X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282609000

Well Details

Well ID: 0464282609000
Loading map...
Location: 00/09-26-046-28W4/0
Location Alias: 00/09-26-46-28 W4M
Location Alias 2: 00/09-26-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 26
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO 9-26
Operator Name: Imperial Oil Resources Limited
License Number: 0007675
License Date: 1954-02-11
License Status: Abandoned
Spud Date: 1954-06-28
Final Drill Date: 1954-07-29
Well Total Depth: 2159.50 m
Surface Hole Latitude: 52.997935
Surface Hole Longitude: -113.949208

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-02-11 Obtained License
1954-07-24 Liner Casing Operation Performed
1954-07-29 Finished Drilling
1954-07-29 Well Mode changed to Drilled and Cased
1954-08-09 Perforation Treatment Performed - Jet Perforation
1954-08-10 Well Began Production
1954-08-10 Well Fluid changed to Crude Oil
1954-08-10 Well Mode changed to Flowing
1984-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-11 Well Log Performed
1984-09-14 Well Fluid changed to Crude Oil
1984-09-14 Well Mode changed to Pumping
1988-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-29 Well Log Performed
1989-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-30 Well Log Performed
1990-11-29 Well Log Performed
1990-12-03 Well Log Performed
1990-12-05 Well Log Performed
1990-12-10 Well Log Performed
1992-05-25 Perforation Treatment Performed - Jet Perforation
1992-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-28 Well Log Performed
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-08 Perforation Treatment Performed - Jet Perforation
1996-12-08 Well Log Performed
1997-09-08 Perforation Treatment Performed - Jet Perforation
1997-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-10 Perforation Treatment Performed - Jet Perforation
1998-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Suspended
2002-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-11 Perforation Treatment Performed - Cement Plug
2002-06-11 Plug Back Performed
2002-06-11 Well Fluid changed to Crude Oil
2002-06-11 Well Mode changed to Abandoned Zone
2002-06-12 Perforation Treatment Performed - Jet Perforation
2002-06-13 Perforation Treatment Performed - Remedial Casing
2002-06-14 Perforation Treatment Performed - Jet Perforation
2002-06-14 Perforation Treatment Performed - Remedial Casing
2002-06-14 Well Log Performed
2002-12-13 Well Abandoned
2002-12-13 Well Fluid changed to Crude Oil
2002-12-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-08-09 Perforation 2148.20 2154.30 13
1996-12-08 Acid Treatment 2131.20 2131.80 0
1997-09-08 Perforation 2122.00 2123.00 16
1997-09-09 Acid Treatment 2122.00 2123.00 0
1998-03-10 Perforation 2114.70 2115.70 16
1998-03-11 Acid Treatment 2114.70 2115.70 0
2002-06-11 Packing Device Capped w/Cement 1967.10 2106.00 0
2002-06-11 Cement Plug 1531.00 1692.00 0
2002-06-12 Perforation 608.00 608.50 26
2002-06-13 Remedial Casing Cementing 608.00 608.50 0
2002-06-14 Perforation 235.00 235.50 26
1984-01-31 Acid Treatment 2148.20 2154.30 0
2002-06-14 Remedial Casing Cementing 235.00 235.50 0
1988-03-07 Acid Treatment 2148.20 2154.30 0
1988-03-12 Acid Treatment 2148.20 2154.30 0
1989-07-30 Acid Treatment 2148.20 2154.30 0
1992-05-25 Perforation 2142.10 2142.70 20
1992-05-26 Acid Treatment 2142.10 2142.70 0
1996-09-29 Perforation 2138.30 2139.00 17
1996-12-08 Perforation 2131.20 2131.80 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 312 0.0 0.0 0.0
1984 4555 0.0 0.0 0.0
1985 5399 0.0 0.0 0.0
1986 5681 0.0 0.0 0.0
1987 7410 0.0 0.0 0.0
1988 4992 0.0 0.0 0.0
1989 7762 0.0 0.0 0.0
1990 7628 0.0 0.0 0.0
1991 7426 0.0 0.0 0.0
1992 3025 0.0 0.0 0.0
1993 4968 0.0 0.0 0.0
1994 8192 0.0 0.0 0.0
1995 8258 0.0 0.0 0.0
1996 8106 0.0 0.0 0.0
1997 7054 0.0 0.0 0.0
1998 6116 0.0 0.0 0.0
1999 439 0.0 0.0 0.0

For data sources see[5]

References