X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465113115000

Well Details

Well ID: 0465113115000
Loading map...
Location: 00/15-31-046-11W5/0
Location Alias: 00/15-31-46-11 W5M
Location Alias 2: 00/15-31-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 31
County/Municipality: Brazeau County
Well Name: SDEL HZ BRAZR 15-31-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0443227
License Date: 2012-01-24
License Status: Issued
Spud Date: 2012-02-28
Final Drill Date: 2012-03-10
Well Total Depth: 3555.00 m
Surface Hole Latitude: 53.001305
Surface Hole Longitude: -115.580559

For data sources see[1][2]

Well History

Date Event
2012-01-24 Obtained License
2012-02-27 Well Log Performed
2012-02-28 Lost Circulation Occurred
2012-03-01 Surface Casing Operation Performed
2012-03-02 Direction Drilling Operation Performed - Horizontal
2012-03-05 Well Log Performed
2012-03-10 Finished Drilling
2012-03-10 Well Log Performed
2012-03-10 Well Mode changed to Drilled and Cased
2012-03-12 Production Casing Operation Performed
2012-03-12 Rig Released
2012-04-12 Well Log Performed
2012-04-18 Well Began Production
2012-04-18 Well Fluid changed to Crude Oil
2012-04-18 Well Log Performed
2012-04-18 Well Mode changed to Pumping
2012-04-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-23 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-28 Nabors Drilling Limited 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-02 1570.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-23 Open Hole/Barefoot Completion 3553.20 3555.00 0
2012-04-23 Multi-Stage Fracture 2979.90 2980.00 0
2012-04-23 Multi-Stage Fracture 2906.30 2906.40 0
2012-04-23 Multi-Stage Fracture 2844.80 2844.90 0
2012-04-23 Multi-Stage Fracture 2770.90 2771.00 0
2012-04-23 Multi-Stage Fracture 2707.90 2708.00 0
2012-04-23 Multi-Stage Fracture 2634.60 2634.70 0
2012-04-23 Multi-Stage Fracture 2571.70 2571.80 0
2012-04-23 Multi-Stage Fracture 2498.60 2498.70 0
2012-04-23 Multi-Stage Fracture 2436.60 2436.70 0
2012-04-23 Multi-Stage Fracture 2363.20 2363.30 0
2012-04-23 Multi-Stage Fracture 3526.60 3526.70 0
2012-04-23 Multi-Stage Fracture 2301.10 2301.20 0
2012-04-23 Multi-Stage Fracture 3457.30 3457.40 0
2012-04-23 Multi-Stage Fracture 3385.50 3385.60 0
2012-04-23 Multi-Stage Fracture 3322.60 3322.70 0
2012-04-23 Multi-Stage Fracture 3249.80 3249.90 0
2012-04-23 Multi-Stage Fracture 3178.00 3178.10 0
2012-04-23 Multi-Stage Fracture 3115.20 3115.30 0
2012-04-23 Multi-Stage Fracture 3042.00 3042.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5572 0.0 0.0 0.0
2013 8148 0.0 0.0 0.0
2014 8753 0.0 0.0 0.0
2015 8641 0.0 0.0 0.0
2016 7846 0.0 0.0 0.0
2017 7890 0.0 0.0 0.0
2018 8389 0.0 0.0 0.0
2019 8056 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-28 Lost Circulation 112.00 616.00
2012-05-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References