X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474110310003

Well Details

Well ID: 0474110310003
Loading map...
Location: 00/10-03-047-11W4/3
Location Alias: 00/10-03-47-11 W4M
Location Alias 2: 00/10-03-047-11 W4/03
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 11
Section: 03
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 10-3-47-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0282151
License Date: 2003-02-05
License Status: Issued
Spud Date: 2003-02-15
Final Drill Date: 2003-02-17
Well Total Depth: 862.00 m
Surface Hole Latitude: 53.024876
Surface Hole Longitude: -111.523038

For data sources see[1][2]

Well History

Date Event
2003-02-05 Obtained License
2003-02-15 Surface Casing Operation Performed
2003-02-17 Finished Drilling
2003-02-17 Well Log Performed
2003-02-17 Well Mode changed to Drilled and Cased
2003-02-18 Production Casing Operation Performed
2003-02-18 Rig Released
2003-03-07 Perforation Treatment Performed - Jet Perforation
2003-03-07 Well Log Performed
2003-03-13 Perforation Treatment Performed - Fractured
2003-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-17 Plug Back Performed
2003-03-17 Well Log Performed
2003-03-18 Perforation Treatment Performed - Jet Perforation
2003-03-18 Well Log Performed
2003-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-19 Perforation Treatment Performed - Jet Perforation
2003-03-19 Plug Back Performed
2003-03-19 Well Log Performed
2003-05-03 Well Began Production
2003-05-03 Well Fluid changed to Gas
2003-05-03 Well Mode changed to Flowing
2014-11-01 Well Fluid changed to Gas
2014-11-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-07 Perforation 796.00 798.00 20
2003-03-13 Fracture 796.00 798.00 0
2003-03-17 Packing Device Capped w/Cement 782.00 790.00 0
2003-03-18 Perforation 774.00 776.00 20
2003-03-18 Perforation 777.50 782.00 20
2003-03-19 Packing Device Capped w/Cement 757.00 765.00 0
2003-03-19 Perforation 639.50 641.50 20
2003-03-19 Perforation 643.00 647.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5733 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8757 0.0 0.0 0.0
2008 8766 0.0 0.0 0.0
2009 6930 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8438 0.0 0.0 0.0
2012 8639 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 8238 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 744 0.0 0.0 0.0

For data sources see[5]

References