If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465033006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.993222,"lon":-114.425277,"icon":""}]} |
Location: 00/06-30-046-03W5/0 | |
Location Alias: 00/06-30-46-03 W5M | |
Location Alias 2: 00/06-30-046-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 03 | |
Section: 30 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: JOURNEY CRYSTAL 6-30-46-3 | |
Operator Name: Journey Energy Inc. | |
License Number: 0101401 | |
License Date: 1983-05-25 | |
License Status: Suspension | |
Spud Date: 1983-06-06 | |
Final Drill Date: 1983-06-15 | |
Well Total Depth: 1745.00 m | |
Surface Hole Latitude: 52.993222 | |
Surface Hole Longitude: -114.425277 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-05-25 | Obtained License |
1983-06-15 | Finished Drilling |
1983-06-15 | Well Mode changed to Drilled and Cased |
1983-06-16 | Production Casing Operation Performed |
1983-07-12 | Perforation Treatment Performed - Jet Perforation |
1983-07-14 | Perforation Treatment Performed - Fractured |
1983-08-01 | Well Began Production |
1983-08-01 | Well Fluid changed to Crude Oil |
1983-08-01 | Well Mode changed to Pumping |
1990-08-29 | Perforation Treatment Performed - Jet Perforation |
1994-10-31 | Well Fluid changed to Crude Oil |
1994-10-31 | Well Mode changed to Suspended |
1999-03-07 | Well Log Performed |
1999-04-08 | Well Began Injection |
1999-04-08 | Well Fluid changed to Water |
1999-04-08 | Well Type changed to Injection |
2001-06-01 | Well Fluid changed to Water |
2001-06-01 | Well Mode changed to Suspended |
2001-06-01 | Well Type changed to Injection |
2012-12-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-07-12 | Perforation | 1704.50 | 1707.00 | 13 |
1983-07-14 | Fracture | 1704.50 | 1707.00 | 0 |
1990-08-29 | Perforation | 1700.50 | 1703.00 | 13 |
2012-12-07 | Packing Device Capped w/Cement | 1686.00 | 1694.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 2236 | 0.0 | 0.0 | 0.0 |
1984 | 4673 | 0.0 | 0.0 | 0.0 |
1985 | 6038 | 0.0 | 0.0 | 0.0 |
1990 | 4565 | 0.0 | 0.0 | 0.0 |
1991 | 8475 | 0.0 | 0.0 | 0.0 |
1992 | 8716 | 0.0 | 0.0 | 0.0 |
1993 | 3654 | 0.0 | 0.0 | 0.0 |
1994 | 3779 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]