X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465093005000

Well Details

Well ID: 0465093005000
Loading map...
Location: 00/05-30-046-09W5/0
Location Alias: 00/05-30-46-09 W5M
Location Alias 2: 00/05-30-046-09 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 09
Section: 30
County/Municipality: Brazeau County
Well Name: TQN ET AL HZ PEMBINA 5-30-46-9
Operator Name: TAQA North Ltd.
License Number: 0433350
License Date: 2011-05-06
License Status: Issued
Spud Date: 2011-07-31
Final Drill Date: 2011-08-18
Well Total Depth: 3351.00 m
Surface Hole Latitude: 52.993614
Surface Hole Longitude: -115.280095

For data sources see[1][2]

Well History

Date Event
2011-05-06 Obtained License
2011-07-31 Lost Circulation Occurred
2011-08-03 Surface Casing Operation Performed
2011-08-06 Direction Drilling Operation Performed - Deviate
2011-08-08 Direction Drilling Operation Performed - Horizontal
2011-08-10 Intermediate Casing Operation Performed
2011-08-18 Finished Drilling
2011-08-18 Well Log Performed
2011-08-18 Well Mode changed to Drilled and Cased
2011-08-20 Liner Casing Operation Performed
2011-08-21 Rig Released
2011-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-12 Well Began Production
2011-10-12 Well Fluid changed to Crude Oil
2011-10-12 Well Mode changed to Flowing
2011-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-06 1479.60 Deviate (5 - 79 degrees)
2011-08-08 2003.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-12 Multi-Stage Fracture 3323.50 3324.80 0
2011-10-22 Multi-Stage Fracture 2454.30 2499.90 0
2011-10-22 Multi-Stage Fracture 2255.50 2301.00 0
2011-10-22 Multi-Stage Fracture 2058.80 2104.60 0
2011-10-19 Multi-Stage Fracture 3226.00 3300.40 0
2011-10-19 Multi-Stage Fracture 3150.40 3256.00 0
2011-10-21 Multi-Stage Fracture 3150.30 3195.20 0
2011-10-21 Multi-Stage Fracture 3045.50 3104.90 0
2011-10-21 Multi-Stage Fracture 2953.20 2999.00 0
2011-10-21 Multi-Stage Fracture 2847.80 2893.30 0
2011-10-21 Multi-Stage Fracture 2757.00 2801.50 0
2011-10-21 Multi-Stage Fracture 2651.00 2696.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 456 0.0 0.0 0.0
2012 7967 0.0 0.0 0.0
2013 8111 0.0 0.0 0.0
2014 8158 0.0 0.0 0.0
2015 8426 0.0 0.0 0.0
2016 8544 0.0 0.0 0.0
2017 8646 0.0 0.0 0.0
2018 8497 0.0 0.0 0.0
2019 7633 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-31 Lost Circulation 107.00 107.00
2013-01-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References