X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465122501000

Well Details

Well ID: 0465122501000
Loading map...
Location: 00/01-25-046-12W5/0
Location Alias: 00/01-25-46-12 W5M
Location Alias 2: 00/01-25-046-12 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 12
Section: 25
County/Municipality: Brazeau County
Well Name: SDEL HZ BRAZR 1-25-46-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0450036
License Date: 2012-11-14
License Status: Issued
Spud Date: 2012-11-26
Final Drill Date: 2012-12-08
Well Total Depth: 3597.00 m
Surface Hole Latitude: 53.006412
Surface Hole Longitude: -115.597345

For data sources see[1][2]

Well History

Date Event
2012-11-14 Obtained License
2012-11-28 Surface Casing Operation Performed
2012-11-30 Direction Drilling Operation Performed - Deviate
2012-12-03 Direction Drilling Operation Performed - Horizontal
2012-12-03 Well Log Performed
2012-12-08 Finished Drilling
2012-12-08 Well Log Performed
2012-12-08 Well Mode changed to Drilled and Cased
2012-12-10 Production Casing Operation Performed
2012-12-10 Rig Released
2013-02-20 Well Log Performed
2013-03-14 Well Began Production
2013-03-14 Well Fluid changed to Crude Oil
2013-03-14 Well Mode changed to Flowing
2013-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-15 Perforation Treatment Performed - Open-Hole Completion
2013-03-16 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-26 Precision Drilling Corporation 526 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-30 1498.00 Deviate (5 - 79 degrees)
2012-12-03 2238.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-15 Open Hole/Barefoot Completion 3591.00 3597.00 0
2013-03-16 Multi-Stage Fracture 2988.90 2989.00 0
2013-03-16 Multi-Stage Fracture 2916.30 2916.40 0
2013-03-16 Multi-Stage Fracture 2843.10 2843.20 0
2013-03-16 Multi-Stage Fracture 2770.00 2770.10 0
2013-03-16 Multi-Stage Fracture 2697.10 2697.20 0
2013-03-16 Multi-Stage Fracture 2624.20 2624.30 0
2013-03-16 Multi-Stage Fracture 2551.00 2551.10 0
2013-03-16 Multi-Stage Fracture 2478.10 2478.20 0
2013-03-16 Multi-Stage Fracture 2405.00 2405.10 0
2013-03-16 Multi-Stage Fracture 2332.00 2332.10 0
2013-03-15 Multi-Stage Fracture 3559.80 3559.90 0
2013-03-16 Multi-Stage Fracture 2259.20 2259.30 0
2013-03-15 Multi-Stage Fracture 3488.10 3488.20 0
2013-03-15 Multi-Stage Fracture 3415.20 3415.30 0
2013-03-16 Multi-Stage Fracture 3342.00 3342.10 0
2013-03-16 Multi-Stage Fracture 3269.40 3269.50 0
2013-03-16 Multi-Stage Fracture 3196.70 3196.80 0
2013-03-16 Multi-Stage Fracture 3123.60 3123.70 0
2013-03-16 Multi-Stage Fracture 3061.80 3061.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-15 2013-03-16 2,044 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 84.4581 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 10.8377 N/A
Crystalline silica. quartz 14808-60-7 100 10.8377 N/A
Iron Oxide 1309-37-1 100 10.8378 N/A
Titanium Oxide 13463-67-7 100 10.8377 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 1.1776 N/A
Crystalline silica. quartz 14808-60-7 100 1.1776 N/A
Iron Oxide 1309-37-1 100 1.1777 N/A
Titanium Oxide 13463-67-7 100 1.1777 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Non-hazardous base ingredient(s) Not Available 100 0.0243 N/A
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0243 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.183 N/A
Non-hazardous base ingredient(s) Not Available 100 0.183 N/A
Nitrogen Gas Third Party Energizing Fluid Nitrogen 7727-37-9 100 3.1491 N/A
Non-hazardous base ingredient(s) Not Available 100 3.149 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0902 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0902 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0902 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0795 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0795 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-10 2013-03-16 Surface Water - River 2682

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6092 0.0 0.0 0.0
2014 8697 0.0 0.0 0.0
2015 8505 0.0 0.0 0.0
2016 8745 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8339 0.0 0.0 0.0
2019 8616 0.0 0.0 0.0
2020 2080 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-10 No Incident Encountered 0.00 0.00
2013-04-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References