X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474263210000

Well Details

Well ID: 0474263210000
Loading map...
Location: 00/10-32-047-26W4/0
Location Alias: 00/10-32-47-26 W4M
Location Alias 2: 00/10-32-047-26 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 26
Section: 32
County/Municipality: County of Wetaskiwin No. 10
Well Name: CANETIC RES WATELET 10-32-47-26
Operator Name: Obsidian Energy Ltd.
License Number: 0180673
License Date: 1995-09-12
License Status: Abandoned
Spud Date: 1995-09-18
Final Drill Date: 1995-09-26
Well Total Depth: 1565.00 m
Surface Hole Latitude: 53.100102
Surface Hole Longitude: -113.764335

For data sources see[1][2]

Well History

Date Event
1995-09-12 Obtained License
1995-09-19 Surface Casing Operation Performed
1995-09-22 Direction Drilling Operation Performed - Deviate
1995-09-26 Finished Drilling
1995-09-26 Well Mode changed to Drilled and Cased
1995-09-27 Drill Stem Test Performed
1995-09-27 Well Log Performed
1995-09-28 Well Log Performed
1995-09-29 Drill Stem Test Performed
1995-09-30 Production Casing Operation Performed
1995-10-01 Rig Released
1995-10-07 Well Log Performed
1995-10-08 Well Log Performed
1995-10-09 Perforation Treatment Performed - Jet Perforation
1995-12-01 Well Began Production
1995-12-01 Well Fluid changed to Gas
1995-12-01 Well Mode changed to Flowing
1998-07-07 Perforation Treatment Performed - Fractured
1999-10-22 Well Log Performed
1999-10-23 Perforation Treatment Performed - Jet Perforation
2000-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-16 Plug Back Performed
2000-01-16 Well Fluid changed to Gas
2000-01-16 Well Mode changed to Abandoned Zone
2000-01-17 Perforation Treatment Performed - Jet Perforation
2000-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-20 Perforation Treatment Performed - Fractured
2002-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-13 Perforation Treatment Performed - Jet Perforation
2002-03-13 Perforation Treatment Performed - Remedial Casing
2002-03-13 Plug Back Performed
2002-03-13 Well Log Performed
2002-03-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-09-22 1158.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-09 Perforation 1487.00 1493.00 18
2002-03-13 Perforation 200.00 200.30 17
2002-03-13 Remedial Casing Cementing 200.00 200.30 0
1998-07-07 Fracture 1487.00 1493.00 0
1999-10-23 Perforation 1487.00 1488.40 13
1999-10-23 Perforation 1490.00 1491.20 13
2000-01-16 Packing Device Capped w/Cement 1472.00 1480.00 0
2000-01-17 Perforation 1383.50 1385.50 17
2000-01-19 Acid Treatment 1383.50 1385.50 0
2000-01-20 Fracture 1383.50 1385.50 0
2002-03-13 Packing Device Capped w/Cement 1371.00 1379.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1023 0.0 0.0 0.0
1996 7585 0.0 0.0 0.0
1997 8097 0.0 0.0 0.0
1998 7531 0.0 0.0 0.0
1999 3622 0.0 0.0 0.0

For data sources see[6]

References