X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465113004020

Well Details

Well ID: 0465113004020
Loading map...
Location: 02/04-30-046-11W5/0
Location Alias: 02/04-30-46-11 W5M
Location Alias 2: 02/04-30-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 30
County/Municipality: Brazeau County
Well Name: SDEL 102 HZ BRAZR 4-30-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0450233
License Date: 2012-11-19
License Status: Suspension
Spud Date: 2013-01-19
Final Drill Date: 2013-01-31
Well Total Depth: 3565.00 m
Surface Hole Latitude: 53.006369
Surface Hole Longitude: -115.597081

For data sources see[1][2]

Well History

Date Event
2012-11-19 Obtained License
2013-01-21 Surface Casing Operation Performed
2013-01-22 Direction Drilling Operation Performed - Deviate
2013-01-27 Direction Drilling Operation Performed - Horizontal
2013-01-27 Well Log Performed
2013-01-31 Finished Drilling
2013-01-31 Well Log Performed
2013-01-31 Well Mode changed to Drilled and Cased
2013-02-03 Production Casing Operation Performed
2013-02-03 Rig Released
2013-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-14 Well Began Production
2013-03-14 Well Fluid changed to Crude Oil
2013-03-14 Well Mode changed to Flowing
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-19 Precision Drilling Corporation 148 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-22 687.00 Deviate (5 - 79 degrees)
2013-01-27 2249.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-14 Multi-Stage Fracture 3550.70 3550.80 0
2013-03-14 Multi-Stage Fracture 3152.40 3152.50 0
2013-03-14 Multi-Stage Fracture 3103.00 3103.10 0
2013-03-14 Multi-Stage Fracture 3064.50 3064.60 0
2013-03-14 Multi-Stage Fracture 3014.80 3014.90 0
2013-03-14 Multi-Stage Fracture 2975.40 2975.50 0
2013-03-14 Multi-Stage Fracture 2926.00 2926.10 0
2013-03-14 Multi-Stage Fracture 2887.70 2887.80 0
2013-03-14 Multi-Stage Fracture 2848.60 2848.70 0
2013-03-14 Multi-Stage Fracture 2798.30 2798.40 0
2013-03-14 Multi-Stage Fracture 2760.00 2760.10 0
2013-03-14 Multi-Stage Fracture 3494.00 3494.10 0
2013-03-14 Multi-Stage Fracture 2710.00 2710.10 0
2013-03-14 Multi-Stage Fracture 2671.50 2671.60 0
2013-03-14 Multi-Stage Fracture 2621.60 2621.70 0
2013-03-14 Multi-Stage Fracture 2583.20 2583.30 0
2013-03-14 Multi-Stage Fracture 2532.90 2533.00 0
2013-03-14 Multi-Stage Fracture 2493.90 2494.00 0
2013-03-14 Multi-Stage Fracture 2455.20 2455.30 0
2013-03-14 Multi-Stage Fracture 2405.60 2405.70 0
2013-03-14 Multi-Stage Fracture 2367.00 2367.10 0
2013-03-14 Multi-Stage Fracture 2317.30 2317.40 0
2013-03-14 Multi-Stage Fracture 3455.70 3455.80 0
2013-03-14 Multi-Stage Fracture 2279.10 2279.20 0
2013-03-14 Multi-Stage Fracture 3417.30 3417.40 0
2013-03-14 Multi-Stage Fracture 3367.50 3367.60 0
2013-03-14 Multi-Stage Fracture 3329.10 3329.20 0
2013-03-14 Multi-Stage Fracture 3279.60 3279.70 0
2013-03-14 Multi-Stage Fracture 3241.00 3241.10 0
2013-03-14 Multi-Stage Fracture 3190.90 3191.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-14 2013-03-14 2,032 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 90.1121 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 8.5129 N/A
Crystalline silica. quartz 14808-60-7 100 8.5128 N/A
Iron Oxide 1309-37-1 100 8.5129 N/A
Titanium Oxide 13463-67-7 100 8.5133 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 0.9458 N/A
Crystalline silica. quartz 14808-60-7 100 0.9458 N/A
Iron Oxide 1309-37-1 100 0.9459 N/A
Titanium Oxide 13463-67-7 100 0.9455 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Non-hazardous base ingredient(s) Not Available 100 0.0257 N/A
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0257 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1966 N/A
Non-hazardous base ingredient(s) Not Available 100 0.1966 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 0.0019 N/A
Non-hazardous base ingredient(s) Not Available 100 0.002 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.1126 N/A
Hydrotreated Kerosene 64742-47-8 100 0.1125 N/A
Non-hazardous base ingredient(s) Not Available 100 0.1125 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0921 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0921 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-10 2013-03-14 Surface Water - River 5716

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5767 0.0 0.0 0.0
2014 8463 0.0 0.0 0.0
2015 2573 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-03 No Incident Encountered 0.00 0.00
2013-04-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References