If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465071612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.981191,"lon":-114.946935,"icon":""}]} |
Location: 00/12-16-046-07W5/0 | |
Location Alias: 00/12-16-46-07 W5M | |
Location Alias 2: 00/12-16-046-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 07 | |
Section: 16 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: ENERPLUS CORP HZ PEMBINA 12-16-46-7 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0436675 | |
License Date: 2011-09-09 | |
License Status: Issued | |
Spud Date: 2011-10-21 | |
Final Drill Date: 2011-11-07 | |
Well Total Depth: 3274.00 m | |
Surface Hole Latitude: 52.981191 | |
Surface Hole Longitude: -114.946935 |
Date | Event |
---|---|
2011-09-09 | Obtained License |
2011-10-25 | Surface Casing Operation Performed |
2011-10-26 | Well Log Performed |
2011-10-27 | Direction Drilling Operation Performed - Horizontal |
2011-10-29 | Intermediate Casing Operation Performed |
2011-10-29 | Well Log Performed |
2011-11-07 | Finished Drilling |
2011-11-07 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-07 | Well Log Performed |
2011-11-07 | Well Mode changed to Drilled and Cased |
2011-11-12 | Liner Casing Operation Performed |
2011-11-14 | Rig Released |
2011-12-03 | Well Log Performed |
2011-12-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-08 | Well Log Performed |
2012-01-24 | Well Log Performed |
2012-04-18 | Well Began Injection |
2012-04-18 | Well Fluid changed to Water |
2012-04-18 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-27 | 1314.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-07 | Open Hole/Barefoot Completion | 3248.00 | 3274.00 | 0 |
2011-12-15 | Multi-Stage Fracture | 1735.60 | 1735.70 | 0 |
2011-12-15 | Multi-Stage Fracture | 3223.50 | 3223.60 | 0 |
2011-12-15 | Multi-Stage Fracture | 3074.60 | 3074.70 | 0 |
2011-12-15 | Multi-Stage Fracture | 2898.30 | 2898.40 | 0 |
2011-12-15 | Multi-Stage Fracture | 2681.00 | 2681.10 | 0 |
2011-12-15 | Multi-Stage Fracture | 2476.10 | 2476.20 | 0 |
2011-12-15 | Multi-Stage Fracture | 2273.30 | 2273.40 | 0 |
2011-12-15 | Multi-Stage Fracture | 2083.80 | 2083.90 | 0 |
2011-12-15 | Multi-Stage Fracture | 1878.60 | 1878.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]