If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465121107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.933013,"lon":-115.629973,"icon":""}]} |
Location: 00/07-11-046-12W5/0 | |
Location Alias: 00/07-11-46-12 W5M | |
Location Alias 2: 00/07-11-046-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 12 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 7-11-46-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0431079 | |
License Date: 2011-02-02 | |
License Status: Issued | |
Spud Date: 2011-02-17 | |
Final Drill Date: 2011-03-05 | |
Well Total Depth: 4025.00 m | |
Surface Hole Latitude: 52.933013 | |
Surface Hole Longitude: -115.629973 |
Date | Event |
---|---|
2010-02-19 | Surface Casing Operation Performed |
2011-02-02 | Obtained License |
2011-02-20 | Well Log Performed |
2011-02-22 | Direction Drilling Operation Performed - Horizontal |
2011-03-05 | Finished Drilling |
2011-03-05 | Well Log Performed |
2011-03-05 | Well Mode changed to Drilled and Cased |
2011-03-08 | Perforation Treatment Performed - Open-Hole Completion |
2011-03-08 | Production Casing Operation Performed |
2011-03-08 | Rig Released |
2011-07-16 | Well Log Performed |
2011-08-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-12 | Well Began Production |
2011-08-12 | Well Fluid changed to Crude Oil |
2011-08-12 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-22 | 1753.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-08 | Open Hole/Barefoot Completion | 4020.00 | 4025.00 | 0 |
2011-08-09 | Multi-Stage Fracture | 3406.90 | 3407.00 | 0 |
2011-08-09 | Multi-Stage Fracture | 3335.50 | 3335.60 | 0 |
2011-08-09 | Multi-Stage Fracture | 3254.30 | 3254.40 | 0 |
2011-08-10 | Multi-Stage Fracture | 3184.40 | 3184.50 | 0 |
2011-08-10 | Multi-Stage Fracture | 3115.60 | 3115.70 | 0 |
2011-08-10 | Multi-Stage Fracture | 3044.20 | 3044.30 | 0 |
2011-08-10 | Multi-Stage Fracture | 2972.50 | 2972.60 | 0 |
2011-08-10 | Multi-Stage Fracture | 2890.60 | 2890.70 | 0 |
2011-08-10 | Multi-Stage Fracture | 2818.90 | 2819.00 | 0 |
2011-08-10 | Multi-Stage Fracture | 2747.20 | 2747.30 | 0 |
2011-08-09 | Multi-Stage Fracture | 3981.10 | 3981.20 | 0 |
2011-08-10 | Multi-Stage Fracture | 2675.50 | 2675.60 | 0 |
2011-08-10 | Multi-Stage Fracture | 2602.90 | 2603.00 | 0 |
2011-08-10 | Multi-Stage Fracture | 2531.20 | 2531.30 | 0 |
2011-08-10 | Multi-Stage Fracture | 2458.50 | 2458.60 | 0 |
2011-08-10 | Multi-Stage Fracture | 2388.60 | 2388.70 | 0 |
2011-08-10 | Multi-Stage Fracture | 2315.80 | 2315.90 | 0 |
2011-08-09 | Multi-Stage Fracture | 3914.30 | 3914.40 | 0 |
2011-08-09 | Multi-Stage Fracture | 3840.70 | 3840.80 | 0 |
2011-08-09 | Multi-Stage Fracture | 3767.10 | 3767.20 | 0 |
2011-08-09 | Multi-Stage Fracture | 3693.20 | 3693.30 | 0 |
2011-08-09 | Multi-Stage Fracture | 3633.60 | 3633.70 | 0 |
2011-08-09 | Multi-Stage Fracture | 3547.30 | 3547.40 | 0 |
2011-08-09 | Multi-Stage Fracture | 3478.80 | 3478.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1471 | 0.0 | 0.0 | 0.0 |
2012 | 7855 | 0.0 | 0.0 | 0.0 |
2013 | 8428 | 0.0 | 0.0 | 0.0 |
2014 | 8620 | 0.0 | 0.0 | 0.0 |
2015 | 8547 | 0.0 | 0.0 | 0.0 |
2016 | 8513 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8213 | 0.0 | 0.0 | 0.0 |
2019 | 7331 | 0.0 | 0.0 | 0.0 |
2020 | 1937 | 0.0 | 0.0 | 0.0 |
For data sources see[6]