X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474083510002

Well Details

Well ID: 0474083510002
Loading map...
Location: 00/10-35-047-08W4/2
Location Alias: 00/10-35-47-08 W4M
Location Alias 2: 00/10-35-047-08 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 08
Section: 35
County/Municipality: County of Minburn No. 27
Well Name: MERLAND PCP KINSELLA 10-35-47-8
Operator Name: Canadian Natural Resources Limited
License Number: 0084803
License Date: 1980-08-08
License Status: Abandoned
Spud Date: 1980-08-10
Final Drill Date: 1980-08-13
Well Total Depth: 746.00 m
Surface Hole Latitude: 53.099487
Surface Hole Longitude: -111.064936

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-08 Obtained License
1980-08-13 Finished Drilling
1980-08-13 Lost Circulation Occurred
1980-08-14 Production Casing Operation Performed
1980-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-02 Perforation Treatment Performed - Jet Perforation
1980-09-04 Perforation Treatment Performed - Fractured
1982-06-02 Perforation Treatment Performed - Jet Perforation
1982-06-10 Perforation Treatment Performed - Fractured
1984-10-31 Well Mode changed to Drilled and Cased
1996-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-11 Perforation Treatment Performed - Jet Perforation
1996-06-12 Perforation Treatment Performed - Remedial Casing
1998-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-09 Plug Back Performed
1998-07-10 Perforation Treatment Performed - Cement Squeeze
1998-07-10 Plug Back Performed
1998-07-10 Well Mode changed to Abandoned Zone
1999-09-13 Perforation Treatment Performed - Jet Perforation
1999-09-13 Perforation Treatment Performed - Remedial Casing
1999-10-23 Well Abandoned
1999-10-23 Well Mode changed to Abandoned
2001-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-13 Perforation Treatment Performed - Jet Perforation
2001-09-13 Perforation Treatment Performed - Remedial Casing
2012-02-22 Well Log Performed
2012-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-23 Perforation Treatment Performed - Jet Perforation
2012-02-23 Well Log Performed
2012-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-24 Perforation Treatment Performed - Remedial Casing
2012-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-25 Perforation Treatment Performed - Jet Perforation
2012-02-25 Well Log Performed
2012-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-27 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-02 Perforation 683.00 685.00 13
1996-06-11 Perforation 259.00 260.00 13
1996-06-12 Remedial Casing Cementing 259.00 260.00 0
1998-07-09 Packing Device Capped w/Cement 516.00 524.00 0
1998-07-10 Cement Squeeze 504.00 509.00 0
1999-09-13 Perforation 335.00 336.00 11
1999-09-13 Remedial Casing Cementing 335.00 336.00 0
2001-09-13 Perforation 335.00 336.00 11
2001-09-13 Remedial Casing Cementing 335.00 336.00 0
2001-09-13 Packing Device Capped w/Cement 325.00 333.00 0
2012-02-23 Packing Device Capped w/Cement 487.90 497.00 0
1980-09-02 Packing Device Capped w/Cement 667.00 675.00 0
2012-02-23 Perforation 337.00 340.00 17
2012-02-24 Remedial Casing Cementing 337.00 340.00 0
2012-02-24 Packing Device Capped w/Cement 311.00 328.00 0
2012-02-25 Packing Device Capped w/Cement 240.00 250.00 0
2012-02-25 Perforation 231.00 234.00 17
2012-02-27 Remedial Casing Cementing 231.00 234.00 0
2012-02-27 Packing Device Capped w/Cement 212.00 225.00 0
1980-09-02 Perforation 504.00 505.00 5
1980-09-02 Perforation 507.00 509.00 5
1980-09-04 Fracture 504.00 509.00 0
1982-06-02 Perforation 553.50 555.00 4
1982-06-02 Perforation 557.00 559.00 4
1982-06-10 Fracture 553.50 559.00 0
1996-06-10 Packing Device Capped w/Cement 481.00 489.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-08-13 Lost Circulation 745.00 746.00

For data sources see[5]

References