X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283603000

Well Details

Well ID: 0464283603000
Loading map...
Location: 00/03-36-046-28W4/0
Location Alias: 00/03-36-46-28 W4M
Location Alias 2: 00/03-36-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 36
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO. 3-36
Operator Name: Imperial Oil Resources Limited
License Number: 0007988
License Date: 1954-05-03
License Status: Abandoned
Spud Date: 1954-05-07
Final Drill Date: 1954-06-14
Well Total Depth: 2183.60 m
Surface Hole Latitude: 53.005157
Surface Hole Longitude: -113.938004

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-05-03 Obtained License
1954-06-09 Liner Casing Operation Performed
1954-06-11 Lost Circulation Occurred
1954-06-14 Finished Drilling
1954-06-14 Well Mode changed to Drilled and Cased
1954-06-18 Perforation Treatment Performed - Bullet Perforation
1954-06-18 Perforation Treatment Performed - Jet Perforation
1954-06-20 Well Began Production
1954-06-20 Well Fluid changed to Crude Oil
1954-06-20 Well Mode changed to Flowing
1972-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-13 Well Fluid changed to Crude Oil
1980-09-13 Well Mode changed to Pumping
1980-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-13 Perforation Treatment Performed - Cement Squeeze
1983-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-19 Perforation Treatment Performed - Jet Perforation
1985-02-26 Well Log Performed
1985-02-27 Perforation Treatment Performed - Jet Perforation
1985-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-28 Perforation Treatment Performed - Cement Squeeze
1985-03-08 Perforation Treatment Performed - Jet Perforation
1985-03-08 Well Log Performed
1985-03-10 Well Log Performed
1985-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-13 Perforation Treatment Performed - Jet Perforation
1985-03-13 Well Log Performed
1985-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-14 Perforation Treatment Performed - Cement Squeeze
1985-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-11-04 Perforation Treatment Performed - Cement Squeeze
1987-11-30 Well Log Performed
1988-11-30 Well Log Performed
1991-01-07 Perforation Treatment Performed - Jet Perforation
1991-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-17 Well Log Performed
1994-05-19 Perforation Treatment Performed - Jet Perforation
1997-08-25 Perforation Treatment Performed - Jet Perforation
1997-08-25 Well Log Performed
1997-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-21 Perforation Treatment Performed - Jet Perforation
1998-05-21 Well Log Performed
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Suspended
2002-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-04 Perforation Treatment Performed - Cement Plug
2002-11-04 Plug Back Performed
2002-11-04 Well Fluid changed to Crude Oil
2002-11-04 Well Mode changed to Abandoned Zone
2002-11-05 Perforation Treatment Performed - Jet Perforation
2002-11-06 Perforation Treatment Performed - Cement Plug
2002-11-06 Perforation Treatment Performed - Remedial Casing
2002-11-06 Plug Back Performed
2003-08-19 Well Abandoned
2003-08-19 Well Fluid changed to Crude Oil
2003-08-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-06-18 Bullet Perforation 2167.70 2172.90 13
1985-02-27 Perforation 2174.70 2175.00 13
1985-02-28 Acid Treatment 2174.70 2175.00 0
1985-02-28 Cement Squeeze 2174.70 2175.00 0
1985-03-08 Perforation 2179.00 2179.70 13
1985-03-11 Acid Treatment 2178.40 2180.40 0
1985-03-13 Perforation 2172.50 2173.50 14
1985-03-14 Acid Treatment 2172.50 2173.50 0
1985-03-14 Cement Squeeze 2172.50 2173.50 0
1985-03-26 Acid Treatment 2178.40 2180.40 0
1986-11-04 Cement Squeeze 2178.40 2180.40 0
1954-06-18 Perforation 2167.70 2172.90 13
1991-01-07 Perforation 2169.70 2170.70 13
1991-01-08 Acid Treatment 2169.70 2170.70 0
1994-05-19 Perforation 2161.10 2161.90 13
1997-08-25 Perforation 2150.20 2151.20 16
1997-08-26 Acid Treatment 2150.20 2151.20 0
1998-05-21 Perforation 2140.10 2141.10 17
2002-11-04 Packing Device Capped w/Cement 2072.20 2135.00 0
2002-11-04 Cement Plug 1566.00 1719.20 0
2002-11-05 Perforation 204.50 205.00 26
2002-11-06 Remedial Casing Cementing 204.50 205.00 0
1972-12-15 Acid Treatment 2167.70 2172.90 0
2002-11-06 Cement Plug 180.00 204.50 0
1980-09-06 Acid Treatment 2167.70 2172.90 0
1980-09-16 Acid Treatment 2167.70 2172.90 0
1982-12-26 Acid Treatment 2167.70 2172.90 0
1983-01-13 Cement Squeeze 2167.70 2172.90 0
1983-01-19 Perforation 2178.40 2180.40 13
1983-01-19 Acid Treatment 2178.40 2180.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 793 0.0 0.0 0.0
1973 7173 0.0 0.0 0.0
1974 8044 0.0 0.0 0.0
1975 4757 0.0 0.0 0.0
1977 288 0.0 0.0 0.0
1978 6729 0.0 0.0 0.0
1979 8495 0.0 0.0 0.0
1980 7128 0.0 0.0 0.0
1981 6407 0.0 0.0 0.0
1982 7026 0.0 0.0 0.0
1983 4760 0.0 0.0 0.0
1984 4471 0.0 0.0 0.0
1985 3503 0.0 0.0 0.0
1986 624 0.0 0.0 0.0
1987 7879 0.0 0.0 0.0
1988 8637 0.0 0.0 0.0
1989 8397 0.0 0.0 0.0
1990 6601 0.0 0.0 0.0
1991 7189 0.0 0.0 0.0
1992 7191 0.0 0.0 0.0
1993 7597 0.0 0.0 0.0
1994 7633 0.0 0.0 0.0
1995 8459 0.0 0.0 0.0
1996 8548 0.0 0.0 0.0
1997 8124 0.0 0.0 0.0
1998 8038 0.0 0.0 0.0
1999 3679 0.0 0.0 0.0
2000 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1954-06-11 Lost Circulation 2126.30 2126.30

For data sources see[6]

References