X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465092816022

Well Details

Well ID: 0465092816022
Loading map...
Location: 02/16-28-046-09W5/2
Location Alias: 02/16-28-46-09 W5M
Location Alias 2: 02/16-28-046-09 W5/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 09
Section: 28
County/Municipality: Brazeau County
Well Name: BAYTEX HZ PEMBINA 16-28-46-9
Operator Name: Baccalieu Energy Inc.
License Number: 0463564
License Date: 2014-01-09
License Status: Suspension
Spud Date: 2014-01-30
Final Drill Date: 2014-02-19
Well Total Depth: 3378.00 m
Surface Hole Latitude: 53.002959
Surface Hole Longitude: -115.257522

For data sources see[1][2]

Well History

Date Event
2014-01-09 Obtained License
2014-02-01 Surface Casing Operation Performed
2014-02-10 Direction Drilling Operation Performed - Deviate
2014-02-10 Direction Drilling Operation Performed - Horizontal
2014-02-12 Direction Drilling Operation Performed - Horizontal
2014-02-14 Intermediate Casing Operation Performed
2014-02-18 Well Log Performed
2014-02-19 Finished Drilling
2014-02-19 Well Log Performed
2014-02-19 Well Mode changed to Drilled and Cased
2014-02-20 Well Log Performed
2014-02-21 Production Casing Operation Performed
2014-02-23 Perforation Treatment Performed - Open-Hole Completion
2014-02-23 Rig Released
2014-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-22 Well Began Production
2016-12-22 Well Fluid changed to Gas
2016-12-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-02-10 1743.60 Horizontal
2014-02-10 1839.70 Deviate (5 - 79 degrees)
2014-02-12 2198.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-23 Open Hole/Barefoot Completion 3376.00 3378.00 0
2014-03-07 Multi-Stage Fracture 2681.70 2681.80 0
2014-03-07 Multi-Stage Fracture 2601.90 2602.00 0
2014-03-07 Multi-Stage Fracture 2522.60 2522.70 0
2014-03-07 Multi-Stage Fracture 2441.10 2441.20 0
2014-03-07 Multi-Stage Fracture 2364.30 2364.40 0
2014-03-07 Multi-Stage Fracture 2282.90 2283.00 0
2014-03-07 Multi-Stage Fracture 3366.20 3366.30 0
2014-03-07 Multi-Stage Fracture 3286.60 3286.70 0
2014-03-07 Multi-Stage Fracture 3211.50 3211.60 0
2014-03-07 Multi-Stage Fracture 3126.20 3126.30 0
2014-03-07 Multi-Stage Fracture 3031.70 3031.80 0
2014-03-07 Multi-Stage Fracture 2950.00 2950.10 0
2014-03-07 Multi-Stage Fracture 2866.60 2866.70 0
2014-03-07 Multi-Stage Fracture 2787.40 2787.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-07 2014-03-07 2,115 3,263 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 78.6752 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 3.3871 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 10.1789 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.3378 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0379 N/A
Methanol 67-56-1 100 0.0379 N/A
Water 7732-18-5 100 0.0379 N/A
2K7 Water Soluble Paks Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0036 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1664 N/A
NE-118 Baker Hughes Demulsifier 1.2.4-Trimethyl benzene 95-63-6 100 0.0657 N/A
1.3.5-Trimethyl benzene 108-67-8 100 0.0657 N/A
Ethoxylated alcohols. C6-C12 68439-45-2 100 0.0657 N/A
Isopropanol 67-63-0 100 0.0656 N/A
Light aromatic solvent naphtha 64742-95-6 100 0.0657 N/A
Oxyalkylated phenolic resin 63428-92-2 100 0.0656 N/A
Xylene 1330-20-7 100 0.0657 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 7.0481 N/A
FRW-16A Baker Hughes Friction Reducer Ammonium sulfate 7783-20-2 100 0.0989 N/A
Non-hazardous Not Available 100 0.0989 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-03 2014-03-04 Surface Water - Runoff 1389
2014-02-28 2014-03-01 Groundwater - Non-saline less than or equal to 150m deep 261
2014-02-28 2014-02-28 Municipal Water 131
2014-03-01 2014-03-02 Surface Water - Runoff 1587

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 276 0.0 0.0 0.0
2017 8304 0.0 0.0 0.0
2018 8145 0.0 0.0 0.0
2019 8351 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-23 No Incident Encountered 0.00 0.00
2014-03-07 No Incident Encountered 0.00 0.00

For data sources see[9]

References