-05-18 Well Log Performed
2014-05-19 Well Log Performed
2014-05-20 Well Log Performed
2014-05-21 Well Log Performed
2014-05-22 Well Log Performed
2014-05-23 Perforation Treatment Performed - Jet Perforation
2014-05-23 Well Log Performed
2014-05-24 Perforation Treatment Performed - Cement Plug
2014-05-24 Perforation Treatment Performed - Remedial Casing
2014-05-24 Plug Back Performed
2014-05-25 Perforation Treatment Performed - Cement Plug
2014-05-26 Perforation Treatment Performed - Jet Perforation
2014-05-26 Well Log Performed
2014-05-27 Perforation Treatment Performed - Cement Plug
2014-05-27 Perforation Treatment Performed - Remedial Casing
2015-06-30 Well Abandoned
2015-06-30 Well Fluid changed to Crude Oil
2015-06-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-03-02 Bullet Perforation 2193.30 2199.40 13
1990-01-08 Acid Treatment 2199.00 2199.30 0
1995-06-16 Perforation 2188.50 2189.00 13
1997-05-01 Perforation 2179.80 2180.40 13
1998-04-13 Perforation 2172.70 2173.30 13
1998-04-14 Acid Treatment 2172.70 2173.30 0
1999-02-28 Perforation 2162.00 2163.00 20
1999-03-01 Acid Treatment 2162.00 2163.00 0
1999-09-02 Perforation 2155.00 2156.60 20
1999-09-03 Acid Treatment 2155.00 2156.60 0
2000-01-20 Perforation 2148.60 2149.60 17
1953-03-02 Perforation 2193.30 2199.40 13
2000-01-20 Acid Treatment 2148.60 2149.60 0
2000-04-13 Packing Device Capped w/Cement 2133.50 2142.00 18
2000-04-14 Perforation 1954.50 1955.70 18
2000-04-14 Perforation 1956.50 1958.00 18
2000-04-14 Acid Treatment 1954.50 1958.00 0
2000-04-24 Acid Treatment 1954.50 1958.00 0
2000-04-26 Acid Treatment 1954.50 1958.00 0
2002-04-20 Cement Plug 1749.00 2015.00 0
2002-04-24 Perforation 2039.00 2047.00 17
2002-04-24 Perforation 2056.00 2062.50 17
1970-02-19 Acid Treatment 2193.30 2199.40 0
2003-02-18 Acid Treatment 2039.00 2047.00 0
2003-03-05 Cement Plug 2060.50 2070.00 0
2003-03-28 Cement Plug 2060.00 2061.00 0
2003-04-09 Cement Plug 2058.00 2060.00 0
2003-04-21 Cement Plug 2057.00 2058.00 0
2014-05-23 Perforation 1445.70 1446.70 17
2014-05-23 Perforation 668.10 669.10 17
2014-05-23 Perforation 601.00 602.00 17
2014-05-24 Remedial Casing Cementing 601.00 1446.70 0
2014-05-24 Cement Plug 610.00 2024.80 0
1980-10-09 Acid Treatment 2193.30 2199.40 0
2014-05-25 Cement Plug 592.20 602.50 0
2014-05-26 Perforation 516.00 517.00 17
2014-05-26 Perforation 470.00 471.00 17
2014-05-26 Perforation 403.00 404.00 17
2014-05-26 Perforation 330.00 331.00 17
2014-05-26 Perforation 287.00 288.00 17
2014-05-26 Perforation 214.00 215.00 17
2014-05-26 Perforation 201.00 202.00 17
2014-05-27 Remedial Casing Cementing 201.00 517.00 0
2014-05-27 Cement Plug 205.00 591.80 0
1982-11-10 Cement Squeeze 2193.30 2199.40 0
2014-05-27 Cement Plug 190.20 205.00 0
2014-05-27 Cement Plug 169.80 189.80 0
1982-11-15 Perforation 2200.50 2202.50 13
1982-11-17 Acid Treatment 2200.50 2202.50 0
1984-01-02 Acid Treatment 2200.50 2202.50 0
1990-01-05 Perforation 2199.00 2199.30 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 283 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-05-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References