X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465131810002

Well Details

Well ID: 0465131810002
Loading map...
Location: 00/10-18-046-13W5/2
Location Alias: 00/10-18-46-13 W5M
Location Alias 2: 00/10-18-046-13 W5/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 13
Section: 18
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 10-18-46-13
Operator Name: Cenovus Energy Inc.
License Number: 0029715
License Date: 1965-12-30
License Status: Issued
Spud Date: 1966-01-08
Final Drill Date: 1966-02-25
Well Total Depth: 3099.80 m
Surface Hole Latitude: 52.968937
Surface Hole Longitude: -115.872287

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-30 Obtained License
1966-02-05 Drill Stem Test Performed
1966-02-09 Drill Stem Test Performed
1966-02-20 Drill Stem Test Performed
1966-02-22 Drill Stem Test Performed
1966-02-25 Finished Drilling
1966-03-01 Production Casing Operation Performed
1966-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-06 Perforation Treatment Performed - Jet Perforation
1966-03-06 Perforation Treatment Performed - Nitrogen Treatment
1966-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-10 Perforation Treatment Performed - Jet Perforation
1966-03-10 Perforation Treatment Performed - Nitrogen Treatment
1966-03-12 Perforation Treatment Performed - Nitrogen Treatment
1966-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-14 Perforation Treatment Performed - Nitrogen Treatment
1966-03-15 Perforation Treatment Performed - Cement Squeeze
1966-03-18 Perforation Treatment Performed - Cement Squeeze
1967-03-28 Perforation Treatment Performed - Cement Squeeze
1967-04-06 Perforation Treatment Performed - Jet Perforation
1967-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-10 Well Mode changed to Drilled and Cased
1969-01-16 Well Began Production
1969-01-16 Well Fluid changed to Gas
1969-01-16 Well Mode changed to Flowing
1986-09-02 Well Fluid changed to Gas
1986-09-02 Well Mode changed to Suspended
1987-01-29 Well Fluid changed to Gas
1987-01-29 Well Mode changed to Flowing
1989-03-01 Perforation Treatment Performed - Jet Perforation
1989-03-01 Well Fluid changed to Gas
1989-03-01 Well Mode changed to Flowing
2002-12-12 Well Log Performed
2002-12-14 Well Log Performed
2002-12-19 Well Log Performed
2003-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-05 Plug Back Performed
2003-01-05 Well Fluid changed to Gas
2003-01-05 Well Log Performed
2003-01-05 Well Mode changed to Abandoned Zone
2003-01-11 Perforation Treatment Performed - Cement Squeeze
2003-01-11 Plug Back Performed
2003-01-16 Perforation Treatment Performed - Jet Perforation
2003-01-16 Well Log Performed
2003-01-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-03-06 Perforation 2943.10 2944.40 7
1966-03-10 Acid Treatment 2924.90 2927.90 0
1966-03-10 Perforation 2901.40 2906.90 7
1966-03-12 Nitrogen Treatment 2901.40 2906.90 0
1966-03-13 Acid Treatment 2901.40 2906.90 0
1966-03-14 Acid Treatment 2901.40 2906.90 0
1966-03-14 Nitrogen Treatment 2901.40 2906.90 0
1966-03-15 Cement Squeeze 2901.40 2906.90 0
1966-03-18 Cement Squeeze 2924.90 2927.90 0
1967-03-28 Cement Squeeze 2943.10 2957.80 0
1967-04-06 Perforation 3023.30 3029.10 7
1966-03-06 Perforation 2946.80 2948.60 7
1967-04-06 Perforation 3031.80 3033.70 7
1967-04-06 Perforation 3035.80 3038.20 7
1967-04-06 Perforation 3016.60 3017.20 7
1967-04-06 Perforation 3017.80 3018.70 7
1967-04-06 Perforation 3019.30 3020.30 7
1967-04-06 Perforation 3021.80 3022.40 7
1967-04-10 Acid Treatment 3016.60 3038.20 0
1989-03-01 Perforation 2901.40 2906.90 7
2003-01-05 Packing Device Capped w/Cement 2990.00 2998.30 0
2003-01-11 Cement Squeeze 2901.40 2906.90 0
1966-03-06 Perforation 2949.90 2951.70 7
2003-01-16 Perforation 2956.50 2959.00 20
2003-01-16 Perforation 2947.50 2950.00 17
2003-01-19 Fracture 2947.50 2959.00 0
1966-03-06 Perforation 2952.90 2954.10 7
1966-03-06 Perforation 2956.00 2957.80 7
1966-03-06 Acid Treatment 2943.10 2957.80 0
1966-03-06 Nitrogen Treatment 2943.10 2957.80 0
1966-03-10 Perforation 2924.90 2927.90 7
1966-03-10 Nitrogen Treatment 2924.90 2927.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 6442 0.0 0.0 0.0
1970 7925 0.0 0.0 0.0
1971 7520 0.0 0.0 0.0
1972 7725 0.0 0.0 0.0
1973 7613 0.0 0.0 0.0
1974 7909 0.0 0.0 0.0
1975 7457 0.0 0.0 0.0
1976 5307 0.0 0.0 0.0
1977 5066 0.0 0.0 0.0
1978 3160 0.0 0.0 0.0
1979 3435 0.0 0.0 0.0
1980 3585 0.0 0.0 0.0
1981 5729 0.0 0.0 0.0
1982 5345 0.0 0.0 0.0
1983 3864 0.0 0.0 0.0
1984 4524 0.0 0.0 0.0
1985 5673 0.0 0.0 0.0
1986 3226 0.0 0.0 0.0
1987 3434 0.0 0.0 0.0
1988 3619 0.0 0.0 0.0
1989 8202 0.0 0.0 0.0
1990 5404 0.0 0.0 0.0
1991 1799 0.0 0.0 0.0
1992 7792 0.0 0.0 0.0
1993 8222 0.0 0.0 0.0
1994 8617 0.0 0.0 0.0
1995 3550 0.0 0.0 0.0
1996 2916 0.0 0.0 0.0
1997 7243 0.0 0.0 0.0
1998 8497 0.0 0.0 0.0
1999 8377 0.0 0.0 0.0
2000 8242 0.0 0.0 0.0
2001 8487 0.0 0.0 0.0
2002 4378 0.0 0.0 0.0

For data sources see[5]

References