X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465171305002

Well Details

Well ID: 0465171305002
Loading map...
Location: 00/05-13-046-17W5/2
Location Alias: 00/05-13-46-17 W5M
Location Alias 2: 00/05-13-046-17 W5/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 17
Section: 13
County/Municipality: Yellowhead County
Well Name: Canlin HANLAN 4-13-46-17
Operator Name: Canlin Energy Corporation
License Number: 0154946
License Date: 1992-12-03
License Status: Suspension
Spud Date: 1992-12-10
Final Drill Date: 1997-10-25
Well Total Depth: 4893.00 m
Surface Hole Latitude: 52.962547
Surface Hole Longitude: -116.342066

For data sources see[1][2]

Well History

Date Event
1992-12-03 Obtained License
1992-12-17 Surface Casing Operation Performed
1993-03-01 Intermediate Casing Operation Performed
1993-04-21 Liner Casing Operation Performed
1997-09-28 Direction Drilling Operation Performed - Horizontal
1997-10-07 Well Log Performed
1997-10-25 Finished Drilling
1997-10-25 Well Log Performed
1997-10-25 Well Mode changed to Drilled and Cased
1997-10-27 Liner Casing Operation Performed
1997-10-27 Perforation Treatment Performed - Open-Hole Completion
1997-10-27 Perforation Treatment Performed - Slotted Liner or Casing
1997-11-04 Rig Released
1997-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-01 Well Began Production
1997-12-01 Well Fluid changed to Gas
1997-12-01 Well Mode changed to Flowing
1997-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-10 Well Log Performed
1998-03-12 Well Log Performed
1998-03-19 Well Log Performed
1998-07-09 Well Log Performed
2003-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-09 Plug Back Performed
2003-09-09 Well Fluid changed to Gas
2003-09-09 Well Mode changed to Abandoned Zone
2003-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-13 Plug Back Performed
2003-09-13 Well Log Performed
2003-09-22 Perforation Treatment Performed - Jet Perforation
2003-09-22 Well Log Performed
2003-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-28 Plug Back Performed
2003-09-28 Well Log Performed
2003-09-30 Well Log Performed
2003-10-01 Perforation Treatment Performed - Jet Perforation
2003-10-03 Perforation Treatment Performed - Fractured
2003-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-09 Plug Back Performed
2003-10-09 Well Log Performed
2003-12-20 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-28 4605.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-27 Slotted Liner 4067.50 4782.60 0
2003-09-23 Acid Treatment 2887.00 2890.00 0
2003-09-28 Packing Device Capped w/Cement 2874.80 2883.00 0
2003-10-01 Perforation 2772.00 2778.00 17
2003-10-03 Fracture 2772.00 2778.00 0
2003-10-09 Packing Device Capped w/Cement 2760.00 2768.00 0
1997-10-27 Open Hole/Barefoot Completion 4782.60 4893.00 0
1997-11-27 Acid Treatment 4782.60 4893.00 0
1997-12-17 Acid Treatment 4782.60 4893.00 0
1998-01-11 Acid Treatment 4782.60 4893.00 0
2003-09-09 Packing Device Capped w/Cement 4595.00 4755.00 0
2003-09-13 Packing Device Capped w/Cement 4022.00 4030.00 0
2003-09-13 Packing Device Capped w/Cement 3322.00 3330.00 0
2003-09-22 Perforation 2887.00 2890.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 208 0.0 0.0 0.0
1998 2201 0.0 0.0 0.0
1999 4195 0.0 0.0 0.0
2000 1972 0.0 0.0 0.0
2001 7209 0.0 0.0 0.0
2002 410 0.0 0.0 0.0

For data sources see[6]

References