X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465032705000

Well Details

Well ID: 0465032705000
Loading map...
Location: 00/05-27-046-03W5/0
Location Alias: 00/05-27-46-03 W5M
Location Alias 2: 00/05-27-046-03 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 03
Section: 27
County/Municipality: County of Wetaskiwin No. 10
Well Name: RPCL CRYSTAL 5-27-46-3
Operator Name: Resourceful Petroleum Canada Limited
License Number: 0469751
License Date: 2014-09-10
License Status: Issued
Spud Date: 2014-11-04
Final Drill Date: 2014-11-26
Well Total Depth: 4980.00 m
Surface Hole Latitude: 52.976251
Surface Hole Longitude: -114.344368

For data sources see[1][2]

Well History

Date Event
2014-09-10 Obtained License
2014-11-06 Surface Casing Operation Performed
2014-11-12 Direction Drilling Operation Performed - Deviate
2014-11-18 Direction Drilling Operation Performed - Horizontal
2014-11-18 Well Log Performed
2014-11-19 Intermediate Casing Operation Performed
2014-11-25 Well Log Performed
2014-11-26 Finished Drilling
2014-11-26 Well Mode changed to Drilled and Cased
2014-11-27 Production Casing Operation Performed
2014-11-27 Rig Released
2014-12-12 Perforation Treatment Performed - Jet Perforation
2015-02-03 Perforation Treatment Performed - Jet Perforation
2015-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-04 Perforation Treatment Performed - Jet Perforation
2015-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-05 Perforation Treatment Performed - Jet Perforation
2015-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-06 Perforation Treatment Performed - Jet Perforation
2015-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-07 Perforation Treatment Performed - Jet Perforation
2015-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-08 Perforation Treatment Performed - Jet Perforation
2015-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-09 Perforation Treatment Performed - Jet Perforation
2015-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-10 Perforation Treatment Performed - Jet Perforation
2015-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-11 Perforation Treatment Performed - Jet Perforation
2015-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-12 Perforation Treatment Performed - Jet Perforation
2015-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-22 Well Began Production
2015-06-22 Well Fluid changed to Gas
2015-06-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-04 Twilight Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-12 2107.50 Deviate (5 - 79 degrees)
2014-11-18 2957.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-12 Perforation 4935.00 4976.00 22
2015-02-06 Multi-Stage Fracture 4615.00 4676.00 0
2015-02-06 Perforation 4535.00 4596.00 22
2015-02-06 Multi-Stage Fracture 4535.00 4596.00 0
2015-02-07 Perforation 4435.00 4516.00 22
2015-02-07 Multi-Stage Fracture 4435.00 4515.00 0
2015-02-07 Perforation 4335.00 4416.00 22
2015-02-08 Multi-Stage Fracture 4335.00 4416.00 0
2015-02-08 Perforation 4235.00 4316.00 22
2015-02-08 Multi-Stage Fracture 4235.00 4316.00 0
2015-02-08 Perforation 4135.00 4216.00 22
2015-02-03 Multi-Stage Fracture 4935.00 4976.00 0
2015-02-09 Multi-Stage Fracture 4135.00 4216.00 0
2015-02-09 Perforation 4035.00 4116.00 22
2015-02-09 Multi-Stage Fracture 4035.00 4116.00 0
2015-02-09 Perforation 3935.00 4016.00 22
2015-02-10 Multi-Stage Fracture 3935.00 4016.00 0
2015-02-10 Perforation 3835.00 3916.00 22
2015-02-10 Multi-Stage Fracture 3835.00 3916.00 0
2015-02-10 Perforation 3735.00 3816.00 22
2015-02-10 Multi-Stage Fracture 3735.00 3816.00 0
2015-02-10 Perforation 3635.00 3716.00 22
2015-02-03 Perforation 4855.00 4916.00 22
2015-02-11 Multi-Stage Fracture 3635.00 3716.00 0
2015-02-11 Perforation 3535.00 3616.00 22
2015-02-11 Multi-Stage Fracture 3535.00 3616.00 0
2015-02-11 Perforation 3435.00 3516.00 22
2015-02-11 Multi-Stage Fracture 3435.00 3516.00 0
2015-02-12 Perforation 3335.00 3416.00 22
2015-02-12 Multi-Stage Fracture 3335.00 3416.00 0
2015-02-12 Perforation 3235.00 3316.00 22
2015-02-12 Multi-Stage Fracture 3235.00 3316.00 0
2015-02-12 Perforation 3135.00 3216.00 22
2015-02-04 Multi-Stage Fracture 4855.00 4916.00 0
2015-02-12 Multi-Stage Fracture 3135.00 3216.00 0
2015-02-12 Perforation 3035.00 3115.00 22
2015-02-13 Multi-Stage Fracture 3035.00 3115.00 0
2015-02-04 Perforation 4775.00 4836.00 22
2015-02-04 Multi-Stage Fracture 4775.00 4836.00 0
2015-02-05 Perforation 4695.00 4756.00 22
2015-02-05 Multi-Stage Fracture 4695.00 4756.00 0
2015-02-05 Perforation 4615.00 4676.00 22

