X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465101514000

Well Details

Well ID: 0465101514000
Loading map...
Location: 00/14-15-046-10W5/0
Location Alias: 00/14-15-46-10 W5M
Location Alias 2: 00/14-15-046-10 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 10
Section: 15
County/Municipality: Brazeau County
Well Name: BHP (CAN) PEMBINA 14-15-46-10
Operator Name: BHP Billiton Canada Inc.
License Number: 0176183
License Date: 1995-02-16
License Status: RecCertified
Spud Date: 1995-03-20
Final Drill Date: 1995-03-25
Well Total Depth: 742.00 m
Surface Hole Latitude: 52.971506
Surface Hole Longitude: -115.368918

For data sources see[1][2]

Well History

Date Event
1995-02-16 Obtained License
1995-03-21 Surface Casing Operation Performed
1995-03-25 Finished Drilling
1995-03-25 Well Log Performed
1995-03-26 Drill Stem Test Performed
1995-03-27 Drill Stem Test Performed
1995-03-28 Production Casing Operation Performed
1995-03-28 Rig Released
1995-04-07 Well Log Performed
1995-06-24 Perforation Treatment Performed - Jet Perforation
1995-06-27 Perforation Treatment Performed - Fractured
1995-06-28 Perforation Treatment Performed - Jet Perforation
1995-06-28 Well Log Performed
1995-06-30 Perforation Treatment Performed - Fractured
1995-07-13 Well Mode changed to Drilled and Cased
1995-09-06 Well Fluid changed to Gas
1995-09-06 Well Mode changed to Testing
1995-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-07 Perforation Treatment Performed - Jet Perforation
1995-09-07 Perforation Treatment Performed - Remedial Casing
1995-09-07 Plug Back Performed
1995-09-07 Well Fluid changed to Gas
1995-09-07 Well Mode changed to Abandoned
1995-09-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-24 Perforation 541.00 551.00 14
1995-06-27 Fracture 541.00 551.00 0
1995-06-28 Perforation 529.00 535.00 14
1995-06-30 Fracture 529.00 535.00 0
1995-09-07 Packing Device Capped w/Cement 502.00 510.00 0
1995-09-07 Perforation 155.00 156.00 13
1995-09-07 Remedial Casing Cementing 155.00 156.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 935 0.0 0.0 0.0

For data sources see[5]

References