X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465081214000

Well Details

Well ID: 0465081214000
Loading map...
Location: 00/14-12-046-08W5/0
Location Alias: 00/14-12-46-08 W5M
Location Alias 2: 00/14-12-046-08 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 08
Section: 12
County/Municipality: County of Wetaskiwin No. 10
Well Name: WHITECAP PEMBINA 14-12-46-8
Operator Name: Whitecap Resources Inc.
License Number: 0415346
License Date: 2009-12-08
License Status: Amended
Spud Date: 2009-12-13
Final Drill Date: 2009-12-26
Well Total Depth: 2716.00 m
Surface Hole Latitude: 52.957047
Surface Hole Longitude: -115.015027

For data sources see[1][2]

Well History

Date Event
2009-12-08 Obtained License
2009-12-14 Surface Casing Operation Performed
2009-12-16 Direction Drilling Operation Performed - Horizontal
2009-12-19 Well Log Performed
2009-12-20 Intermediate Casing Operation Performed
2009-12-26 Finished Drilling
2009-12-26 Well Log Performed
2009-12-26 Well Mode changed to Drilled and Cased
2009-12-28 Liner Casing Operation Performed
2009-12-29 Rig Released
2010-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-25 Perforation Treatment Performed - Open-Hole Completion
2010-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-22 Well Began Production
2010-04-22 Well Fluid changed to Crude Oil
2010-04-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-16 1357.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-25 Open Hole/Barefoot Completion 2714.00 2716.00 0
2010-02-24 Multi-Stage Fracture 1958.00 1958.10 0
2010-02-24 Multi-Stage Fracture 1872.00 1872.10 0
2010-01-25 Multi-Stage Fracture 2675.00 2675.10 0
2010-01-26 Multi-Stage Fracture 2585.00 2585.10 0
2010-02-20 Multi-Stage Fracture 2472.00 2472.10 0
2010-02-20 Multi-Stage Fracture 2403.00 2403.10 0
2010-02-21 Multi-Stage Fracture 2310.00 2310.10 0
2010-02-22 Multi-Stage Fracture 2208.00 2208.10 0
2010-02-23 Multi-Stage Fracture 2102.00 2102.10 0
2010-02-23 Multi-Stage Fracture 2045.00 2045.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5773 0.0 0.0 0.0
2011 8023 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8327 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8472 0.0 0.0 0.0
2018 8741 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References