X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465113003000

Well Details

Well ID: 0465113003000
Loading map...
Location: 00/03-30-046-11W5/0
Location Alias: 00/03-30-46-11 W5M
Location Alias 2: 00/03-30-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 30
County/Municipality: Brazeau County
Well Name: SDEL HZ BRAZR 3-30-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0450037
License Date: 2012-11-14
License Status: Issued
Spud Date: 2012-12-01
Final Drill Date: 2012-12-14
Well Total Depth: 3725.00 m
Surface Hole Latitude: 53.006238
Surface Hole Longitude: -115.596307

For data sources see[1][2]

Well History

Date Event
2012-11-14 Obtained License
2012-12-03 Surface Casing Operation Performed
2012-12-05 Direction Drilling Operation Performed - Deviate
2012-12-09 Direction Drilling Operation Performed - Horizontal
2012-12-14 Finished Drilling
2012-12-14 Well Log Performed
2012-12-14 Well Mode changed to Drilled and Cased
2012-12-15 Well Log Performed
2012-12-17 Production Casing Operation Performed
2012-12-17 Rig Released
2013-03-14 Well Began Production
2013-03-14 Well Fluid changed to Crude Oil
2013-03-14 Well Mode changed to Flowing
2013-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-16 Perforation Treatment Performed - Open-Hole Completion
2013-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-01 Well Fluid changed to Crude Oil
2016-12-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-01 Precision Drilling Corporation 148 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-05 1145.00 Deviate (5 - 79 degrees)
2012-12-09 2414.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-16 Open Hole/Barefoot Completion 3723.00 3725.00 0
2013-03-16 Multi-Stage Fracture 3134.70 3134.80 0
2013-03-16 Multi-Stage Fracture 3073.20 3073.30 0
2013-03-16 Multi-Stage Fracture 3000.60 3000.70 0
2013-03-16 Multi-Stage Fracture 2927.70 2927.80 0
2013-03-17 Multi-Stage Fracture 2866.90 2867.00 0
2013-03-17 Multi-Stage Fracture 2794.20 2794.30 0
2013-03-17 Multi-Stage Fracture 2721.70 2721.80 0
2013-03-17 Multi-Stage Fracture 2660.00 2660.10 0
2013-03-17 Multi-Stage Fracture 2587.20 2587.30 0
2013-03-17 Multi-Stage Fracture 2514.50 2514.60 0
2013-03-16 Multi-Stage Fracture 3689.20 3689.30 0
2013-03-17 Multi-Stage Fracture 2452.80 2452.90 0
2013-03-16 Multi-Stage Fracture 3621.30 3621.40 0
2013-03-16 Multi-Stage Fracture 3548.40 3548.50 0
2013-03-16 Multi-Stage Fracture 3486.90 3487.00 0
2013-03-16 Multi-Stage Fracture 3414.60 3414.70 0
2013-03-16 Multi-Stage Fracture 3341.80 3341.90 0
2013-03-16 Multi-Stage Fracture 3280.10 3280.20 0
2013-03-16 Multi-Stage Fracture 3207.50 3207.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-16 2013-03-17 2,021 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 83.9666 N/A
LWP? (16/30) Canyon Copolymer of styrene divinylbenzene 9052-95-3 100 0.0002 N/A
Styrene Monomer 100-42-5 100 0.0003 N/A
Water 7732-18-5 100 0.0003 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 9.3928 N/A
Crystalline silica. quartz 14808-60-7 100 9.3927 N/A
Iron Oxide 1309-37-1 100 9.3928 N/A
Titanium Oxide 13463-67-7 100 9.3933 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 1.0436 N/A
Crystalline silica. quartz 14808-60-7 100 1.0436 N/A
Iron Oxide 1309-37-1 100 1.0436 N/A
Titanium Oxide 13463-67-7 100 1.0433 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Non-hazardous base ingredient(s) Not Available 100 0.0288 N/A
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0288 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1914 N/A
Non-hazardous base ingredient(s) Not Available 100 0.1914 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 5.1948 N/A
Non-hazardous base ingredient(s) Not Available 100 5.195 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0968 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0968 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0968 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0845 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0845 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-10 2013-03-17 Surface Water - River 2589
2013-03-10 2013-03-17 Recycled Fracturing Water (treated at well site) 468

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5706 0.0 0.0 0.0
2014 8673 0.0 0.0 0.0
2015 7380 0.0 0.0 0.0
2016 5978 0.0 0.0 0.0
2017 8648 0.0 0.0 0.0
2018 1714 0.0 0.0 0.0
2019 7490 0.0 0.0 0.0
2020 1480 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-17 No Incident Encountered 0.00 0.00
2013-04-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References