X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465101107000

Well Details

Well ID: 0465101107000
Loading map...
Location: 00/07-11-046-10W5/0
Location Alias: 00/07-11-46-10 W5M
Location Alias 2: 00/07-11-046-10 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 10
Section: 11
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 7-11-46-10
Operator Name: Ridgeback Resources Inc.
License Number: 0230848
License Date: 1999-12-17
License Status: Suspension
Spud Date: 1999-12-19
Final Drill Date: 2000-01-05
Well Total Depth: 2466.00 m
Surface Hole Latitude: 52.949437
Surface Hole Longitude: -115.337562

For data sources see[1][2]

Well History

Date Event
1999-12-17 Obtained License
1999-12-22 Surface Casing Operation Performed
2000-01-05 Finished Drilling
2000-01-06 Well Log Performed
2000-01-07 Well Log Performed
2000-01-08 Production Casing Operation Performed
2000-01-08 Rig Released
2000-01-08 Well Mode changed to Drilled and Cased
2000-01-13 Perforation Treatment Performed - Jet Perforation
2000-01-13 Well Log Performed
2000-01-18 Perforation Treatment Performed - Fractured
2000-01-18 Perforation Treatment Performed - Jet Perforation
2000-01-19 Perforation Treatment Performed - Fractured
2004-02-12 Well Began Production
2004-02-12 Well Fluid changed to Gas
2004-02-12 Well Mode changed to Flowing
2005-08-01 Well Fluid changed to Gas
2005-08-01 Well Mode changed to Suspended
2007-03-13 Well Log Performed
2007-03-14 Perforation Treatment Performed - Jet Perforation
2007-03-16 Perforation Treatment Performed - Fractured
2020-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-11 Perforation Treatment Performed - Jet Perforation
2020-03-11 Plug Back Performed
2020-03-11 Well Fluid changed to Gas
2020-03-11 Well Mode changed to Abandoned Zone
2020-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-12 Perforation Treatment Performed - Cement Squeeze
2020-03-12 Perforation Treatment Performed - Jet Perforation
2020-03-12 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-13 Perforation 1863.50 1865.50 20
2020-03-12 Perforation 600.00 601.00 20
2020-03-12 Cement Squeeze 1210.00 1211.00 0
2020-03-12 Packing Device Capped w/Cement 585.70 594.00 0
2020-03-12 Cement Squeeze 600.00 601.00 0
2020-03-12 Packing Device Capped w/Cement 1189.60 1202.00 0
2000-01-18 Fracture 1863.50 1865.50 0
2000-01-18 Perforation 1863.50 1865.50 14
2000-01-19 Fracture 1863.50 1865.50 0
2007-03-14 Perforation 2442.00 2445.00 17
2007-03-16 Fracture 2442.00 2445.00 0
2020-03-11 Perforation 1210.00 1211.00 16
2020-03-11 Packing Device Capped w/Cement 2429.00 2437.00 0
2020-03-11 Packing Device Capped w/Cement 1845.00 1853.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1285 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References