X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465072011000

Well Details

Well ID: 0465072011000
Loading map...
Location: 00/11-20-046-07W5/0
Location Alias: 00/11-20-46-07 W5M
Location Alias 2: 00/11-20-046-07 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 07
Section: 20
County/Municipality: County of Wetaskiwin No. 10
Well Name: ERC HZ PEMBINA 11-20-46-7
Operator Name: Bonterra Energy Corp.
License Number: 0424850
License Date: 2010-10-21
License Status: Issued
Spud Date: 2010-12-19
Final Drill Date: 2011-01-12
Well Total Depth: 2692.00 m
Surface Hole Latitude: 52.992760
Surface Hole Longitude: -114.972374

For data sources see[1][2]

Well History

Date Event
2010-10-21 Obtained License
2010-12-19 Lost Circulation Occurred
2010-12-30 Surface Casing Operation Performed
2010-12-30 Well Log Performed
2010-12-31 Direction Drilling Operation Performed - Horizontal
2011-01-08 Liner Casing Operation Performed
2011-01-12 Finished Drilling
2011-01-12 Well Mode changed to Drilled and Cased
2011-01-18 Liner Casing Operation Performed
2011-01-18 Perforation Treatment Performed - Open-Hole Completion
2011-01-18 Rig Released
2011-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-02-23 Perforation Treatment Performed - Remedial Casing
2011-02-23 Well Log Performed
2011-02-28 Well Log Performed
2011-03-15 Perforation Treatment Performed - Jet Perforation
2011-03-15 Perforation Treatment Performed - Remedial Casing
2011-03-25 Intermediate Casing Operation Performed
2011-04-01 Well Began Production
2011-04-01 Well Fluid changed to Crude Oil
2011-04-01 Well Mode changed to Pumping
2011-08-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-31 1194.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-18 Open Hole/Barefoot Completion 1901.50 2679.60 0
2011-02-23 Perforation 149.00 150.00 99
2011-02-23 Remedial Casing Cementing 149.00 150.00 0
2011-03-15 Perforation 149.00 150.00 99
2011-03-15 Remedial Casing Cementing 149.00 150.00 0
2011-02-06 Multi-Stage Fracture 2675.40 2675.50 0
2011-02-06 Multi-Stage Fracture 2586.90 2587.00 0
2011-02-07 Multi-Stage Fracture 2460.90 2461.00 0
2011-02-07 Multi-Stage Fracture 2336.00 2336.10 0
2011-02-07 Multi-Stage Fracture 2235.10 2235.20 0
2011-02-07 Multi-Stage Fracture 2145.60 2145.70 0
2011-02-07 Multi-Stage Fracture 2058.80 2058.90 0
2011-02-07 Multi-Stage Fracture 1971.60 1971.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5797 0.0 0.0 0.0
2012 6756 0.0 0.0 0.0
2013 8100 0.0 0.0 0.0
2014 6820 0.0 0.0 0.0
2015 8519 0.0 0.0 0.0
2016 8306 0.0 0.0 0.0
2017 8227 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8453 0.0 0.0 0.0
2020 2016 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-12-19 Lost Circulation 108.00 127.00

For data sources see[7]

References