If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465103414000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.988,"lon":-115.360149,"icon":""}]} |
Location: 00/14-34-046-10W5/0 | |
Location Alias: 00/14-34-46-10 W5M | |
Location Alias 2: 00/14-34-046-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 10 | |
Section: 34 | |
County/Municipality: Brazeau County | |
Well Name: TAC 16-22 HZ PEMBINA 14-34-46-10 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0494488 | |
License Date: 2019-05-15 | |
License Status: Amended | |
Spud Date: 2019-06-12 | |
Final Drill Date: 2019-06-28 | |
Well Total Depth: 5573.00 m | |
Surface Hole Latitude: 52.988000 | |
Surface Hole Longitude: -115.360149 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-06-12 | Twilight Drilling Ltd. | 2 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-06-16 | 1496.90 | Deviate (5 - 79 degrees) |
2019-06-17 | 2076.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-08-24 | Multi-Stage Fracture | 5164.90 | 5165.00 | 0 |
2019-08-25 | Multi-Stage Fracture | 4749.80 | 4749.90 | 0 |
2019-08-25 | Multi-Stage Fracture | 4703.30 | 4703.40 | 0 |
2019-08-25 | Multi-Stage Fracture | 4656.00 | 4656.10 | 0 |
2019-08-25 | Multi-Stage Fracture | 4608.80 | 4608.90 | 0 |
2019-08-25 | Multi-Stage Fracture | 4563.50 | 4563.60 | 0 |
2019-08-25 | Multi-Stage Fracture | 4517.10 | 4517.20 | 0 |
2019-08-25 | Multi-Stage Fracture | 4470.50 | 4470.60 | 0 |
2019-08-25 | Multi-Stage Fracture | 4423.60 | 4423.70 | 0 |
2019-08-25 | Multi-Stage Fracture | 4376.20 | 4376.30 | 0 |
2019-08-25 | Multi-Stage Fracture | 4329.10 | 4329.20 | 0 |
2019-08-24 | Multi-Stage Fracture | 5120.00 | 5120.10 | 0 |
2019-08-25 | Multi-Stage Fracture | 4282.10 | 4282.20 | 0 |
2019-08-25 | Multi-Stage Fracture | 4235.10 | 4235.20 | 0 |
2019-08-25 | Multi-Stage Fracture | 4189.70 | 4189.80 | 0 |
2019-08-25 | Multi-Stage Fracture | 4144.80 | 4144.90 | 0 |
2019-08-25 | Multi-Stage Fracture | 4098.70 | 4098.80 | 0 |
2019-08-25 | Multi-Stage Fracture | 4051.40 | 4051.50 | 0 |
2019-08-25 | Multi-Stage Fracture | 4005.30 | 4005.40 | 0 |
2019-08-25 | Multi-Stage Fracture | 3957.30 | 3957.40 | 0 |
2019-08-25 | Multi-Stage Fracture | 3909.50 | 3909.60 | 0 |
2019-08-25 | Multi-Stage Fracture | 3862.50 | 3862.60 | 0 |
2019-08-25 | Multi-Stage Fracture | 5074.40 | 5074.50 | 0 |
2019-08-25 | Multi-Stage Fracture | 3815.80 | 3815.90 | 0 |
2019-08-25 | Multi-Stage Fracture | 3768.50 | 3768.60 | 0 |
2019-08-26 | Multi-Stage Fracture | 3721.60 | 3721.70 | 0 |
2019-08-26 | Multi-Stage Fracture | 3674.00 | 3674.10 | 0 |
2019-08-26 | Multi-Stage Fracture | 3626.90 | 3627.00 | 0 |
2019-08-26 | Multi-Stage Fracture | 3580.40 | 3580.50 | 0 |
2019-08-26 | Multi-Stage Fracture | 3534.20 | 3534.30 | 0 |
2019-08-26 | Multi-Stage Fracture | 3487.80 | 3487.90 | 0 |
2019-08-26 | Multi-Stage Fracture | 3440.20 | 3440.30 | 0 |
2019-08-26 | Multi-Stage Fracture | 3393.80 | 3393.90 | 0 |
2019-08-25 | Multi-Stage Fracture | 5028.50 | 5028.60 | 0 |
2019-08-26 | Multi-Stage Fracture | 3347.70 | 3347.80 | 0 |
2019-08-26 | Multi-Stage Fracture | 3300.80 | 3300.90 | 0 |
2019-08-26 | Multi-Stage Fracture | 3254.90 | 3255.00 | 0 |
2019-08-26 | Multi-Stage Fracture | 3207.40 | 3207.50 | 0 |
2019-08-26 | Multi-Stage Fracture | 3160.00 | 3160.10 | 0 |
2019-08-26 | Multi-Stage Fracture | 3112.40 | 3112.50 | 0 |
2019-08-26 | Multi-Stage Fracture | 3066.80 | 3066.90 | 0 |
2019-08-26 | Multi-Stage Fracture | 3018.90 | 3019.00 | 0 |
2019-08-26 | Multi-Stage Fracture | 2973.20 | 2973.30 | 0 |
2019-08-26 | Multi-Stage Fracture | 2925.80 | 2925.90 | 0 |
2019-08-25 | Multi-Stage Fracture | 4983.40 | 4983.50 | 0 |
2019-08-26 | Multi-Stage Fracture | 2878.20 | 2878.30 | 0 |
2019-08-26 | Multi-Stage Fracture | 2832.30 | 2832.40 | 0 |
2019-08-26 | Multi-Stage Fracture | 2785.40 | 2785.50 | 0 |
2019-08-26 | Multi-Stage Fracture | 2737.60 | 2737.70 | 0 |
2019-08-27 | Multi-Stage Fracture | 2690.80 | 2690.90 | 0 |
2019-08-27 | Multi-Stage Fracture | 2646.00 | 2646.10 | 0 |
2019-08-27 | Multi-Stage Fracture | 2599.00 | 2599.10 | 0 |
2019-08-27 | Multi-Stage Fracture | 2551.40 | 2551.50 | 0 |
2019-08-25 | Multi-Stage Fracture | 4935.90 | 4936.00 | 0 |
2019-08-25 | Multi-Stage Fracture | 4889.00 | 4889.10 | 0 |
2019-08-25 | Multi-Stage Fracture | 4842.30 | 4842.40 | 0 |
2019-08-25 | Multi-Stage Fracture | 4795.50 | 4795.60 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-08-24 | 2019-08-27 | 1,866 | 8,550 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 95.3622 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.5589 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.243 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0097 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0097 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0733 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0733 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0764 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0764 | N/A | ||||
ELEFE-4 IFTR | Element | Surfactant | Alkylbenzenesulfonic acid | Trade Secret | 100 | 0.0922 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0922 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0922 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0922 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-08-19 | 2019-08-29 | Surface Water - Runoff | 8550 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 2435 | 0.0 | 0.0 | 0.0 |
2020 | 2143 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-30 | No Incident Encountered | 0.00 | 0.00 |
2019-08-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]