X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465112813000

Well Details

Well ID: 0465112813000
Loading map...
Location: 00/13-28-046-11W5/0
Location Alias: 00/13-28-46-11 W5M
Location Alias 2: 00/13-28-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 28
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ BRAZR 13-28-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0441423
License Date: 2011-12-15
License Status: Amended
Spud Date: 2012-03-21
Final Drill Date: 2012-03-30
Well Total Depth: 3464.00 m
Surface Hole Latitude: 53.000737
Surface Hole Longitude: -115.523437

For data sources see[1][2]

Well History

Date Event
2011-12-15 Obtained License
2012-03-21 Lost Circulation Occurred
2012-03-22 Surface Casing Operation Performed
2012-03-23 Well Log Performed
2012-03-24 Direction Drilling Operation Performed - Deviate
2012-03-26 Direction Drilling Operation Performed - Horizontal
2012-03-26 Well Log Performed
2012-03-30 Finished Drilling
2012-03-30 Well Log Performed
2012-03-30 Well Mode changed to Drilled and Cased
2012-03-31 Well Log Performed
2012-04-01 Production Casing Operation Performed
2012-04-01 Rig Released
2012-04-30 Well Log Performed
2012-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-12 Perforation Treatment Performed - Open-Hole Completion
2012-05-12 Well Began Production
2012-05-12 Well Fluid changed to Crude Oil
2012-05-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-21 Nabors Drilling Limited 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-24 1610.00 Deviate (5 - 79 degrees)
2012-03-26 2105.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-12 Open Hole/Barefoot Completion 3459.00 3464.00 0
2012-05-12 Multi-Stage Fracture 2865.10 2865.20 0
2012-05-12 Multi-Stage Fracture 2796.10 2796.20 0
2012-05-12 Multi-Stage Fracture 2727.90 2728.00 0
2012-05-12 Multi-Stage Fracture 2659.20 2659.30 0
2012-05-12 Multi-Stage Fracture 2590.30 2590.40 0
2012-05-12 Multi-Stage Fracture 2521.20 2521.30 0
2012-05-12 Multi-Stage Fracture 2452.30 2452.40 0
2012-05-12 Multi-Stage Fracture 2383.20 2383.30 0
2012-05-12 Multi-Stage Fracture 2314.10 2314.20 0
2012-05-12 Multi-Stage Fracture 2233.80 2233.90 0
2012-05-12 Multi-Stage Fracture 3434.90 3435.00 0
2012-05-12 Multi-Stage Fracture 2177.50 2177.60 0
2012-05-12 Multi-Stage Fracture 3359.10 3359.20 0
2012-05-12 Multi-Stage Fracture 3290.10 3290.20 0
2012-05-12 Multi-Stage Fracture 3221.20 3221.30 0
2012-05-12 Multi-Stage Fracture 3153.00 3153.10 0
2012-05-12 Multi-Stage Fracture 3084.00 3084.10 0
2012-05-12 Multi-Stage Fracture 3003.00 3003.10 0
2012-05-12 Multi-Stage Fracture 2934.00 2934.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4278 0.0 0.0 0.0
2013 7975 0.0 0.0 0.0
2014 8504 0.0 0.0 0.0
2015 8015 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 8420 0.0 0.0 0.0
2019 5712 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-21 Lost Circulation 550.00 610.00
2012-05-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References