If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465073205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.988092,"lon":-114.989157,"icon":""}]} |
Location: 00/05-32-046-07W5/0 | |
Location Alias: 00/05-32-46-07 W5M | |
Location Alias 2: 00/05-32-046-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 07 | |
Section: 32 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: BONTERRA HZ PEMBINA 5-32-46-7 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0488306 | |
License Date: 2018-02-15 | |
License Status: Amended | |
Spud Date: 2018-04-08 | |
Final Drill Date: 2018-04-19 | |
Well Total Depth: 4075.00 m | |
Surface Hole Latitude: 52.988092 | |
Surface Hole Longitude: -114.989157 |
Date | Event |
---|---|
2018-02-15 | Obtained License |
2018-04-09 | Surface Casing Operation Performed |
2018-04-11 | Direction Drilling Operation Performed - Deviate |
2018-04-13 | Well Log Performed |
2018-04-14 | Intermediate Casing Operation Performed |
2018-04-15 | Direction Drilling Operation Performed - Horizontal |
2018-04-19 | Finished Drilling |
2018-04-19 | Well Log Performed |
2018-04-19 | Well Mode changed to Drilled and Cased |
2018-04-20 | Liner Casing Operation Performed |
2018-04-23 | Rig Released |
2018-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-07-03 | Well Began Production |
2018-07-03 | Well Fluid changed to Crude Oil |
2018-07-03 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-04-08 | Ironhand Drilling Inc. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-04-11 | 1436.70 | Deviate (5 - 79 degrees) |
2018-04-15 | 1752.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-06-24 | Multi-Stage Fracture | 4043.90 | 4048.70 | 0 |
2018-06-24 | Multi-Stage Fracture | 3545.60 | 3550.30 | 0 |
2018-06-24 | Multi-Stage Fracture | 3490.50 | 3495.30 | 0 |
2018-06-24 | Multi-Stage Fracture | 3435.30 | 3440.10 | 0 |
2018-06-24 | Multi-Stage Fracture | 3379.90 | 3384.70 | 0 |
2018-06-24 | Multi-Stage Fracture | 3324.90 | 3329.70 | 0 |
2018-06-24 | Multi-Stage Fracture | 3269.50 | 3274.30 | 0 |
2018-06-24 | Multi-Stage Fracture | 3214.10 | 3218.90 | 0 |
2018-06-24 | Multi-Stage Fracture | 3159.10 | 3163.90 | 0 |
2018-06-24 | Multi-Stage Fracture | 3104.10 | 3108.90 | 0 |
2018-06-24 | Multi-Stage Fracture | 3048.80 | 3053.50 | 0 |
2018-06-24 | Multi-Stage Fracture | 3988.50 | 3993.30 | 0 |
2018-06-24 | Multi-Stage Fracture | 2993.70 | 2998.50 | 0 |
2018-06-24 | Multi-Stage Fracture | 2938.40 | 2943.20 | 0 |
2018-06-25 | Multi-Stage Fracture | 2883.10 | 2887.80 | 0 |
2018-06-25 | Multi-Stage Fracture | 2607.50 | 2612.30 | 0 |
2018-06-25 | Multi-Stage Fracture | 2552.30 | 2557.10 | 0 |
2018-06-25 | Multi-Stage Fracture | 2497.00 | 2501.70 | 0 |
2018-06-25 | Multi-Stage Fracture | 2441.60 | 2446.30 | 0 |
2018-06-25 | Multi-Stage Fracture | 2386.30 | 2391.10 | 0 |
2018-06-25 | Multi-Stage Fracture | 2332.00 | 2336.80 | 0 |
2018-06-25 | Multi-Stage Fracture | 2277.00 | 2281.80 | 0 |
2018-06-24 | Multi-Stage Fracture | 3933.20 | 3937.90 | 0 |
2018-06-25 | Multi-Stage Fracture | 2222.30 | 2227.10 | 0 |
2018-06-25 | Multi-Stage Fracture | 2167.00 | 2171.80 | 0 |
2018-06-25 | Multi-Stage Fracture | 2111.50 | 2116.30 | 0 |
2018-06-25 | Multi-Stage Fracture | 2056.40 | 2061.20 | 0 |
2018-06-25 | Multi-Stage Fracture | 2001.20 | 2006.00 | 0 |
2018-06-25 | Multi-Stage Fracture | 1945.80 | 1950.60 | 0 |
2018-06-25 | Multi-Stage Fracture | 1890.50 | 1895.30 | 0 |
2018-06-25 | Multi-Stage Fracture | 1835.20 | 1840.00 | 0 |
2018-06-25 | Multi-Stage Fracture | 1779.70 | 1784.50 | 0 |
2018-06-24 | Multi-Stage Fracture | 3877.80 | 3882.50 | 0 |
2018-06-24 | Multi-Stage Fracture | 3822.30 | 3827.10 | 0 |
2018-06-24 | Multi-Stage Fracture | 3766.90 | 3771.70 | 0 |
2018-06-24 | Multi-Stage Fracture | 3711.50 | 3716.30 | 0 |
2018-06-24 | Multi-Stage Fracture | 3656.20 | 3660.90 | 0 |
2018-06-24 | Multi-Stage Fracture | 3600.80 | 3605.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-06-24 | 2018-06-25 | 1,658 | 3,614 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 81.9308 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 13.5748 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 4.3018 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0194 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0194 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0194 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0194 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0194 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0875 | N/A | |
water | Not Available | 100 | 0.0875 | N/A | ||||
FR-22 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0454 | N/A | |
distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0454 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0454 | N/A | ||||
NMR-1 | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0399 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0399 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-06-22 | 2018-06-25 | Surface Water - Runoff | 1178 |
2018-06-22 | 2018-06-25 | Surface Water - Runoff | 2698 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4332 | 0.0 | 0.0 | 0.0 |
2019 | 8452 | 0.0 | 0.0 | 0.0 |
2020 | 2063 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-23 | No Incident Encountered | 0.00 | 0.00 |
2018-06-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]