X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465152916000

Well Details

Well ID: 0465152916000
Loading map...
Location: 00/16-29-046-15W5/0
Location Alias: 00/16-29-46-15 W5M
Location Alias 2: 00/16-29-046-15 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 15
Section: 29
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ PECO 16-29-46-15
Operator Name: Tourmaline Oil Corp.
License Number: 0494814
License Date: 2019-06-11
License Status: Amended
Spud Date: 2019-12-27
Final Drill Date: 2020-01-12
Well Total Depth: 4450.00 m
Surface Hole Latitude: 52.990218
Surface Hole Longitude: -116.138807

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-12-27 154.40 Deviate (5 - 79 degrees)
2020-01-09 3064.50 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-28 Multi-Stage Fracture 4390.20 4390.30 0
2020-01-28 Multi-Stage Fracture 3929.20 3929.30 0
2020-01-28 Multi-Stage Fracture 3877.50 3877.60 0
2020-01-28 Multi-Stage Fracture 3824.90 3825.00 0
2020-01-28 Multi-Stage Fracture 3772.70 3772.80 0
2020-01-28 Multi-Stage Fracture 3720.00 3720.10 0
2020-01-28 Multi-Stage Fracture 3667.40 3667.50 0
2020-01-28 Multi-Stage Fracture 3614.80 3614.90 0
2020-01-28 Multi-Stage Fracture 3562.00 3562.10 0
2020-01-28 Multi-Stage Fracture 3509.00 3509.10 0
2020-01-28 Multi-Stage Fracture 3457.30 3457.40 0
2020-01-28 Multi-Stage Fracture 4348.70 4348.80 0
2020-01-28 Multi-Stage Fracture 3404.60 3404.70 0
2020-01-28 Multi-Stage Fracture 3351.70 3351.80 0
2020-01-28 Multi-Stage Fracture 3298.80 3298.90 0
2020-01-28 Multi-Stage Fracture 3247.40 3247.50 0
2020-01-28 Multi-Stage Fracture 3196.10 3196.20 0
2020-01-28 Multi-Stage Fracture 3143.70 3143.80 0
2020-01-28 Multi-Stage Fracture 3104.20 3104.30 0
2020-01-28 Multi-Stage Fracture 3065.30 3065.40 0
2020-01-28 Multi-Stage Fracture 4296.40 4296.50 0
2020-01-28 Multi-Stage Fracture 4243.60 4243.70 0
2020-01-28 Multi-Stage Fracture 4191.60 4191.70 0
2020-01-28 Multi-Stage Fracture 4139.00 4139.10 0
2020-01-28 Multi-Stage Fracture 4086.40 4086.50 0
2020-01-28 Multi-Stage Fracture 4034.00 4034.10 0
2020-01-28 Multi-Stage Fracture 3981.30 3981.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1257 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-27 Lost Circulation 230.00 230.00
2020-02-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References