X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465171410000

Well Details

Well ID: 0465171410000
Loading map...
Location: 00/10-14-046-17W5/0
Location Alias: 00/10-14-46-17 W5M
Location Alias 2: 00/10-14-046-17 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 17
Section: 14
County/Municipality: Yellowhead County
Well Name: MOBIL ET AL HANLAN 10-14-46-17
Operator Name: Tourmaline Oil Corp.
License Number: 0179387
License Date: 1995-07-19
License Status: Suspension
Spud Date: 1995-09-06
Final Drill Date: 1996-02-15
Well Total Depth: 5100.00 m
Surface Hole Latitude: 52.971464
Surface Hole Longitude: -116.355965

For data sources see[1][2]

Well History

Date Event
1995-07-19 Obtained License
1995-09-11 Surface Casing Operation Performed
1995-09-20 Lost Circulation Occurred
1995-09-23 Lost Circulation Occurred
1995-09-26 Lost Circulation Occurred
1995-10-04 Lost Circulation Occurred
1995-10-07 Lost Circulation Occurred
1995-10-12 Lost Circulation Occurred
1995-11-08 Well Log Performed
1995-11-13 Intermediate Casing Operation Performed
1995-11-14 Well Log Performed
1995-12-21 Well Log Performed
1995-12-24 Well Log Performed
1996-01-01 Well Log Performed
1996-01-11 Well Log Performed
1996-01-16 Direction Drilling Operation Performed - Horizontal
1996-01-27 Well Log Performed
1996-01-30 Liner Casing Operation Performed
1996-01-30 Lost Circulation Occurred
1996-02-03 Well Log Performed
1996-02-15 Finished Drilling
1996-02-15 Well Log Performed
1996-02-15 Well Mode changed to Drilled and Cased
1996-02-16 Well Log Performed
1996-02-17 Well Log Performed
1996-02-18 Liner Casing Operation Performed
1996-02-18 Perforation Treatment Performed - Slotted Liner or Casing
1996-02-22 Perforation Treatment Performed - Open-Hole Completion
1996-02-22 Rig Released
1996-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-14 Well Began Production
1996-05-14 Well Fluid changed to Gas
1996-05-14 Well Mode changed to Flowing
2004-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-09 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-07-09 Plug Back Performed
2004-07-09 Well Fluid changed to Gas
2004-07-09 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-01-16 4592.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-18 Slotted Liner 4835.00 4871.00 0
1996-02-22 Open Hole/Barefoot Completion 4871.00 5100.00 0
1996-03-22 Acid Treatment 4871.00 4980.00 0
2004-07-09 Packing Device Capped w/Cement 4840.80 4851.20 0
2004-07-09 Bridge Plug, No Cement 4566.30 4566.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5662 0.0 0.0 0.0
1997 8366 0.0 0.0 0.0
1998 8164 0.0 0.0 0.0
1999 8282 0.0 0.0 0.0
2000 8466 0.0 0.0 0.0
2001 8546 0.0 0.0 0.0
2002 8035 0.0 0.0 0.0
2003 3626 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-09-20 Lost Circulation 1277.00 1277.00
1995-09-23 Lost Circulation 1357.00 1527.00
1995-09-26 Lost Circulation 1736.00 1736.00
1995-10-04 Lost Circulation 1964.00 2008.00
1995-10-07 Lost Circulation 2053.00 2053.00
1995-10-12 Lost Circulation 2177.00 2185.00
1996-01-30 Lost Circulation 4838.00 4838.00

For data sources see[7]

References