X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283502000

Well Details

Well ID: 0464283502000
Loading map...
Location: 00/02-35-046-28W4/0
Location Alias: 00/02-35-46-28 W4M
Location Alias 2: 00/02-35-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 35
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO. 2-35
Operator Name: Imperial Oil Resources Limited
License Number: 0008582
License Date: 1954-10-14
License Status: Abandoned
Spud Date: 1954-10-17
Final Drill Date: 1954-11-23
Well Total Depth: 2172.90 m
Surface Hole Latitude: 53.005380
Surface Hole Longitude: -113.954061

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-14 Obtained License
1954-11-17 Production Casing Operation Performed
1954-11-23 Finished Drilling
1954-11-23 Well Mode changed to Drilled and Cased
1954-11-26 Well Log Performed
1954-12-06 Perforation Treatment Performed - Open-Hole Completion
1954-12-18 Well Began Production
1954-12-18 Well Fluid changed to Crude Oil
1954-12-18 Well Mode changed to Flowing
1956-07-05 Well Log Performed
1956-10-11 Well Log Performed
1956-10-12 Well Log Performed
1957-05-23 Well Log Performed
1957-10-03 Well Log Performed
1958-07-15 Well Log Performed
1959-07-21 Well Log Performed
1960-07-04 Well Log Performed
1961-07-12 Well Log Performed
1963-11-28 Well Log Performed
1963-11-29 Well Log Performed
1965-01-13 Well Log Performed
1965-01-14 Well Log Performed
1965-08-09 Well Log Performed
1965-12-20 Well Log Performed
1966-08-17 Well Log Performed
1966-12-20 Well Log Performed
1967-05-17 Well Log Performed
1967-11-07 Well Log Performed
1968-05-15 Well Log Performed
1968-11-12 Well Log Performed
1969-05-22 Well Log Performed
1969-10-29 Well Log Performed
1970-05-06 Well Log Performed
1970-10-28 Well Log Performed
1971-05-17 Well Log Performed
1971-11-17 Well Log Performed
1972-06-09 Well Log Performed
1972-11-21 Well Log Performed
1973-05-25 Well Log Performed
1973-11-30 Well Log Performed
1974-05-30 Well Log Performed
1974-11-25 Well Log Performed
1975-05-27 Well Log Performed
1975-11-19 Well Log Performed
1976-05-25 Well Log Performed
1976-11-27 Well Log Performed
1977-06-03 Well Log Performed
1977-12-13 Well Log Performed
1978-05-30 Well Log Performed
1978-11-22 Well Log Performed
1979-05-14 Well Log Performed
1979-11-19 Well Log Performed
1980-05-15 Well Log Performed
1981-05-20 Well Log Performed
1981-10-13 Well Log Performed
1982-07-07 Well Log Performed
1983-10-21 Well Log Performed
1984-05-16 Well Log Performed
1985-10-08 Well Log Performed
1985-10-12 Liner Casing Operation Performed
1985-10-12 Perforation Treatment Performed - Cement Squeeze
1985-10-13 Well Log Performed
1985-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-14 Perforation Treatment Performed - Jet Perforation
1985-10-14 Well Log Performed
1986-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-11 Perforation Treatment Performed - Jet Perforation
1986-09-11 Well Log Performed
1986-09-16 Well Fluid changed to Crude Oil
1986-09-16 Well Mode changed to Pumping
1988-05-31 Perforation Treatment Performed - Jet Perforation
1988-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-13 Perforation Treatment Performed - Cement Squeeze
1989-10-13 Well Log Performed
1992-04-13 Perforation Treatment Performed - Jet Perforation
1992-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-07 Perforation Treatment Performed - Jet Perforation
1994-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-05 Perforation Treatment Performed - Jet Perforation
1996-01-06 Perforation Treatment Performed - Cement Squeeze
1996-01-08 Perforation Treatment Performed - Jet Perforation
1996-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-04 Perforation Treatment Performed - Jet Perforation
1997-02-04 Well Log Performed
1997-08-01 Well Fluid changed to Crude Oil
1997-08-01 Well Mode changed to Suspended
1997-10-28 Perforation Treatment Performed - Jet Perforation
1997-10-28 Well Log Performed
1997-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-01 Well Fluid changed to Crude Oil
1997-11-01 Well Mode changed to Pumping
1999-01-01 Well Fluid changed to Crude Oil
1999-01-01 Well Mode changed to Suspended
2002-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-07 Perforation Treatment Performed - Cement Plug
2002-07-07 Plug Back Performed
2002-07-07 Well Fluid changed to Crude Oil
2002-07-07 Well Mode changed to Abandoned Zone
2002-07-08 Perforation Treatment Performed - Cement Plug
2002-07-08 Plug Back Performed
2003-08-22 Well Abandoned
2003-08-22 Well Fluid changed to Crude Oil
2003-08-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-12-06 Open Hole/Barefoot Completion 2048.30 2172.90 0
1992-04-13 Perforation 2137.90 2138.90 20
1992-04-14 Acid Treatment 2137.90 2138.90 0
1994-11-07 Perforation 2132.50 2133.00 13
1994-11-10 Acid Treatment 2132.50 2133.00 0
1996-01-05 Perforation 2126.70 2127.00 72
1996-01-06 Cement Squeeze 2126.70 2133.00 0
1996-01-08 Perforation 2128.00 2128.50 20
1996-01-09 Acid Treatment 2128.00 2128.50 0
1997-02-04 Perforation 2123.20 2123.80 20
1997-02-04 Acid Treatment 2123.20 2123.80 0
1985-10-12 Cement Squeeze 2048.30 2172.90 0
1997-10-28 Perforation 2113.50 2114.50 20
1997-10-29 Acid Treatment 2113.50 2114.50 0
2002-07-07 Packing Device Capped w/Cement 1993.30 2100.00 0
2002-07-07 Cement Plug 1524.00 1681.90 0
2002-07-08 Cement Plug 382.60 1524.00 0
1985-10-14 Perforation 2149.20 2149.70 13
1985-10-14 Acid Treatment 2149.20 2149.70 0
1986-09-11 Perforation 2147.30 2147.80 7
1986-09-11 Acid Treatment 2147.30 2147.80 0
1988-05-31 Perforation 2143.80 2144.80 14
1988-06-01 Acid Treatment 2143.80 2144.80 0
1989-10-13 Cement Squeeze 2147.30 2147.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1985 1245 0.0 0.0 0.0
1986 6360 0.0 0.0 0.0
1987 8608 0.0 0.0 0.0
1988 8259 0.0 0.0 0.0
1989 7820 0.0 0.0 0.0
1990 7568 0.0 0.0 0.0
1991 3810 0.0 0.0 0.0
1992 5485 0.0 0.0 0.0
1993 7539 0.0 0.0 0.0
1994 8475 0.0 0.0 0.0
1995 8091 0.0 0.0 0.0
1996 8313 0.0 0.0 0.0
1997 2103 0.0 0.0 0.0
1998 4854 0.0 0.0 0.0

For data sources see[5]

References