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-03 2015-02-13 2,600 14,499 N/A
2 2015-02-07 2015-02-13 2,600 0 N/A
3 2015-02-06 2015-02-09 2,600 0 N/A
4 2015-02-04 2015-02-05 2,600 0 N/A
5 2015-02-10 2015-02-13 2,600 0 N/A
6 2015-02-04 2015-02-04 2,600 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Chlorine dioxide 10049-04-4 100 80.2857 N/A
Water Not Available 100 80.2892 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 11.3093 N/A
Hydrochloric Acid 15% Baker Hughes Acid Hydrochloric acid 7647-01-0 100 1.2783 N/A
Water 7732-18-5 100 1.2783 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0115 N/A
Methanol 67-56-1 100 0.0115 N/A
Water 7732-18-5 100 0.0115 N/A
Breaker HP Baker Hughes Breaker Ethylene glycol 107-21-1 100 0.3262 N/A
Non-hazardous Not Available 100 0.3262 N/A
tert-Butyl hydroperoxide 75-91-2 100 0.3262 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0013 N/A
BF-7L Baker Hughes Buffer Non-hazardous Not Available 100 0.2173 N/A
Potassium carbonate 584-08-7 100 0.2173 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0891 N/A
CI-27 Baker Hughes Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0064 N/A
Methanol 67-56-1 100 0.0064 N/A
Modified thiourea polymer 68527-49-1 100 0.0064 N/A
Olefin 64743-02-8 100 0.0064 N/A
Polyoxyalkylenes 68951-67-7 100 0.0064 N/A
Propargyl alcohol 107-19-7 100 0.0064 N/A
IF-350 Baker Hughes Corrosion Inhibitor Formic acid 64-18-6 100 0.0143 N/A
Non-hazardous Not Available 100 0.0143 N/A
XLW-8 Baker Hughes Crosslinker Glycerin 56-81-5 100 0.159 N/A
Non-hazardous Not Available 100 0.159 N/A
Sodium tetraborate 1303-96-4 100 0.159 N/A
FP-12L Baker Hughes Defoamer Non-hazardous Not Available 100 0.0001 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
NE-118 Baker Hughes Demulsifier 1.2.4-Trimethyl benzene 95-63-6 100 0.001 N/A
1.3.5-Trimethyl benzene 108-67-8 100 0.001 N/A
Ethoxylated alcohols. C6-C12 68439-45-2 100 0.001 N/A
Isopropanol 67-63-0 100 0.001 N/A
Light aromatic solvent naphtha 64742-95-6 100 0.001 N/A
Oxyalkylated phenolic resin 63428-92-2 100 0.001 N/A
Xylene 1330-20-7 100 0.001 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.027 N/A
Oxyalkylated alcohol 9014 100 0.027 N/A
Petroleum distillates 64742-47-8 100 0.027 N/A
Polyacrylate 9014 100 0.027 N/A
GW-3 Baker Hughes Gelling Agent Guar gum 9000-30-0 100 0.1781 N/A
GW-3SLR Baker Hughes Gelling Agent Guar gum 9000-30-0 100 0.4441 N/A
Low toxicity base oils - Non-WHMIS Controlled Not Available 100 0.4441 N/A
Ferrotrol 800 Baker Hughes Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0119 N/A
ScaleTrol 14 Baker Hughes Scale Inhibitor Non-hazardous Not Available 100 0.0056 N/A
Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0056 N/A
GasFlo G2 Baker Hughes Surfactant Non-hazardous Not Available 100 0.0921 N/A
2 FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 5.0974 N/A
3 PRIME PLUS 30/50 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.2329 N/A
4 PRIME PLUS 40/70 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.3308 N/A
5 SB PRIME 20/40 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.3865 N/A
6 2K7 Water Soluble Paks Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.002 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-26 2015-02-11 Surface Water - Runoff 14499

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4275 0.0 0.0 0.0
2016 1187 0.0 0.0 0.0
2017 726 0.0 0.0 0.0
2018 3165 0.0 0.0 0.0
2019 3834 0.0 0.0 0.0
2020 1517 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-28 No Incident Encountered 0.00 0.00
2015-02-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References