X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474050509B02

Well Details

Well ID: 0474050509B02
Loading map...
Location: B0/09-05-047-05W4/2
Location Alias: B0/09-05-47-05 W4M
Location Alias 2: B0/09-05-047-05 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 05
Section: 05
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PEMBINA ET AL BAXTER 9B-5-47-5
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0025118
License Date: 1963-11-13
License Status: RecCertified
Spud Date: 1963-11-15
Final Drill Date: 1963-11-18
Well Total Depth: 673.60 m
Surface Hole Latitude: 53.024593
Surface Hole Longitude: -110.691828

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-13 Obtained License
1963-11-18 Finished Drilling
1963-11-18 Well Mode changed to Drilled and Cased
1963-11-19 Production Casing Operation Performed
1963-12-05 Perforation Treatment Performed - Jet Perforation
1968-10-25 Perforation Treatment Performed - Cement Plug
1968-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-10-29 Perforation Treatment Performed - Jet Perforation
1968-11-08 Well Began Production
1968-11-08 Well Fluid changed to Gas
1968-11-08 Well Mode changed to Flowing
1979-09-30 Well Fluid changed to Gas
1979-09-30 Well Mode changed to Suspended
1990-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-16 Plug Back Performed
1990-02-16 Well Fluid changed to Gas
1990-02-16 Well Mode changed to Abandoned
1990-02-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-12-05 Perforation 665.70 667.50 7
1968-10-25 Cement Plug 657.80 670.60 0
1968-10-28 Packing Device Capped w/Cement 649.20 649.20 0
1968-10-29 Perforation 614.00 614.30 7
1968-10-29 Perforation 614.30 614.90 7
1990-02-16 Packing Device Capped w/Cement 595.50 603.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 744 0.0 0.0 0.0
1970 6576 0.0 0.0 0.0
1971 8736 0.0 0.0 0.0
1972 8773 0.0 0.0 0.0
1973 8759 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8711 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8759 0.0 0.0 0.0
1978 8615 0.0 0.0 0.0
1979 6335 0.0 0.0 0.0

For data sources see[5]

References