X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270513000

Well Details

Well ID: 0474270513000
Loading map...
Location: 00/13-05-047-27W4/0
Location Alias: 00/13-05-47-27 W4M
Location Alias 2: 00/13-05-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 05
County/Municipality: County of Wetaskiwin No. 10
Well Name: CHEVRON BGLEN 13-5-47-27
Operator Name: Chevron Canada Limited
License Number: 0005827
License Date: 1952-12-15
License Status: RecCertified
Spud Date: 1953-01-02
Final Drill Date: 1953-02-14
Well Total Depth: 2200.90 m
Surface Hole Latitude: 53.030467
Surface Hole Longitude: -113.924630

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-15 Obtained License
1953-02-10 Production Casing Operation Performed
1953-02-14 Finished Drilling
1953-02-14 Perforation Treatment Performed - Open-Hole Completion
1953-02-14 Well Mode changed to Drilled and Cased
1953-02-15 Well Began Production
1953-02-15 Well Fluid changed to Crude Oil
1953-02-15 Well Mode changed to Flowing
1979-09-06 Perforation Treatment Performed - Cement Squeeze
1979-09-06 Perforation Treatment Performed - Open-Hole Completion
1983-02-18 Perforation Treatment Performed - Open-Hole Completion
1983-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-19 Perforation Treatment Performed - Cement Squeeze
1984-04-03 Well Log Performed
1984-04-15 Perforation Treatment Performed - Jet Perforation
1984-04-15 Well Log Performed
1984-04-16 Perforation Treatment Performed - Acid Wash - No Pressure
1985-12-05 Well Log Performed
1985-12-12 Perforation Treatment Performed - Cement Squeeze
1985-12-17 Perforation Treatment Performed - Jet Perforation
1985-12-18 Perforation Treatment Performed - Acid Wash - No Pressure
1985-12-19 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1989-06-07 Well Log Performed
1990-07-14 Well Log Performed
1990-07-15 Perforation Treatment Performed - Jet Perforation
1990-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-20 Well Log Performed
1990-08-21 Perforation Treatment Performed - Cement Squeeze
1990-08-22 Perforation Treatment Performed - Jet Perforation
1990-08-22 Well Log Performed
1990-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-15 Perforation Treatment Performed - Jet Perforation
1993-05-15 Well Log Performed
1993-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-20 Perforation Treatment Performed - Jet Perforation
1993-05-20 Well Log Performed
1998-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-13 Plug Back Performed
1998-12-19 Plug Back Performed
1998-12-21 Plug Back Performed
1999-01-19 Well Abandoned
1999-01-19 Well Fluid changed to Crude Oil
1999-01-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-14 Open Hole/Barefoot Completion 2180.80 2194.30 0
1985-12-17 Perforation 2195.00 2196.00 14
1985-12-18 Acid Wash 2195.00 2196.00 0
1985-12-19 Acid Wash 2195.00 2196.00 0
1987-06-08 Acid Treatment 2195.00 2196.00 0
1990-07-15 Perforation 2189.50 2190.00 7
1990-07-17 Acid Treatment 2189.50 2190.00 0
1990-08-21 Cement Squeeze 2189.50 2190.00 0
1990-08-22 Perforation 2186.80 2187.30 13
1990-08-23 Acid Treatment 2186.80 2187.30 0
1990-08-24 Acid Treatment 2186.80 2187.30 0
1979-09-06 Cement Squeeze 2187.00 2194.30 0
1990-08-26 Acid Treatment 2186.80 2187.30 0
1993-05-15 Perforation 2176.00 2177.00 14
1993-05-17 Acid Treatment 2176.00 2177.00 0
1993-05-18 Acid Treatment 2176.00 2177.00 0
1993-05-20 Perforation 2178.00 2180.00 14
1998-12-13 Packing Device Capped w/Cement 2161.00 2169.00 0
1979-09-06 Open Hole/Barefoot Completion 2180.80 2187.00 0
1983-02-18 Open Hole/Barefoot Completion 2180.80 2191.60 0
1983-04-05 Acid Treatment 2180.80 2184.00 0
1984-03-19 Cement Squeeze 2180.80 2191.60 0
1984-04-15 Perforation 2192.00 2192.50 13
1984-04-16 Acid Wash 2192.00 2192.50 0
1985-12-12 Cement Squeeze 2192.00 2192.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5973 0.0 0.0 0.0
1968 5568 0.0 0.0 0.0
1969 7388 0.0 0.0 0.0
1970 6122 0.0 0.0 0.0
1971 7536 0.0 0.0 0.0
1972 7568 0.0 0.0 0.0
1973 8461 0.0 0.0 0.0
1974 7283 0.0 0.0 0.0
1975 4566 0.0 0.0 0.0
1976 5537 0.0 0.0 0.0
1977 5588 0.0 0.0 0.0
1978 6412 0.0 0.0 0.0
1979 7956 0.0 0.0 0.0
1980 8583 0.0 0.0 0.0
1981 7340 0.0 0.0 0.0
1982 6897 0.0 0.0 0.0
1983 6693 0.0 0.0 0.0
1984 4668 0.0 0.0 0.0
1985 5962 0.0 0.0 0.0
1986 8265 0.0 0.0 0.0
1987 7800 0.0 0.0 0.0
1988 8035 0.0 0.0 0.0
1989 7545 0.0 0.0 0.0
1990 3762 0.0 0.0 0.0
1991 6025 0.0 0.0 0.0
1992 8253 0.0 0.0 0.0
1993 7197 0.0 0.0 0.0
1994 1128 0.0 0.0 0.0

For data sources see[5]

References