X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465103414000

Well Details

Well ID: 0465103414000
Loading map...
Location: 00/14-34-046-10W5/0
Location Alias: 00/14-34-46-10 W5M
Location Alias 2: 00/14-34-046-10 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 10
Section: 34
County/Municipality: Brazeau County
Well Name: TAC 16-22 HZ PEMBINA 14-34-46-10
Operator Name: Tamarack Acquisition Corp.
License Number: 0494488
License Date: 2019-05-15
License Status: Amended
Spud Date: 2019-06-12
Final Drill Date: 2019-06-28
Well Total Depth: 5573.00 m
Surface Hole Latitude: 52.988000
Surface Hole Longitude: -115.360149

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-12 Twilight Drilling Ltd. 2 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-06-16 1496.90 Deviate (5 - 79 degrees)
2019-06-17 2076.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-24 Multi-Stage Fracture 5164.90 5165.00 0
2019-08-25 Multi-Stage Fracture 4749.80 4749.90 0
2019-08-25 Multi-Stage Fracture 4703.30 4703.40 0
2019-08-25 Multi-Stage Fracture 4656.00 4656.10 0
2019-08-25 Multi-Stage Fracture 4608.80 4608.90 0
2019-08-25 Multi-Stage Fracture 4563.50 4563.60 0
2019-08-25 Multi-Stage Fracture 4517.10 4517.20 0
2019-08-25 Multi-Stage Fracture 4470.50 4470.60 0
2019-08-25 Multi-Stage Fracture 4423.60 4423.70 0
2019-08-25 Multi-Stage Fracture 4376.20 4376.30 0
2019-08-25 Multi-Stage Fracture 4329.10 4329.20 0
2019-08-24 Multi-Stage Fracture 5120.00 5120.10 0
2019-08-25 Multi-Stage Fracture 4282.10 4282.20 0
2019-08-25 Multi-Stage Fracture 4235.10 4235.20 0
2019-08-25 Multi-Stage Fracture 4189.70 4189.80 0
2019-08-25 Multi-Stage Fracture 4144.80 4144.90 0
2019-08-25 Multi-Stage Fracture 4098.70 4098.80 0
2019-08-25 Multi-Stage Fracture 4051.40 4051.50 0
2019-08-25 Multi-Stage Fracture 4005.30 4005.40 0
2019-08-25 Multi-Stage Fracture 3957.30 3957.40 0
2019-08-25 Multi-Stage Fracture 3909.50 3909.60 0
2019-08-25 Multi-Stage Fracture 3862.50 3862.60 0
2019-08-25 Multi-Stage Fracture 5074.40 5074.50 0
2019-08-25 Multi-Stage Fracture 3815.80 3815.90 0
2019-08-25 Multi-Stage Fracture 3768.50 3768.60 0
2019-08-26 Multi-Stage Fracture 3721.60 3721.70 0
2019-08-26 Multi-Stage Fracture 3674.00 3674.10 0
2019-08-26 Multi-Stage Fracture 3626.90 3627.00 0
2019-08-26 Multi-Stage Fracture 3580.40 3580.50 0
2019-08-26 Multi-Stage Fracture 3534.20 3534.30 0
2019-08-26 Multi-Stage Fracture 3487.80 3487.90 0
2019-08-26 Multi-Stage Fracture 3440.20 3440.30 0
2019-08-26 Multi-Stage Fracture 3393.80 3393.90 0
2019-08-25 Multi-Stage Fracture 5028.50 5028.60 0
2019-08-26 Multi-Stage Fracture 3347.70 3347.80 0
2019-08-26 Multi-Stage Fracture 3300.80 3300.90 0
2019-08-26 Multi-Stage Fracture 3254.90 3255.00 0
2019-08-26 Multi-Stage Fracture 3207.40 3207.50 0
2019-08-26 Multi-Stage Fracture 3160.00 3160.10 0
2019-08-26 Multi-Stage Fracture 3112.40 3112.50 0
2019-08-26 Multi-Stage Fracture 3066.80 3066.90 0
2019-08-26 Multi-Stage Fracture 3018.90 3019.00 0
2019-08-26 Multi-Stage Fracture 2973.20 2973.30 0
2019-08-26 Multi-Stage Fracture 2925.80 2925.90 0
2019-08-25 Multi-Stage Fracture 4983.40 4983.50 0
2019-08-26 Multi-Stage Fracture 2878.20 2878.30 0
2019-08-26 Multi-Stage Fracture 2832.30 2832.40 0
2019-08-26 Multi-Stage Fracture 2785.40 2785.50 0
2019-08-26 Multi-Stage Fracture 2737.60 2737.70 0
2019-08-27 Multi-Stage Fracture 2690.80 2690.90 0
2019-08-27 Multi-Stage Fracture 2646.00 2646.10 0
2019-08-27 Multi-Stage Fracture 2599.00 2599.10 0
2019-08-27 Multi-Stage Fracture 2551.40 2551.50 0
2019-08-25 Multi-Stage Fracture 4935.90 4936.00 0
2019-08-25 Multi-Stage Fracture 4889.00 4889.10 0
2019-08-25 Multi-Stage Fracture 4842.30 4842.40 0
2019-08-25 Multi-Stage Fracture 4795.50 4795.60 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-24 2019-08-27 1,866 8,550 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 95.3622 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 4.5589 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.243 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0097 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0097 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0733 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0733 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0764 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0764 N/A
ELEFE-4 IFTR Element Surfactant Alkylbenzenesulfonic acid Trade Secret 100 0.0922 N/A
Ethylene Glycol 107-21-1 100 0.0922 N/A
Isopropanol 67-63-0 100 0.0922 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0922 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-19 2019-08-29 Surface Water - Runoff 8550

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2435 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-30 No Incident Encountered 0.00 0.00
2019-08-26 No Incident Encountered 0.00 0.00

For data sources see[9]

References