X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465020608022

Well Details

Well ID: 0465020608022
Loading map...
Location: 02/08-06-046-02W5/2
Location Alias: 02/08-06-46-02 W5M
Location Alias 2: 02/08-06-046-02 W5/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 02
Section: 06
County/Municipality: County of Wetaskiwin No. 10
Well Name: LOYAL ENERGY 102 PEMBINA 8-6-46-2
Operator Name: Loyal Energy (canada) Operating Ltd.
License Number: 0206302
License Date: 1997-09-18
License Status: Issued
Spud Date: 1997-09-25
Final Drill Date: 1997-10-18
Well Total Depth: 2379.00 m
Surface Hole Latitude: 52.939625
Surface Hole Longitude: -114.268285

For data sources see[1][2]

Well History

Date Event
1997-09-18 Obtained License
1997-09-25 Lost Circulation Occurred
1997-09-25 Well Log Performed
1997-09-26 Surface Casing Operation Performed
1997-10-03 Direction Drilling Operation Performed - Horizontal
1997-10-10 Production Casing Operation Performed
1997-10-18 Finished Drilling
1997-10-18 Well Mode changed to Drilled and Cased
1997-10-19 Perforation Treatment Performed - Open-Hole Completion
1997-10-19 Rig Released
1997-10-30 Well Log Performed
1997-11-20 Well Log Performed
1998-12-10 Liner Casing Operation Performed
1998-12-10 Perforation Treatment Performed - Slotted Liner or Casing
1999-03-22 Perforation Treatment Performed - Jet Perforation
1999-03-22 Well Mode changed to Drilled and Cased
1999-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-25 Perforation Treatment Performed - Fractured
1999-04-01 Well Began Production
1999-04-01 Well Fluid changed to Gas
1999-04-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-03 1715.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-19 Open Hole/Barefoot Completion 1924.60 2379.00 0
1998-12-10 Slotted Liner 1924.60 2379.00 0
1999-03-22 Perforation 1652.00 1655.00 17
1999-03-23 Acid Treatment 1652.00 1655.00 0
1999-03-25 Fracture 1652.00 1655.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4685 0.0 0.0 0.0
2000 6620 0.0 0.0 0.0
2001 7732 0.0 0.0 0.0
2002 7927 0.0 0.0 0.0
2003 7810 0.0 0.0 0.0
2004 6935 0.0 0.0 0.0
2005 8470 0.0 0.0 0.0
2006 8722 0.0 0.0 0.0
2007 8221 0.0 0.0 0.0
2008 8601 0.0 0.0 0.0
2009 5067 0.0 0.0 0.0
2010 7318 0.0 0.0 0.0
2011 8543 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8646 0.0 0.0 0.0
2014 8301 0.0 0.0 0.0
2015 7583 0.0 0.0 0.0
2016 8732 0.0 0.0 0.0
2017 8740 0.0 0.0 0.0
2018 7727 0.0 0.0 0.0
2019 6626 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-09-25 Lost Circulation 30.00 120.00

For data sources see[7]

References