If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465032906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.994483,"lon":-114.404632,"icon":""}]} |
Location: 00/06-29-046-03W5/0 | |
Location Alias: 00/06-29-46-03 W5M | |
Location Alias 2: 00/06-29-046-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 03 | |
Section: 29 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: JOURNEY CRYSTAL 6-29-46-3 | |
Operator Name: Journey Energy Inc. | |
License Number: 0104081 | |
License Date: 1983-11-10 | |
License Status: Suspension | |
Spud Date: 1983-11-16 | |
Final Drill Date: 1983-11-23 | |
Well Total Depth: 1723.00 m | |
Surface Hole Latitude: 52.994483 | |
Surface Hole Longitude: -114.404632 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-11-10 | Obtained License |
1983-11-23 | Finished Drilling |
1983-11-24 | Production Casing Operation Performed |
1983-11-28 | Well Mode changed to Drilled and Cased |
1985-02-18 | Well Log Performed |
1985-02-19 | Well Log Performed |
1985-02-20 | Perforation Treatment Performed - Jet Perforation |
1985-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-03-01 | Well Log Performed |
1985-04-07 | Well Began Injection |
1985-04-07 | Well Fluid changed to Water |
1985-04-07 | Well Type changed to Injection |
1998-11-05 | Well Fluid changed to Water |
1998-11-05 | Well Mode changed to Suspended |
1998-11-05 | Well Type changed to Injection |
2012-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-13 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-02-20 | Perforation | 1676.50 | 1678.00 | 13 |
1985-02-20 | Perforation | 1668.50 | 1675.00 | 13 |
1985-02-21 | Acid Treatment | 1668.50 | 1678.00 | 0 |
2012-02-13 | Packing Device Capped w/Cement | 1658.00 | 1666.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]